EV Charger / EVSE Permit — Fountain Hills, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://www.fountainhillsaz.gov/204/Building-Safety
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Fountain Hills, Arizona
Required for installation of a residential or commercial electric vehicle charging station (EVSE) in the Town of Fountain Hills, governed by the 2023 National Electrical Code (NEC) as adopted and amended by the Town (Ordinance No. 25-06). The Town's Comprehensive Fee Schedule has no distinct EV-charger/EVSE fee line item — a standalone EVSE circuit is billed under the same 'One Discipline Permit' minor-electrical category used for other standalone electrical work (see this jurisdiction's electrical-permit entry). Note the Town's fee schedule does list a separate, unrelated 'Electric Vehicle Charging — Charging Station Fee' of $4.00/hour (2-hour maximum) under Public Works, but that is a usage/parking fee for a Town-owned public charging station, not a building-permit fee for installing a charger.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for EVSE/charging equipment installation as standalone electrical work not part of a larger building permit
- Governed by the 2023 NEC as adopted by the Town of Fountain Hills
- One-Discipline Permit classification applies to standalone electrical work such as an EVSE circuit; larger scope bundled with new construction or a remodel is billed under that permit type instead
- Apply via T.O.P.P.S. online portal only — the Town accepts no walk-in/paper submittal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover, per the Town's standard electrical rough-in inspection practice
- 2
Final Electrical
EVSE unit connections, breaker/disconnect, and grounding verified before energizing
See the full Fountain Hills inspection guide — scheduling & re-inspection fees →
Tips
- Fountain Hills has no distinct EV charger permit fee — a standalone EVSE circuit is billed under the Town's general $140 'One Discipline Permit' minor-electrical category, the same fee that applies to other standalone electrical work like a panel repair.
- Don't confuse the Town's $4.00/hour 'Electric Vehicle Charging — Charging Station Fee' (Public Works section of the fee schedule) with a permit fee — that line item is a usage fee for parking at a Town-owned public EV charging station, unrelated to permitting a private EVSE installation.
- If your EVSE installation requires a panel or service upgrade to support the added load, confirm with Building Safety (480-816-5123) whether that additional scope changes the permit fee or review path.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fountain Hills building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Fountain Hills
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Fountain Hills project checklist
Describe your project once and get every permit, document, and fee it triggers in Fountain Hills — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →