Certificate of Occupancy / Change of Use — Clifton, Arizona · Requirements sheet
Reviewed 2026-07-23 · Source: https://cliftonaz.com/code-enforcement%2Fbuilding
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Certificate of Occupancy / Change of Use in Clifton, Arizona
The Town of Clifton has no separate Certificate of Occupancy or Change of Use permit product distinct from this file's general 'building-permit' entry -- confirmed directly from the Town's own combined 'Building Permit/Certificate of Occupancy Application,' whose scope field includes a 'NOT APPLICABLE (application is for certificate of occupancy only)' option, showing a certificate-of-occupancy-only submission is processed on the identical form used for any other building permit, reviewed by the same Building Official/Building Inspector function. A change of occupancy is separately addressed as an adopted-code matter, not a distinct town permit type: Code of Ordinances Section 151.10 adopts the 2009 International Existing Building Code by reference to govern 'repair, alteration, change of occupancy, addition, and relocation of existing buildings including historic buildings' -- so a change-of-use/occupancy project is reviewed under 2009 IEBC provisions as part of the same Building Permit/Certificate of Occupancy Application already documented in this file, not through any separate application, checklist, or fee schedule.
Reviewed 2026-07-23 · Source
When you need this permit
- No standalone change-of-use or certificate-of-occupancy application exists; both are processed on the Town's single 'Building Permit/Certificate of Occupancy Application,' which explicitly supports a certificate-of-occupancy-only submission (marking the permit-scope field 'NOT APPLICABLE')
- A change of occupancy in an existing building is reviewed under the 2009 International Existing Building Code, adopted by reference at Code of Ordinances Section 151.10, governing repair, alteration, change of occupancy, addition, and relocation of existing buildings including historic buildings
- The same sequential review blocks used for any other Clifton building permit apply: Planning and Zoning Administrator (zoning-district/use conformance), Flood Plain Administrator (if applicable), Town Manager (if within the Clifton Townsite Historic District, requiring a prior Certificate of Appropriateness), and Code Enforcement Officer
- Fee is determined the same way as any other Clifton building permit: applicant's own Contractor's Estimate or itemized Cost of Materials plus Estimated Labor Cost total -- no separately published change-of-use or certificate-of-occupancy-specific fee line item exists
- Submitted by emailing codeenforcement@cliftonaz.gov or bringing the completed application to the Code Enforcement Officer at Clifton Town Hall; no online permitting portal is published
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Official / Building Inspector Inspection(s)
Same combined building/plumbing/electrical inspection authority (Section 151.04) used for any other Clifton building permit; no distinct change-of-use inspection sequence is published
See the full Clifton inspection guide — scheduling & re-inspection fees →
Tips
- Clifton does not have a separate Change of Use or Certificate of Occupancy permit -- both are processed through the identical 'Building Permit/Certificate of Occupancy Application' already documented in this file's building-permit entry, which has a built-in option to mark the submission 'certificate of occupancy only.'
- A change of occupancy is governed by the 2009 International Existing Building Code (adopted at Section 151.10), which the Town adopted specifically to cover repair, alteration, change of occupancy, addition, and relocation of existing buildings.
- If the property is in the Clifton Townsite Historic District, a Certificate of Appropriateness is required from the Historic Preservation Commission before any change-of-occupancy-related exterior work or new construction can be approved -- same cross-reference as the building-permit entry.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clifton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Clifton
Certificate of Occupancy / Change of Use in other cities
Compare certificate of occupancy / change of use fees across Arizona →
Look up this fee in a different city →
Now live
Build your Clifton project checklist
Describe your project once and get every permit, document, and fee it triggers in Clifton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.