Skip to main content
PermitBase

Residential Building Permit (New Construction / Additions) in Fountain Hills, Arizona

Required for new single-family and two-family dwelling construction and building additions in the Town of Fountain Hills. Reviewed against the 2024 IRC and Town of Fountain Hills amendments (Ordinance No. 25-06), effective for submittals on/after September 1, 2025. Applications are submitted exclusively through T.O.P.P.S., the Town's Citizenserve-hosted online permitting portal.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for new single-family/two-family dwelling construction and additions within Town limits
  • Plans must comply with the 2024 IRC and Town of Fountain Hills amendments (Ordinance No. 25-06), including Climatic and Geographic Design Criteria (105 mph wind; Seismic Design Category B; 34°F winter design temperature; 0 psf ground snow load; moderate-to-heavy termite potential)
  • Automatic fire sprinklers are required throughout the entire new dwelling, including garages and carports, per the Town's amended IFC Section 903.2 (Ordinance No. 25-06) — plans must be submitted separately for the fire sprinkler system and noted on the house plans
  • Engineering (lateral analysis for shear, retaining and gravity where required) must be sealed, signed and dated by an architect or engineer registered in the State of Arizona
  • Submittal exclusively via T.O.P.P.S. (Town's Online Permitting and Planning System), a Citizenserve-hosted portal — no paper/walk-in applications accepted
  • Full square-footage summary required (livable, garage, covered patios/porches, storage, mechanical), plus site plan, floor plan, foundation/floor/wall/roof framing details, and an energy-code compliance path (prescriptive, performance, or full RES-Check)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 5 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Single Family Homes & Additions — Livable Area with A/CIncludes Permit and Plan Review. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Building Fees section.
$0.73 per square foot
Single Family Homes & Additions — Covered Area (Garage and/or Patio, non-A/C)Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
$0.55 per square foot
Landscape DepositRequired for Certificate of Occupancy if landscaping is not yet installed; refundable upon Town approval within 6 months. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
$2,500.00 refundable deposit
Single-Family Residential Development Impact FeeSeparate from building permit/plan review fee; split among Parks & Recreation, Fire, and Streets funds. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
$8,816.00 per dwelling
Residential Automatic Sprinkler System Plan Review/InspectionTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027, Fire Fees section — mandatory given the Town's sprinkler-in-all-new-construction amendment.
$340.00 for up to 4,400 sq ft, then $0.08 per sq ft thereafter
Plan Review Add-On (After 3rd Review)Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
50% of Building Permit/Plan Review Fee
Permit Extension — Residential new construction/additionsIf Town has all records and project is within current code cycle. Town of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
$460.00 per extension
Penalty for failure to obtain a building permitTown of Fountain Hills Comprehensive Fee Schedule FY2026-2027.
100% of Building Permit/Plan Review Fee

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Construction / Additions) permit actually take in Fountain Hills?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Stormwater / Limits Fence

    Prior to permit issuance — BMPs, inlets, trackout pad and site limits fence per copy of site plan

  2. 2

    Footing

    Prior to placing concrete — copies of compaction tests required

  3. 3

    Foundation

    Prior to placing concrete or grout — required hold-downs installed, all steel tied, elevation set

  4. 4

    Under-Slab Plumbing/Heating/Electric

    Before fill placement; all piping under test

  5. 5

    Pre-Slab

    Before concrete is placed — pipes sleeved, footings formed

  6. 6

    Roof Diaphragm Nailing / Wall Shear Nailing

    Prior to dry-in — stamped truss calcs and ladder on site; windows installed, flashed, NFRC-labeled

  7. 7

    Rough Framing / Plumbing / Electrical / Mechanical

    Before top-out — gas/DWV/water under test, boxes/panel/service made up, gas appliance venting installed

  8. 8

    Insulation

    Before drywall — per approved plans

  9. 9

    Drywall

    After all insulation approved, before taping

  10. 10

    Final Grade & Site Improvements / Landscaping

    Before building final — site plan on site, landscape plan complete

  11. 11

    Final Building

    Gas/electric meters set, appliances operational, blower door test results provided

See the full Fountain Hills inspection guide — scheduling & re-inspection fees →

Tips

  • T.O.P.P.S. is the ONLY way to submit a building permit application in Fountain Hills — there is no paper or in-person submittal option.
  • Because the Town's Fire Code amendment (Ordinance No. 25-06, Section 903.2) requires automatic sprinklers throughout ALL new occupancies including garages and carports, budget for the separate Residential Automatic Sprinkler System Plan Review/Inspection fee and a separately submitted fire sprinkler plan set.
  • The 2024 IRC/IBC code cycle became effective for Fountain Hills on September 1, 2025 (Ordinance No. 25-06) — plans submitted before that date were reviewed under the prior (2018 I-Codes/2017 NEC) cycle.
  • The Town's published A.R.S. §9-835 review-timeframe policy (Resolution 2013-48) sets a 90/180/270 Town-working-day ceiling for 'Commercial Building Permit' and other commercial/platting categories, but does not list Residential Building Permit — no published Town review-timeframe specific to residential new construction was found; call Building Safety at 480-816-5123 for current timing.

