EV Charger / EVSE Permit (Chaffee County Electrical Permit) in Salida, Colorado
Required for installation of an electric vehicle charging station (Level 2 or DC fast charger) in Salida. Like all electrical work citywide, EV charger permits are issued and inspected by the Chaffee County Building Safety Department, not the City, under CRS 12-23-117 and Chaffee County Ordinance 2018-1. The County's Electrical Permit Application/fee schedule has no distinct EV-charger line item (only 'Residential wiring' by square footage, a general 'all other installations' valuation tier, and a separate capped Solar panel tier) — an EV charger circuit is billed under the general 'all other installations' valuation-based tier, the same category used for any non-living-area electrical work such as a new dedicated 240V circuit.
Verified 2026-07-20 · Source
When you need this permit
- Confirm with City of Salida Community Development (planning@cityofsalida.com) whether a standalone EV charger installation needs a City zoning sign-off first, or whether it can go directly to the County as a standalone trade permit — per this file's electrical-permit entry, a City sign-off is only required when the electrical work is part of a broader project that itself triggers City review (new construction, addition, solar)
- Submit the Chaffee County Electrical Permit Application; a dedicated EV charger circuit (typically a new 240V circuit) is computed from total installation cost under the 'all other installations' valuation tier, since no separate EV-charger fee line exists
- Colorado's homeowner clause allows an owner-occupant to self-perform electrical work, including an EV charger circuit, on their sole residence if not for sale/resale/rental Owner-builder
- Colorado's HB24-1173 (EV Charging System Permits, C.R.S. § 31-23-316) requires counties with population over 20,000 to adopt, by December 31, 2025, either the Colorado Energy Office's EV Charger Permitting Model Code, their own objective standards/administrative review process, or a formal ordinance continuing their existing process — Chaffee County's population is right at this threshold (reported as approximately 19,500-20,400 depending on source/year), and no specific Chaffee County ordinance response to HB24-1173 could be confirmed as of this review; applicants should confirm current compliance status directly with the County Building Department
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Circuit wiring, breaker, and conduit before any wall/finish closure, if applicable
- 2
Final
Charger mounted, connections verified, GFCI/breaker protection confirmed prior to energizing
See the full Salida inspection guide — scheduling & re-inspection fees →
Tips
- If a permit is not filed in advance of the installation's commencement, the inspection fee is DOUBLED per CRS 12-23-117(3), per the County's own application — get the permit before the electrician starts work.
- Chaffee County has no dedicated EV-charger fee line; a Level 2 charger circuit is billed under the same 'all other installations' valuation tier as any other non-living-area electrical work (the same tier used for a shop, garage, or well-pump circuit).
- Chaffee County's population is close to HB24-1173's 20,000-person county threshold for mandatory streamlined EV-charger permitting (population figures found range roughly 19,500-20,400 depending on source); confirm directly with the County Building Department whether a model-code or expedited process now applies.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salida building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Salida
EV Charger / EVSE Permit (Chaffee County Electrical Permit) in other cities
Compare ev charger / evse permit (chaffee county electrical permit) fees across Colorado →
Look up this fee in a different city →