Commercial Building Permit in Clifton, Arizona

The Town of Clifton has no separate commercial building permit application, checklist, or fee schedule distinct from the general 'building-permit' entry. The Town's Code Enforcement/Building page lists only a general Building Permit Application, a Building Permit Residential Checklist, and a Building Demo Permit Application — no commercial-specific checklist or application. The Business License Info page references the Code Enforcement/Building department but sets out no separate commercial-permit or occupancy-inspection process, and neither the current (8/10/2025) Rates and Fees schedule nor the FY2026-proposed misc-fee schedule contains a commercial-specific line item. Commercial construction — in the Town's Commercial Center (CC-1, CC-2), General Commercial (GC-1), or Industrial (I-1, I-2) zoning districts, per the zoning-district list on the Town's own application form — is reviewed under the same 2009 International Building Code adopted at Code of Ordinances Section 151.01. The IBC governs commercial and non-R-3 occupancies, as distinct from the 2009 International Residential Code (Section 151.09), which is limited to R-3 occupancies, and both run through the identical 'Building Permit/Certificate of Occupancy Application' described in the building-permit entry. Tenant-improvement work is folded into the same process; the Town publishes no separate tenant-improvement permit, application, or fee.

Reviewed 2026-08-03 · Source

When you need this permit

  • Commercial construction, alteration, or occupancy-change is submitted on the Town's single 'Building Permit/Certificate of Occupancy Application' -- the same form used for residential and every other Clifton building-permit type; no separate commercial application or checklist was found
  • Work must conform to the 2009 International Building Code (Code of Ordinances Section 151.01), which governs commercial and other non-R-3 occupancies Town-wide, as distinct from the 2009 International Residential Code (Section 151.09), limited to R-3 (residential) occupancies
  • The Town's published Building Permit Residential Checklist is explicitly a residential-only document (site plan, footing/foundation, floor framing, roof truss calculations for dwellings); no equivalent commercial submittal checklist was located
  • The same sequential review blocks used for any other Clifton building permit apply: Planning and Zoning Administrator review against the Official Zoning Map (commercial work typically falls in the CC-1, CC-2, GC-1, I-1, or I-2 zoning districts), Flood Plain Administrator (if applicable), Town Manager (if within the Clifton Townsite Historic District, requiring a prior Certificate of Appropriateness), and Code Enforcement Officer
  • Tenant-improvement work within an existing commercial building is not a separate permit type -- it is processed through the same general Building Permit/Certificate of Occupancy Application, reviewed under the 2009 International Existing Building Code (Section 151.10) where the work constitutes repair, alteration, or change of occupancy of an existing building
  • If the project is $50,000 or more in value and involves an out-of-state contractor, a certificate of compliance with A.R.S. Section 42-5007 (Department of Revenue bonding certificate) must be obtained prior to permit issuance -- the same requirement documented in the building-permit entry, applying to commercial projects as much as any other
  • Applicant provides a Contractor's Estimate or itemized Cost of Materials plus Estimated Labor Cost; the total determines the permit fee, per the same mechanism used for any other Clifton building permit -- no separately published commercial valuation-based fee table exists
  • Submitted by emailing codeenforcement@cliftonaz.gov or bringing the completed application to the Code Enforcement Officer at Clifton Town Hall; no online permitting portal is published

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee
Confirmed against the Town's Code Enforcement/Building page, current (8/10/2025) Rates and Fees schedule, and FY2026 proposed misc-fee schedule on 2026-07-29 -- none contain a commercial-specific dollar figure. Show full citationConfirmed against the Town's Code Enforcement/Building page, current (8/10/2025) Rates and Fees schedule, and FY2026 proposed misc-fee schedule on 2026-07-29 -- none contain a commercial-specific dollar figure. The same 'total costs will determine permit fee' mechanism documented in the building-permit entry applies equally to commercial work. Confirm the current fee directly with the Code Enforcement/Building Department (928-865-4146 / codeenforcement@cliftonaz.gov).
Determined by total project cost (Contractor's Estimate or itemized Cost of Materials plus Estimated Labor Cost, as entered on the application) -- no separately published valuation-based fee table was located, and no commercial-specific line item exists

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit permit actually take in Clifton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building Official / Building Inspector Inspection(s)

    Chapter 151 vests all building, plumbing, electrical, and other inspection authority in the Building Inspector; the Town's public-facing materials do not publish a named inspection sequence specific to commercial work -- inspections are scheduled directly with the Building Department as work progresses

