Skip to main content
PermitBase

Commercial Building Permit (New Construction, Tenant Improvement, Remodel) in Unincorporated Coconino County, Arizona

Required for new commercial, industrial, and multi-family buildings, tenant improvements, remodels, and change-of-use projects in unincorporated Coconino County. Reviewed against the 2018 IBC with county amendments. Applications and plans submitted online through the SmartGov portal, following the county's published Building Permit Procedures and Minimum Plan Requirements for Commercial Projects.

Verified 2026-07-07 · Source

When you need this permit

  • Required for new commercial, industrial, and multi-family construction, tenant improvements, remodels, and change-of-occupancy projects in unincorporated Coconino County
  • Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com)
  • Follow the county's Building Permit Procedures and Minimum Plan Requirements for Commercial Projects document for required plan content
  • Pay the applicable Plan Review Deposit at submittal (tiered by square footage per Table I)
  • Bid value is used for any commercial project valuation in excess of $5,000
  • Architect's stamp required for new construction/additions/alterations of 3,000 sq ft or more

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plan Review Deposit — New Commercial (by size)Coconino County Building Permitting Fees schedule (effective 09/01/2021), Part II, Table I.
Up to 1,000 sq ft: $300.00; 1,000-3,000 sq ft: $600.00; 3,000-10,000 sq ft: $900.00; 10,000-20,000 sq ft: $1,500.00; Over 20,000 sq ft: $2,500.00
Plan Review Deposit — Interior commercial remodels and tenant improvementsPart II, Table I.
$100.00
Building Permit Fee — valuation-based (Table II, ICC Building Valuation Data, or Table III)Coconino County Building Permitting Fees schedule, Parts I-III.
Table II: building gross area × Square Foot Construction Cost (by occupancy group/construction type) × 0.010 multiplier; shell-only buildings deduct 20 percent. Table III valuation bands apply where submitted construction valuation is used (same bands as the residential permit type in this file). Bid value is used for any commercial project valuation over $5,000.
Plan Review FeePart I, Section D.
65% of the calculated Building Permit Fee
Change in tenant occupancyCoconino County Building Permitting Fees schedule, 'Other Inspections Fees' section.
$120.00

Review timeline

Plan reviewUnincorporated Coconino County’s published plan-review target
105–105 business days

How long did your Commercial Building Permit (New Construction, Tenant Improvement, Remodel) permit actually take in Unincorporated Coconino County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing/Foundation

    Before concrete pour — per 2018 IBC

  2. 2

    Framing / Structural

    After structural framing complete, before wall cover

  3. 3

    Final

    All work complete per approved plans; Certificate of Occupancy issued

See the full Unincorporated Coconino County inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial Projects carry a 105-day total governing timeframe under Community Development Substantive Policy 2025-01 (35 business days intake + 70 calendar days substantive review) — this figure is unchanged from the county's prior June 2020 Permit Review Timeframes document and is reconfirmed by the current 2025-01 policy.
  • Bid value is used for any commercial project valuation in excess of $5,000 — have a contractor bid ready to support your valuation.
  • Shell-only commercial buildings deduct 20 percent from the Table II valuation calculation.

Frequently asked questions

Unincorporated Coconino County requires a commercial building permit (new construction, tenant improvement, remodel) for: Required for new commercial, industrial, and multi-family construction, tenant improvements, remodels, and change-of-occupancy projects in unincorporated Coconino County; Apply online through the SmartGov portal (co-coconino-az.smartgovcommunity.com); Follow the county's Building Permit Procedures and Minimum Plan Requirements for Commercial Projects document for required plan content; Pay the applicable Plan Review Deposit at submittal (tiered by square footage per Table I); Bid value is used for any commercial project valuation in excess of $5,000; Architect's stamp required for new construction/additions/alterations of 3,000 sq ft or more. If your project isn't listed, confirm with Coconino County Community Development Department, Building and Safety Division at 928-679-8850 (toll-free 800-559-9289); fax 928-679-8851 before starting work.

In Unincorporated Coconino County, the published Plan Review Deposit — New Commercial (by size) is: Up to 1,000 sq ft: $300.00; 1,000-3,000 sq ft: $600.00; 3,000-10,000 sq ft: $900.00; 10,000-20,000 sq ft: $1,500.00; Over 20,000 sq ft: $2,500.00. Additional published fees: Plan Review Deposit — Interior commercial remodels and tenant improvements — $100.00; Building Permit Fee — valuation-based (Table II, ICC Building Valuation Data, or Table III) — Table II: building gross area × Square Foot Construction Cost (by occupancy group/construction type) × 0.010 multiplier; shell-only buildings deduct 20 percent. Table III valuation bands apply where submitted construction valuation is used (same bands as the residential permit type in this file). Bid value is used for any commercial project valuation over $5,000.; Plan Review Fee — 65% of the calculated Building Permit Fee; Change in tenant occupancy — $120.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

105 days total (35 business days intake + 70 calendar days substantive review), per Community Development Substantive Policy 2025-01 (effective 4/28/25, updated 5/29/26), under authority of A.R.S. § 11-1605. Source: https://www.coconino.az.gov/DocumentCenter/View/67482/Permit-Review-Dept-Policy

You'll need: Building Permit Procedures and Minimum Plan Requirements for Commercial Projects (PDF). See the required-documents checklist on this page for details on each.

