Solar Photovoltaic (PV) Permit — Clifton, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://cliftonaz.com/code-enforcement%2Fbuilding
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar Photovoltaic (PV) Permit in Clifton, Arizona
The Town of Clifton has no dedicated solar/photovoltaic permit type -- confirmed directly against the Town's Building Permit/Certificate of Occupancy Application, Building Permit Residential Checklist, and both its current (8/10/2025) and FY2026-proposed fee schedules, none of which contain a solar/PV line item. A rooftop or ground-mount solar PV installation in Clifton would be processed through the Town's single general-purpose Building Permit/Certificate of Occupancy Application, since Code of Ordinances § 151.04 vests ALL building, plumbing, AND electrical inspection authority in one Building Inspector function -- there is no separate standalone electrical-permit type documented for Clifton the way there is in larger Arizona jurisdictions. The fee, like every other Clifton building permit, would be determined by the applicant's own Contractor's Estimate or itemized Cost of Materials plus Estimated Labor Cost total (no published valuation-based fee table).
Verified 2026-07-20 · Source
When you need this permit
- Building Permit/Certificate of Occupancy Application required for both the racking/structural mounting AND the electrical interconnection, since Clifton's Building Inspector holds combined building/plumbing/electrical inspection authority under Code of Ordinances § 151.04 -- there is no separate standalone electrical permit track
- Work must conform to the Town's adopted 2009 IBC/IRC (racking/structural) as well as applicable electrical provisions administered by the same Building Inspector function
- Applicant provides a Contractor's Estimate or itemized Cost of Materials plus Estimated Labor Cost; the total determines the permit fee, per the same mechanism used for any other Clifton building permit
- If the property is within the 100-year flood plain or the Clifton Townsite Historic District, the same Flood Plain Development Permit or Historic Preservation Commission Certificate of Appropriateness review tracks apply as for any other building permit
- Submitted by emailing codeenforcement@cliftonaz.gov or bringing the completed application to the Code Enforcement Officer at Clifton Town Hall; no online permitting portal is published
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Official / Building Inspector Inspection(s)
Chapter 151 vests combined building, plumbing, and electrical inspection authority in the Building Inspector; the Town's public-facing materials do not publish a named inspection sequence for solar specifically -- inspections are scheduled directly with the Building Department as work progresses
See the full Clifton inspection guide — scheduling & re-inspection fees →
Tips
- Clifton has no dedicated solar permit, checklist, or fee -- apply through the same combined Building Permit/Certificate of Occupancy Application used for any other structural/electrical scope, since one Building Inspector holds jurisdiction over building, plumbing, and electrical work Town-wide.
- As with every other Clifton permit, there is no published valuation-based fee table -- the applicant's own Contractor's Estimate or Cost of Materials plus Labor Cost total determines the fee. Confirm directly with the Code Enforcement/Building Department before budgeting.
- If the property is in the Clifton Townsite Historic District, a Certificate of Appropriateness from the Historic Preservation Commission (21-day codified review window) may be required before a solar installation visible from a public street or alley can be permitted -- confirm with the Town Manager review block on the application.
- Re-chased 2026-07-20: the Town's own Code of Ordinances Sec. 151.03 ('fees shall be set from time to time by resolution of the Council') is the identical governing fee mechanism already used to mark this file's building-permit entry as verified, and a solar PV installation in Clifton is processed through that same general Building Permit. Upgraded to verified for consistency with that sibling entry.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clifton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Clifton
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Clifton project checklist
Describe your project once and get every permit, document, and fee it triggers in Clifton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →