Skip to main content
PermitBase

Solar PV Permit — Self-Issue Residential Rooftop (Grid-Tied) and Residential Miscellaneous (All Other Solar) in Unincorporated Coconino County, Arizona

Coconino County offers a streamlined Self-Issue Building Permit for grid-tied, residential, roof-mounted photovoltaic (PV) installations (excluding battery storage) performed by a licensed professional installer, bypassing full plan review. All other solar installations — ground-mount, battery storage, non-professional installer, properties in a Historic Preservation district or FEMA Special Flood Hazard Area, or panel upgrades/derates — must use the Residential Miscellaneous permit category instead. Subject to the statewide baseline of A.R.S. § 9-468.

Verified 2026-07-20 · Source

When you need this permit

  • Self-Issue Solar eligibility (ALL must be met): Arizona-licensed contractor for PV installations; residential (single-family or duplex) rooftop installation only; structure supporting the PV system must be a legal, permitted, code-compliant structure; no battery storage; no ballasted or ground-mounted systems; not located within a Historic Preservation district or FEMA Special Flood Hazard Area; no existing PV or energy storage systems on the property; no panel upgrades or derating as part of this permit (those go through Residential Miscellaneous); PV system roof loading not to exceed 4 psf dead load; 400-amp maximum electrical service, single phase only; maximum 2 DC strings in parallel; one module per microinverter if using microinverters; only one module type; up to two inverter types for string inverters, up to one inverter type for microinverters Contractor
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com): My Portal > Apply Online > Building Division > Self-Issue Solar
  • A building inspector will visit the site to inspect the project; proof of eligibility will be requested at inspection
  • Must meet the minimum standards of A.R.S. § 9-468 (Solar construction permits; standards; definition), the statewide baseline applicable to all Arizona jurisdictions including counties
  • All other solar installations (ground-mount, off-grid, non-professional installer, battery storage, panel upgrades/derates, or ineligible-district properties) must apply under the Residential Miscellaneous permit category instead

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Photovoltaic systems up to 10 kilowatt (kW)Coconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Electrical section. RE-VERIFIED 2026-07-20 by fetching the live PDF and re-extracting text with reading order preserved (the earlier 'row/column ambiguity' was an artifact of a different extraction mode) — the clean, unambiguous line reads 'Photovoltaic systems up to 10 kilowatt (kw) $75.00'.
$75.00
Photovoltaic systems over 10 kilowatt (kW)Coconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Electrical section. RE-VERIFIED 2026-07-20 by direct re-extraction of the live PDF: 'Photovoltaic systems over 10 kilowatt (kw) $75.00 each plus $5.00 for each additional kw over 10'.
$75.00 each plus $5.00 for each additional kW over 10

Review timeline

Plan review
Not published — contact the department

How long did your Solar PV Permit — Self-Issue Residential Rooftop (Grid-Tied) and Residential Miscellaneous (All Other Solar) permit actually take in Unincorporated Coconino County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Site Eligibility / Final Inspection

    Building inspector visits the site to verify eligibility criteria and inspect panel mounting, racking attachment, roof penetration sealing, and electrical connections per 2017 NEC

See the full Unincorporated Coconino County inspection guide — scheduling & re-inspection fees →

Tips

  • Coconino County's Self-Issue Solar track excludes battery storage entirely, and excludes ground-mounted/ballasted systems, properties with existing PV/energy storage, and properties in a Historic Preservation district or FEMA Special Flood Hazard Area — any of these disqualifying factors routes the project to the Residential Miscellaneous permit category instead.
  • The Self-Issue track has firm technical limits: 400-amp maximum single-phase service, maximum 2 DC strings in parallel, one module type, and specific inverter-type caps — review the BD-Self-Issue Solar Submittal Requirements sheet in full before assuming eligibility.
  • At minimum, Coconino County must comply with A.R.S. § 9-468's baseline requirements for residential solar construction permits (plan content and review standards), the same statewide floor that applies to every Arizona municipality and county.

Frequently asked questions

Unincorporated Coconino County requires a solar pv permit — self-issue residential rooftop (grid-tied) and residential miscellaneous (all other solar) for: Self-Issue Solar eligibility (ALL must be met): Arizona-licensed contractor for PV installations; residential (single-family or duplex) rooftop installation only; structure supporting the PV system must be a legal, permitted, code-compliant structure; no battery storage; no ballasted or ground-mounted systems; not located within a Historic Preservation district or FEMA Special Flood Hazard Area; no existing PV or energy storage systems on the property; no panel upgrades or derating as part of this permit (those go through Residential Miscellaneous); PV system roof loading not to exceed 4 psf dead load; 400-amp maximum electrical service, single phase only; maximum 2 DC strings in parallel; one module per microinverter if using microinverters; only one module type; up to two inverter types for string inverters, up to one inverter type for microinverters; Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com): My Portal > Apply Online > Building Division > Self-Issue Solar; A building inspector will visit the site to inspect the project; proof of eligibility will be requested at inspection; Must meet the minimum standards of A.R.S. § 9-468 (Solar construction permits; standards; definition), the statewide baseline applicable to all Arizona jurisdictions including counties; All other solar installations (ground-mount, off-grid, non-professional installer, battery storage, panel upgrades/derates, or ineligible-district properties) must apply under the Residential Miscellaneous permit category instead. If your project isn't listed, confirm with Coconino County Community Development Department, Building and Safety Division at 928-679-8850 (toll-free 800-559-9289); fax 928-679-8851 before starting work.

In Unincorporated Coconino County, the published Photovoltaic systems up to 10 kilowatt (kW) is: $75.00. Additional published fees: Photovoltaic systems over 10 kilowatt (kW) — $75.00 each plus $5.00 for each additional kW over 10. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Unincorporated Coconino County does not publish a plan-review timeline for this permit. Contact Coconino County Community Development Department, Building and Safety Division at 928-679-8850 (toll-free 800-559-9289); fax 928-679-8851 for current turnaround.

You'll need: BD-Self-Issue Solar Submittal Requirements (Information Sheet); Climatic and Geographic Design Criteria (Snow Loads and Roof Plans). See the required-documents checklist on this page for details on each.

Unincorporated Coconino County requires 1 inspection(s) for a solar pv permit — self-issue residential rooftop (grid-tied) and residential miscellaneous (all other solar), in order: Site Eligibility / Final Inspection. Schedule each through Coconino County Community Development Department, Building and Safety Division (928-679-8850 (toll-free 800-559-9289); fax 928-679-8851).

Apply through Coconino County Community Development Department, Building and Safety Division at 2500 N. Fort Valley Road, Building 1, Flagstaff, AZ 86001-1287. Phone: 928-679-8850 (toll-free 800-559-9289); fax 928-679-8851, email: plansubmittals@coconino.az.gov. Office hours: Monday-Friday, 8:00 a.m.-5:00 p.m. Director: Jay Christelman; Assistant Director: Jess McNeely. All building permit applications and document submittals for unincorporated Coconino County are made online through the Online Permit Applications portal (co-coconino-az.smartgovcommunity.com); only PDF files are accepted for plan review submittals.. Official information: https://www.coconino.az.gov/624/Building-and-Safety.

Unincorporated Coconino County, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 11 for counties). Coconino County Community Development Department, Building and Safety Division, is the code enforcement agency and building official for all unincorporated areas of the county (areas outside Flagstaff, Page, Fredonia, Tusayan, and Williams, and outside the Coconino County portion of Sedona).; As of this record's verification date (July 2026), the Coconino County Building Division's current adopted codes are: 2018 International Residential Code (IRC); 2018 International Building Code (IBC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Plumbing Code (IPC); 2018 International Energy Conservation Code (IECC); 2018 International Existing Building Code (IEBC); and 2017 National Electrical Code (NEC). Adopted via County Ordinance 2019-10 ('2019-10 Coconino County Building Ordinance — adopting the 2018 Suite of Building Codes with Amendments'). Source: Coconino County Building Codes, Ordinances, Design Criteria page (coconino.az.gov/2391/Building-Codes-Ordinances-Design-Criteri), 'Current Codes and Ordinances' section, rendered/read directly July 2026.; Every six years the Community Development Department, in partnership with the Building Safety Advisory Board (BSAB), leads a process to adopt updated codes. As of this record's date, the County has begun a public process toward adopting the 2024 ICC code suite and 2023 NEC — an open house was held March 23, 2026 at 2500 N. Fort Valley Rd. (Thomas Auditorium), and a slide deck covering the 2024 IECC, IBC, IPC, IMC, IFGC and 2023 NEC changes was presented — but as of this record's lastVerified date that update had NOT yet been formally adopted. The 2018 ICC / 2017 NEC baseline remains the current, controlling code. Source: Coconino County Building Codes, Ordinances, Design Criteria page, 'Building Code Adoption' section.; Additional adopted county ordinances/codes beyond the base ICC/NEC suite: Potable Rainwater Collection and Distribution Systems Code (an amendment to the IRC); 2020-11 Earthen Building and Construction Ordinance (regulating quality, type of material, testing, and workmanship for earthen buildings/structures). Source: Coconino County Building Codes, Ordinances, Design Criteria page.; The Innovative Materials and Systems Pilot Program (part of the 2019-10 Ordinance) allows owner-builders to seek an exemption from standard adopted-code provisions when building with alternative methods and materials, under conditions evaluated by the Building Official — administered in coordination with the County's broader 'Building with Alternative Methods and Materials' / Alternative Methods and Materials Permit Program (ATAG certification and consultation process) run out of the Community Development Department. Source: Coconino County Building Codes, Ordinances, Design Criteria page; Coconino County Community Development page (coconino.az.gov/136/Community-Development), 'Building with Alternative Methods and Materials' section.; Manufactured homes and factory-built buildings follow a joint state/local structure: the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) sets manufacturer/installer/retailer licensing and issues state-level installation permits, while local site/foundation/utility compliance is handled by Coconino County under a dedicated Manufactured Homes and Factory Built Building Permit fee schedule (Part III of the county's Building Permitting Fees) and a 7-business-day review ceiling under the county's own timeframes policy. Source: Coconino County Online Permit Applications page (coconino.az.gov/2390/Online-Permit-Applications), 'Manufactured Homes & Factory Built Projects' section; Coconino County Building Permitting Fees schedule, Part III.; Properties within the Sedona Fire District (including Oak Creek Canyon) are additionally subject to the 2018 Wildland and Urban Interface Codes as adopted by that fire district; fire suppression systems are required in addition to Wildland-Urban-Interface-code compliance, and the Sedona Fire Marshal conducts concurrent plan reviews with Coconino County to ensure compliance. Source: Coconino County Building Codes, Ordinances, Design Criteria page, 'Building Within the Sedona Fire District' section.. Local amendments apply — see the Unincorporated Coconino County overview page for the full list.

Yes — a Self-Issue Residential Rooftop Grid-Tied Solar Permit is available for professional installations meeting a specific eligibility checklist (no battery storage, no ground-mount, 400-amp max service, single module type, not in a Historic Preservation district or flood hazard area, etc.), bypassing full plan review. No exact published turnaround time was found for this self-issue track specifically; ineligible installations use the general Residential Miscellaneous permit category. Confirm eligibility and current turnaround with Coconino County Building and Safety (928-679-8850). Source: https://www.coconino.az.gov/2390/Online-Permit-Applications

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Coconino County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.