Unincorporated Coconino County requires 3 inspection(s) for a commercial building permit (new construction, tenant improvement, remodel), in order: Footing/Foundation, Framing / Structural, Final. Schedule each through Coconino County Community Development Department, Building and Safety Division (928-679-8850 (toll-free 800-559-9289); fax 928-679-8851).

Apply through Coconino County Community Development Department, Building and Safety Division at 2500 N. Fort Valley Road, Building 1, Flagstaff, AZ 86001-1287. Phone: 928-679-8850 (toll-free 800-559-9289); fax 928-679-8851, email: plansubmittals@coconino.az.gov. Office hours: Monday-Friday, 8:00 a.m.-5:00 p.m. Director: Jay Christelman; Assistant Director: Jess McNeely. All building permit applications and document submittals for unincorporated Coconino County are made online through the Online Permit Applications portal (co-coconino-az.smartgovcommunity.com); only PDF files are accepted for plan review submittals.. Official information: https://www.coconino.az.gov/624/Building-and-Safety.

Unincorporated Coconino County, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 11 for counties). Coconino County Community Development Department, Building and Safety Division, is the code enforcement agency and building official for all unincorporated areas of the county (areas outside Flagstaff, Page, Fredonia, Tusayan, and Williams, and outside the Coconino County portion of Sedona).; As of this record's verification date (July 2026), the Coconino County Building Division's current adopted codes are: 2018 International Residential Code (IRC); 2018 International Building Code (IBC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Plumbing Code (IPC); 2018 International Energy Conservation Code (IECC); 2018 International Existing Building Code (IEBC); and 2017 National Electrical Code (NEC). Adopted via County Ordinance 2019-10 ('2019-10 Coconino County Building Ordinance — adopting the 2018 Suite of Building Codes with Amendments'). Source: Coconino County Building Codes, Ordinances, Design Criteria page (coconino.az.gov/2391/Building-Codes-Ordinances-Design-Criteri), 'Current Codes and Ordinances' section, rendered/read directly July 2026.; Every six years the Community Development Department, in partnership with the Building Safety Advisory Board (BSAB), leads a process to adopt updated codes. As of this record's date, the County has begun a public process toward adopting the 2024 ICC code suite and 2023 NEC — an open house was held March 23, 2026 at 2500 N. Fort Valley Rd. (Thomas Auditorium), and a slide deck covering the 2024 IECC, IBC, IPC, IMC, IFGC and 2023 NEC changes was presented — but as of this record's lastVerified date that update had NOT yet been formally adopted. The 2018 ICC / 2017 NEC baseline remains the current, controlling code. Source: Coconino County Building Codes, Ordinances, Design Criteria page, 'Building Code Adoption' section.; Additional adopted county ordinances/codes beyond the base ICC/NEC suite: Potable Rainwater Collection and Distribution Systems Code (an amendment to the IRC); 2020-11 Earthen Building and Construction Ordinance (regulating quality, type of material, testing, and workmanship for earthen buildings/structures). Source: Coconino County Building Codes, Ordinances, Design Criteria page.; The Innovative Materials and Systems Pilot Program (part of the 2019-10 Ordinance) allows owner-builders to seek an exemption from standard adopted-code provisions when building with alternative methods and materials, under conditions evaluated by the Building Official — administered in coordination with the County's broader 'Building with Alternative Methods and Materials' / Alternative Methods and Materials Permit Program (ATAG certification and consultation process) run out of the Community Development Department. Source: Coconino County Building Codes, Ordinances, Design Criteria page; Coconino County Community Development page (coconino.az.gov/136/Community-Development), 'Building with Alternative Methods and Materials' section.; Manufactured homes and factory-built buildings follow a joint state/local structure: the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) sets manufacturer/installer/retailer licensing and issues state-level installation permits, while local site/foundation/utility compliance is handled by Coconino County under a dedicated Manufactured Homes and Factory Built Building Permit fee schedule (Part III of the county's Building Permitting Fees) and a 7-business-day review ceiling under the county's own timeframes policy. Source: Coconino County Online Permit Applications page (coconino.az.gov/2390/Online-Permit-Applications), 'Manufactured Homes & Factory Built Projects' section; Coconino County Building Permitting Fees schedule, Part III.; Properties within the Sedona Fire District (including Oak Creek Canyon) are additionally subject to the 2018 Wildland and Urban Interface Codes as adopted by that fire district; fire suppression systems are required in addition to Wildland-Urban-Interface-code compliance, and the Sedona Fire Marshal conducts concurrent plan reviews with Coconino County to ensure compliance. Source: Coconino County Building Codes, Ordinances, Design Criteria page, 'Building Within the Sedona Fire District' section.. Local amendments apply — see the Unincorporated Coconino County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Coconino County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Coconino County.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.