Salida building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Salida, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
City of Salida Community Development Department: The Touber Building, 448 E. First Street, Suite 112, Salida, CO 81201. Chaffee County Building Safety Department: 104 Crestone Ave., Room 125 (2nd Floor), Salida, CO 81201 (mailing: P.O. Box 699, Salida, CO 81201)
Phone
City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208
Office hours
City of Salida Community Development: Monday-Thursday, 8:00 a.m.-5:00 p.m. (per the City's own Contact Information block on the Building Permit Review page). Chaffee County Building Safety Department: operates on a 4-day work week (Monday-Thursday), inspections performed Monday-Thursday excluding federal holidays; inspection requests must arrive by 4:00 p.m. the business day before the desired inspection date (Friday afternoon requests roll to Tuesday).

Inspection sequence

Applies to: Residential Building Permit (New Construction, Single-Family, ADU, Additions)

  1. 1

    Foundation / Footing

    Performed by Chaffee County Building Safety Department before concrete pour

  2. 2

    Framing

    Performed by Chaffee County; engineered truss design documentation must be available on-site even though not required at application

  3. 3

    MEP Rough-In

    Mechanical, electrical, and plumbing rough-in before walls closed; each trade requires its own separate permit

  4. 4

    Final Inspection (County) + Municipal Sign-Off (City of Salida)

    Both a County final inspection and City of Salida municipal sign-off are required before a Certificate of Occupancy is issued, per the County's own Residential Building Application

Applies to: Accessory Dwelling Unit (ADU) Building Permit

  1. 1

    Foundation / Framing

    Performed by Chaffee County, same sequence as new construction

  2. 2

    MEP Rough-In

    Each trade requires its own permit

  3. 3

    Final Inspection (County) + Municipal Sign-Off (City)

    Both required before Certificate of Occupancy

Applies to: Electrical Permit

  1. 1

    Service Underground System

    Per the County's own required-inspections list on the Electrical Permit Application

  2. 2

    Rough-In

    Prior to insulation and drywall

  3. 3

    Final

    Prior to occupancy

Applies to: Plumbing Permit

  1. 1

    Underground / Under-slab

    Before concrete pour

  2. 2

    Rough-In

    Before walls closed

  3. 3

    Final

    Fixtures connected, no leaks, proper venting

Applies to: Residential Addition / Remodel Building Permit

  1. 1

    Foundation (if new footings)

    Performed by Chaffee County

  2. 2

    Framing / Rough Trades

    Framing and MEP rough-in before concealment

  3. 3

    Final Inspection (County) + Municipal Sign-Off (City)

    Both required before Certificate of Occupancy

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Service Underground System

    Per Chaffee County's required-inspections list

  2. 2

    Rough-In

    Prior to insulation and drywall; roof-mount racking/attachment verified before module installation

  3. 3

    Final

    Prior to occupancy/energizing the system

Applies to: Demolition / Abatement Permit

  1. 1

    Utility Disconnection Verification

    Utilities must be inspected prior to covering/capping; each utility provider signs off on the permit form

  2. 2

    Final

    Confirms structure removed and all utilities safely disconnected

Applies to: EV Charger / EVSE Permit (Chaffee County Electrical Permit)

  1. 1

    Rough-In

    Circuit wiring, breaker, and conduit before any wall/finish closure, if applicable

  2. 2

    Final

    Charger mounted, connections verified, GFCI/breaker protection confirmed prior to energizing

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In / Equipment

    Equipment installation and ductwork before walls closed

  2. 2

    Final

    Equipment operational, combustion air and venting verified

Applies to: Roofing Permit

  1. 1

    Mid-Roof / In-Progress

    Required for all re-roof permits; verifies ice/water barrier, underlayment, drip edge, and flashing installation before shingles are installed past the ice/water barrier

  2. 2

    Final

    Confirms completed roof assembly per approved plans and manufacturer instructions

Re-inspection fees

Electrical PermitRe-inspection Fee
$100.00
EV Charger / EVSE Permit (Chaffee County Electrical Permit)Re-inspection Fee
$100.00
Plumbing PermitRe-inspection Fee
$100.00
Mechanical / HVAC PermitRe-inspection Fee
$50.00

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salida building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Salida building permits

Get alerts for Salida

We'll email you when Salida's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.