Lafayette building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Lafayette, Colorado.

Verified 2026-07-05 · Source

How to schedule

Inspections are requested through the building department below.

Address
1290 S. Public Road, Lafayette, CO 80026
Phone
303-661-1451
Office hours
City Hall public access hours Monday-Friday, 8am-5pm; Building staff available via phone/email during regular business hours. Main city line (303) 665-5588; Building Division direct line (303) 661-1451; Planning staff (303) 661-1270.

Inspection sequence

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation

    Before concrete pour, per 36-inch minimum frost depth (if new construction)

  2. 2

    Rough Frame

    Framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation (if new footings)

    Before concrete pour, per 36-inch minimum frost depth

  2. 2

    Rough Frame

    Framing complete, connection to existing structure verified

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans

Applies to: Residential Building Permit (New Single-Family / Two-Family / Multi-Family / Townhome)

  1. 1

    Foundation/Footing

    Before concrete pour, per 36-inch minimum frost depth

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete; required for issuance of a Certificate of Occupancy (issued for new single-family homes, two-family homes [one CO per unit], townhomes [one CO per unit], and multi-family buildings [one CO per building])

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough Electrical

    Wiring and panel/breaker installed before concealment

  2. 2

    Final Inspection

    EVSE circuit, breaker/disconnect, and NEC Article 625 compliance verified; devices installed and system energized

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Re-inspection fees

Electrical PermitElectrical Reinspection Fee
$75.00 per inspection
Roofing Permit (Reroof)Reinspection Fee · Applies if a roof inspection is cancelled/failed for non-compliance with ladder, weather, or access requirements
$75.00
EV Charger / EVSE PermitElectrical Reinspection Fee · Exhibit A Fee Schedule, effective 1-1-26
$75.00 per inspection

Sources & verification

Verified against official sources. Last reviewed 2026-07-05.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lafayette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Lafayette building permits

Get alerts for Lafayette

We'll email you when Lafayette's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.