Frequently asked questions

Fountain Hills requires a residential building permit (new construction / additions) for: Building permit required for new single-family/two-family dwelling construction and additions within Town limits; Plans must comply with the 2024 IRC and Town of Fountain Hills amendments (Ordinance No. 25-06), including Climatic and Geographic Design Criteria (105 mph wind; Seismic Design Category B; 34°F winter design temperature; 0 psf ground snow load; moderate-to-heavy termite potential); Automatic fire sprinklers are required throughout the entire new dwelling, including garages and carports, per the Town's amended IFC Section 903.2 (Ordinance No. 25-06) — plans must be submitted separately for the fire sprinkler system and noted on the house plans; Engineering (lateral analysis for shear, retaining and gravity where required) must be sealed, signed and dated by an architect or engineer registered in the State of Arizona; Submittal exclusively via T.O.P.P.S. (Town's Online Permitting and Planning System), a Citizenserve-hosted portal — no paper/walk-in applications accepted; Full square-footage summary required (livable, garage, covered patios/porches, storage, mechanical), plus site plan, floor plan, foundation/floor/wall/roof framing details, and an energy-code compliance path (prescriptive, performance, or full RES-Check). If your project isn't listed, confirm with Town of Fountain Hills Building Safety Division (Planning and Zoning / Development Services Department) at 480-816-5123 before starting work.

In Fountain Hills, the published Single Family Homes & Additions — Livable Area with A/C is: $0.73 per square foot. Additional published fees: Single Family Homes & Additions — Covered Area (Garage and/or Patio, non-A/C) — $0.55 per square foot; Landscape Deposit — $2,500.00 refundable deposit; Single-Family Residential Development Impact Fee — $8,816.00 per dwelling; Residential Automatic Sprinkler System Plan Review/Inspection — $340.00 for up to 4,400 sq ft, then $0.08 per sq ft thereafter; Plan Review Add-On (After 3rd Review) — 50% of Building Permit/Plan Review Fee; Permit Extension — Residential new construction/additions — $460.00 per extension; Penalty for failure to obtain a building permit — 100% of Building Permit/Plan Review Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Not published by the Town. The Town's A.R.S. §9-835 compliance policy (Resolution 2013-48) sets a 90/180/270 Town-working-day ceiling for Commercial Building Permit and similar commercial/platting categories, but does not cover residential new construction. Call Building Safety at 480-816-5123 for current review timing.

You'll need: Town of Fountain Hills One and Two Family Residential 2024 IRC Plan Submittal Checklist; T.O.P.P.S. Application; Site/Plot Plan; Construction Drawings and Structural Calculations; Fire Sprinkler Plans. See the required-documents checklist on this page for details on each.

Fountain Hills requires 11 inspection(s) for a residential building permit (new construction / additions), in order: Stormwater / Limits Fence, Footing, Foundation, Under-Slab Plumbing/Heating/Electric, Pre-Slab, Roof Diaphragm Nailing / Wall Shear Nailing, Rough Framing / Plumbing / Electrical / Mechanical, Insulation, Drywall, Final Grade & Site Improvements / Landscaping, Final Building. Schedule each through Town of Fountain Hills Building Safety Division (Planning and Zoning / Development Services Department) (480-816-5123).

Apply through Town of Fountain Hills Building Safety Division (Planning and Zoning / Development Services Department) at Town Hall, 16705 E. Avenue of the Fountains, Fountain Hills, AZ 85268. Phone: 480-816-5123, email: pjohnson@fountainhillsaz.gov. Office hours: Building Safety office hours for plan review, phone calls, front counter assistance and building code questions: Monday - Thursday, 7 a.m. - 6 p.m. Inspections are conducted 7 a.m. - 4 p.m. Monday through Friday. The Town of Fountain Hills only accepts permit applications online through T.O.P.P.S. (Town's Online Permitting and Planning System), a Citizenserve-hosted portal; there is no walk-in/paper submittal option. Source: Town of Fountain Hills Building Safety page (fountainhillsaz.gov/204/Building-Safety) and Building Permit Forms & Checklists page (fountainhillsaz.gov/502/Building-Permit-Forms-Checklists).. Official information: https://www.fountainhillsaz.gov/204/Building-Safety.

Exclusively online through T.O.P.P.S. (Town's Online Permitting and Planning System), a Citizenserve-hosted portal. There is no walk-in or paper submittal path; create an account, then file the application and required plan set through the portal.

Yes. Per the Town's amended Fire Code (Ordinance No. 25-06, Section 903.2), automatic fire sprinklers are required throughout all new occupancies, including garages and carports, with narrow exceptions for small detached accessory structures. This is a stricter local amendment than the base International Fire Code.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fountain Hills building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Property Access

Fountain Hills's permit history is searchable by address

4,232 permits on record for Fountain Hills, 2021–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free