Commercial Building Permit — Town of Payson, Arizona · Requirements sheet
Verified 2026-08-01 · Source: https://www.egovlink.com/public_documents300/payson/published_documents/Building-Department/Commmercial-Construction-Checklist.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Town of Payson, Arizona
Required for new commercial building construction and for interior/exterior alterations (tenant improvements) to existing commercial buildings in Payson. Reviewed against the 2018 IBC, 2018 IPC, 2018 IMC, and 2017 NEC per the Town of Payson's own Commercial Construction Checklist. Tenant improvement work is NOT a separate permit type in Payson: it is submitted using the same Commercial Construction Checklist and Building Permit Application as new commercial construction, and billed the same valuation-based Building Permit Fee (Chapter 150 Table 3-A) plus 65% plan review fee. The checklist's only distinction between 'building' and 'tenant space' is for the registered-design-professional-stamp threshold (see requirements below), not a separate application, checklist, or fee schedule.
Verified 2026-08-01 · Source
When you need this permit
- Building permit required for new commercial building construction and for tenant improvements (interior/exterior alterations to an existing commercial building); both use the same Town of Payson Commercial Construction Checklist (Revised 7/20/20)
- Design Review Approval is required before plans can be submitted for building permit review, per the Commercial Construction Checklist
- Reviewed against 2018 IBC, 2018 IPC, and 2018 IMC, plus 2017 NEC, per the Commercial Construction Checklist
- Electronic submittal (email or thumb drive) is preferred; if paper copies are submitted, 9 full sets are required (10 sets if the project includes a commercial kitchen)
- A registered design professional (architect/engineer) stamp is required, per A.R.S. § 32-144, if the building (not the tenant space alone) is 3,000 sq. ft. or more, is over two stories, or has 20 or more occupants — consistent with the same three-part threshold stated in the Building Division FAQs
- Fire sprinklers are required for commercial buildings 4,800 sq. ft. or larger, per Town Ordinance #912 (distinct from the residential 4,800-sq.-ft. IRC sprinkler-installation exemption elsewhere in this file)
- Commercial submittal package (per the Commercial Construction Checklist) includes, as applicable to the project: Permit Application, Site/Civil Plans, Landscape Plan, Building Occupancy Group designation, Type of Construction, Structural Engineering, Truss Calculations, Soils Report, Asbestos Report, Contractor Bonding Certificate, Sanitary District Approval, Fire Sprinkler Plans, Accessibility Provisions, Temporary Power Agreement, Contractor License Verification, and Business License Verification Contractor
- If the Property Owner and Building Owner are different entities, both names must be reflected adjacent to each other in the Owner Box on all Building Permit copies, per the Commercial Construction Checklist
- Building permit fee is valuation-based (Chapter 150 Table 3-A, same table used for residential 'New Home & Commercial' fee calculation); plan review fee is 65% of the calculated Building Permit fee
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (Structural / MEP)
Structural framing, connections, and mechanical/electrical/plumbing rough-in verified before concealment, per 2018 IBC/IPC/IMC and 2017 NEC
- 2
Final / Certificate of Occupancy
Completed work verified against approved plans prior to Certificate of Occupancy
See the full Town of Payson inspection guide — scheduling & re-inspection fees →
Tips
- Payson does not have a separate tenant-improvement permit, application, or fee schedule — the same Commercial Construction Checklist and Building Permit Application cover both new commercial construction and tenant improvements, billed identically under Table 3-A valuation plus 65% plan review. The checklist's 'building (not tenant space)' language only affects the registered-design-professional-stamp threshold, not the permitting process itself.
- Per the Town's Building Division FAQs, commercial projects take longer to review than residential: initial comments are typically delivered within 20 working days (versus 10 working days for single-family/duplex projects) — this is the Town's own published figure and is the only commercial-specific review-timeframe figure the Town publishes; no separate total-approval-time figure (e.g., for subsequent review rounds) was found in the Town's published materials.
- Design Review Approval (a Planning & Zoning step, $150 for new projects or $50 for facade/minor additions per the Fee Schedule) is a prerequisite the Commercial Construction Checklist requires BEFORE plans can be submitted for Building Division review — budget for this as a separate up-front step.
- Commercial projects 4,800 sq. ft. or larger require fire sprinklers under Town Ordinance #912, per the Commercial Construction Checklist — a distinct trigger from the residential 4,800-sq.-ft. IRC sprinkler-installation exemption used elsewhere in this file.
- Multi-family, commercial, or industrial site/civil work carries its own Engineering Division and Planning & Zoning plan-review fees (per-sheet Engineering review, per-acre lot-development fee, and a Commercial/Multi-Family Planning & Zoning plan-review fee) in addition to the Building Division's valuation-based permit fee — budget for all three fee tracks on a ground-up commercial project.
- The Commercial Construction Checklist's code citations (2018 IBC, 2018 IPC, 2018 IMC, 2017 NEC) corroborate — via a second, independent Town document — the codesAdopted note elsewhere in this file that the companion Mechanical/Plumbing code editions are very likely matched to the 2018 IBC/IRC cycle, though the standalone Chapter 150 sections for those codes could not be independently re-verified against the live amlegal.com code library.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Town of Payson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Town of Payson.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Town of Payson
Commercial Building Permit in other cities
Compare commercial building permit fees across Arizona →
Look up this fee in a different city →