See the full Clifton inspection guide — scheduling & re-inspection fees →

Tips

  • Clifton has no dedicated commercial building permit application, checklist, or fee -- commercial construction is submitted through the same combined Building Permit/Certificate of Occupancy Application used for residential and every other project type in this record, reviewed under the 2009 IBC rather than the 2009 IRC (which is limited to R-3 residential occupancies).
  • Tenant-improvement work in an existing commercial space is likewise not a separate permit -- it is folded into the general Building Permit process and reviewed under the 2009 International Existing Building Code (Section 151.10) where the work is a repair, alteration, or change of occupancy of an existing building.
  • As with every other Clifton permit type, there is no published valuation-based fee table -- the applicant's own Contractor's Estimate or Cost of Materials plus Labor Cost total determines the fee. Confirm directly with the Code Enforcement/Building Department before budgeting a commercial project.
  • Commercial zoning districts in Clifton include Commercial Center (CC-1, CC-2), General Commercial (GC-1), and Industrial (I-1, I-2) -- confirmed from the zoning-district list on the Town's own Building Permit/Certificate of Occupancy Application.
  • Budget the state's fire-code clock too: because Clifton has adopted no local fire code and is not one of the eight self-permitting cities on DFFM's Plan Review page, DFFM's published policy routes construction of all occupancy types except residential dwellings of fewer than 5 units through Arizona Office of the State Fire Marshal plan review -- currently averaging approximately 45 days (DFFM live page, 2026-08-01), with a 60-day statutory final-determination deadline under A.R.S. Section 37-1383. OSFM submittals are online-only via its Permit and Plan portal -- the same state layer already documented for commercial work in unincorporated Greenlee County.

Frequently asked questions

Clifton requires a commercial building permit for: Commercial construction, alteration, or occupancy-change is submitted on the Town's single 'Building Permit/Certificate of Occupancy Application' -- the same form used for residential and every other Clifton building-permit type; no separate commercial application or checklist was found; Work must conform to the 2009 International Building Code (Code of Ordinances Section 151.01), which governs commercial and other non-R-3 occupancies Town-wide, as distinct from the 2009 International Residential Code (Section 151.09), limited to R-3 (residential) occupancies; The Town's published Building Permit Residential Checklist is explicitly a residential-only document (site plan, footing/foundation, floor framing, roof truss calculations for dwellings); no equivalent commercial submittal checklist was located; The same sequential review blocks used for any other Clifton building permit apply: Planning and Zoning Administrator review against the Official Zoning Map (commercial work typically falls in the CC-1, CC-2, GC-1, I-1, or I-2 zoning districts), Flood Plain Administrator (if applicable), Town Manager (if within the Clifton Townsite Historic District, requiring a prior Certificate of Appropriateness), and Code Enforcement Officer; Tenant-improvement work within an existing commercial building is not a separate permit type -- it is processed through the same general Building Permit/Certificate of Occupancy Application, reviewed under the 2009 International Existing Building Code (Section 151.10) where the work constitutes repair, alteration, or change of occupancy of an existing building; If the project is $50,000 or more in value and involves an out-of-state contractor, a certificate of compliance with A.R.S. Section 42-5007 (Department of Revenue bonding certificate) must be obtained prior to permit issuance -- the same requirement documented in the building-permit entry, applying to commercial projects as much as any other; Applicant provides a Contractor's Estimate or itemized Cost of Materials plus Estimated Labor Cost; the total determines the permit fee, per the same mechanism used for any other Clifton building permit -- no separately published commercial valuation-based fee table exists; Submitted by emailing codeenforcement@cliftonaz.gov or bringing the completed application to the Code Enforcement Officer at Clifton Town Hall; no online permitting portal is published. If your project isn't listed, confirm with Town of Clifton Building Department (Code Enforcement/Building) at 928-865-4146 before starting work.

In Clifton, the published Building Permit Fee is: Determined by total project cost (Contractor's Estimate or itemized Cost of Materials plus Estimated Labor Cost, as entered on the application) -- no separately published valuation-based fee table was located, and no commercial-specific line item exists. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Clifton does not publish a plan-review timeline for this permit. Contact Town of Clifton Building Department (Code Enforcement/Building) at 928-865-4146 for current turnaround.

You'll need: Building Permit/Certificate of Occupancy Application. See the required-documents checklist on this page for details on each.

Clifton requires 1 inspection(s) for a commercial building permit, in order: Building Official / Building Inspector Inspection(s). Schedule each through Town of Clifton Building Department (Code Enforcement/Building) (928-865-4146).

Apply through Town of Clifton Building Department (Code Enforcement/Building) at 510 North Coronado Boulevard, P.O. Box 1415, Clifton, Arizona 85533. Phone: 928-865-4146, email: codeenforcement@cliftonaz.gov. Office hours: Town Hall hours: Monday - Thursday, 7:00 a.m. - 5:00 p.m. (closed Friday - Sunday). Building permit and demolition permit applications are submitted by emailing codeenforcement@cliftonaz.gov or bringing them to the Code Enforcement Officer at Clifton Town Hall; no online permitting portal is published.. Official information: https://cliftonaz.com/code-enforcement%2Fbuilding.

No. The Town of Clifton has no dedicated commercial building permit application, checklist, or fee line distinct from its general Building Permit/Certificate of Occupancy Application. Commercial construction is reviewed under the same 2009 International Building Code (Code of Ordinances Section 151.01) that governs all non-residential occupancies, using the identical application form as residential and every other Clifton permit type.

No. Clifton has no standalone tenant-improvement permit, application, or fee. Tenant-improvement work in an existing commercial building is submitted on the same general Building Permit/Certificate of Occupancy Application and reviewed under the 2009 International Existing Building Code (Section 151.10) for repair, alteration, or change of occupancy of an existing structure.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clifton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Clifton.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.

Clifton's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Clifton yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Clifton lands. Privacy.