Change of Use / Change of Occupancy Permit in Unincorporated Coconino County, Arizona
Required when the use of an existing property, building or structure changes in unincorporated Coconino County. The Zoning Ordinance requires a Building Permit prior to any change in use and bars issuance of a Certificate of Occupancy until the Community Development Director has authorized the change; the county's fee schedule prices it as a 'Change in tenant occupancies' item, with any accompanying tenant improvements billed on bid value.
Verified 2026-08-15 · Source
When you need this permit
- Zoning Ordinance Section 1.12.A.1 (Zoning Compliance Review): a Building Permit or Engineering Permit as required by the Building Code and the Engineering Design and Construction Manual 'shall be obtained prior to the construction, reconstruction, alteration, relocation, or change in use of any property, building or other structure. Plan review, by the Community Development Director or designee, is required for all uses and/or developments prior to the issuance of a building and/or grading permit.'
- Zoning Ordinance Section 1.12.A.2: no building permit or other permit required by the Ordinance may be lawfully issued, 'nor shall a Certificate of Occupancy be granted until the Community Development Director or designee has given authorization indicating all requirements of this Ordinance, all conditions and stipulations of approval, and any other specific project-related requirements have been met'
- Zoning Ordinance Section 1.12.A.5: if a use permit or Variance is required for the new use, it must be obtained BEFORE issuance of any building or construction permit
- Zoning Ordinance Section 1.12.A.6: a Floodplain Permit is required prior to any change in use of a building or structure located in a FEMA Special Flood Hazard Area
- The technical requirements for a change of occupancy come from the adopted International Existing Building Code — the 2024 IEBC under Ordinance 2026-03 (effective June 2, 2026), with plan sets designed to the 2018 IEBC accepted through December 31, 2026
- Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com); only PDF format is accepted for plan review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Change of occupancy inspection
Verifies the space as altered complies with the adopted International Existing Building Code for the new occupancy classification; billed as the 'Change in tenant occupancies' item on the county's Other Inspections fee table
- 2
Final / Certificate of Occupancy
A Certificate of Occupancy cannot be granted until the Community Development Director or designee authorizes that all Zoning Ordinance requirements and conditions of approval have been met (Zoning Ordinance Section 1.12.A.2)
See the full Unincorporated Coconino County inspection guide — scheduling & re-inspection fees →
Tips
- Get the zoning question answered first. Section 1.12.A.5 requires any use permit or variance for the new use to be in hand BEFORE a building or construction permit can be issued — starting with the building application will stall the project.
- The $120.00 'Change in tenant occupancies' line is the occupancy-change item only. Any physical work that comes with it — a tenant improvement build-out — is billed separately on bid value, and bid value is used for any commercial project valuation over $5,000.00.
- Code edition timing matters right now: Ordinance 2026-03 put the 2024 IEBC in force June 2, 2026, but the county will accept fully submitted applications designed to the 2018 IEBC through December 31, 2026. Choosing the edition changes the compliance path for a change of occupancy.
- If the building sits in a FEMA Special Flood Hazard Area, Section 1.12.A.6 requires a Floodplain Permit for a change in use — even where no construction is proposed.
- Coconino County adopts no International Fire Code; where the new occupancy triggers fire-code questions, the fire district having jurisdiction is the authority, not the County.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-15.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Coconino County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Coconino County
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Unincorporated Coconino County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Coconino County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →