Electrical Permit in Unincorporated Coconino County, Arizona
Required for electrical wiring, service equipment, fixtures, and outlet installations in unincorporated Coconino County, governed by the 2017 National Electrical Code (NEC). Billed under the county's per-unit Table IV Electrical fee schedule; qualifying like-for-like or minor work may use the county's Residential Self-Issue Permit track. Applications submitted online through the SmartGov portal.
Verified 2026-07-07 · Source
When you need this permit
- Required for wiring, fixtures, outlets, service equipment, and panel work in unincorporated Coconino County
- Governed by the 2017 NEC as adopted by Coconino County Ordinance 2019-10
- Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
- Like-for-like replacement, service panel upgrades, and similar minor electrical work may qualify for the county's Residential Self-Issue Permit process rather than full plan review — confirm eligibility with the Building Division
- Electric Plan required for full-review submittals: light/switch locations, grounding electrode type, main/sub-panel locations, panel schedule, symbol schedule, smoke/CO detector locations, receptacle locations
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring and box placement before wall cover; or service equipment installed before energizing
- 2
Final
All electrical work complete and operational per 2017 NEC
See the full Unincorporated Coconino County inspection guide — scheduling & re-inspection fees →
Tips
- Straightforward like-for-like electrical replacement or a service panel upgrade may qualify for the county's Residential Self-Issue Permit process — ask the Building Division (928-679-8850) whether your scope is eligible before assuming a full plan-review timeline applies.
- The minimum fee for any single Coconino County permit is $50.00, inclusive of plan review unless additional/separate plan review is required.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Coconino County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Coconino County
Electrical Permit in other cities
Compare electrical permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Coconino County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Coconino County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →