Residential Addition / Remodel Permit — Lafayette, Colorado · Requirements sheet
Verified 2026-07-05 · Source: https://www.lafayetteco.gov/362/Apply-for-Building-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Addition / Remodel Permit in Lafayette, Colorado
Covers small residential permits on existing structures/lots (basements, structural and non-structural remodels, decks, patio covers/pergolas, accessory structures, mobile home sets, residential additions under 750 sq ft, gas fireplace/firepit, swimming pools) as well as larger residential additions of 750 sq ft or more, which follow the longer new-construction-style review track. Reviewed under the 2021 IRC as adopted by the 2023 Lafayette Colorado Building Code.
Verified 2026-07-05 · Source
When you need this permit
- Small Residential Permits category (existing structures/lots) covers: Basements; Structural and Non-structural Remodels; Decks; Patio Covers/Pergolas; Accessory Structures (detached garages, storage sheds 120 sq ft or more, carports); Mobile Home Sets (including construction trailers); Residential Additions under 750 sq ft; Gas Fireplace/Firepit; Swimming Pools
- Residential Additions of 750 sq ft or larger are classified with New Single-Family/Two-Family/Multi-Family/ADU permits under the longer 8-12 week first-comments review track, not the 2-3 week Small Residential track
- Plan size cap: Residential Remodel Plans no larger than 11 x 17 inches for electronic review
- Projects in the Old Town Neighborhood Overlay District must additionally meet the Old Town Neighborhood Additional Requirements, Overlay District Regulations, and Dimensional Standards
- Retaining walls under 3 feet in height and one-story storage sheds under 120 sq ft do not require a permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (if new footings)
Before concrete pour, per 36-inch minimum frost depth
- 2
Rough Frame
Framing complete, connection to existing structure verified
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans
See the full Lafayette inspection guide — scheduling & re-inspection fees →
Tips
- A residential addition under 750 sq ft follows the faster 2-3 week Small Residential track, while 750 sq ft or larger triggers the much longer 8-12 week new-construction-style review — worth designing around that threshold if timeline matters.
- Basement remodels, structural and non-structural, both require a permit in Lafayette and use their own dedicated checklist.
- Old Town Lafayette projects (additions, garages, ADUs, accessory structures) carry extra overlay-district requirements beyond the base building code — check the Old Town Neighborhood Overlay materials before finalizing scope.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-05.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lafayette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lafayette
Residential Addition / Remodel Permit in other cities
Compare residential addition / remodel permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Lafayette project checklist
Describe your project once and get every permit, document, and fee it triggers in Lafayette — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →