EV Charger / EVSE Permit (Chaffee County Electrical Permit) in Salida, Colorado

Required for installation of an electric vehicle charging station (Level 2 or DC fast charger) in Salida. Like all electrical work citywide, EV charger permits are issued and inspected by the Chaffee County Building Safety Department, not the City, under CRS 12-23-117 and Chaffee County Ordinance 2018-1. The County's Electrical Permit Application/fee schedule has no distinct EV-charger line item (only 'Residential wiring' by square footage, a general 'all other installations' valuation tier, and a separate capped Solar panel tier) — an EV charger circuit is billed under the general 'all other installations' valuation-based tier, the same category used for any non-living-area electrical work such as a new dedicated 240V circuit.

Verified 2026-07-20 · Source

When you need this permit

  • Confirm with City of Salida Community Development (planning@cityofsalida.com) whether a standalone EV charger installation needs a City zoning sign-off first, or whether it can go directly to the County as a standalone trade permit — per this file's electrical-permit entry, a City sign-off is only required when the electrical work is part of a broader project that itself triggers City review (new construction, addition, solar)
  • Submit the Chaffee County Electrical Permit Application; a dedicated EV charger circuit (typically a new 240V circuit) is computed from total installation cost under the 'all other installations' valuation tier, since no separate EV-charger fee line exists
  • Colorado's homeowner clause allows an owner-occupant to self-perform electrical work, including an EV charger circuit, on their sole residence if not for sale/resale/rental Owner-builder
  • Colorado's HB24-1173 (EV Charging System Permits, C.R.S. § 31-23-316) requires counties with population over 20,000 to adopt, by December 31, 2025, either the Colorado Energy Office's EV Charger Permitting Model Code, their own objective standards/administrative review process, or a formal ordinance continuing their existing process — Chaffee County's population is right at this threshold (reported as approximately 19,500-20,400 depending on source/year), and no specific Chaffee County ordinance response to HB24-1173 could be confirmed as of this review; applicants should confirm current compliance status directly with the County Building Department

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

All other installations (non-living-area residential, commercial/industrial) — valuation up to $2,000.00Chaffee County Electrical Permit Application fee schedule — applies to an EV charger circuit since no dedicated EV-charger fee line exists; most single Level 2 residential charger circuit installations (equipment + labor) fall in or near this tier
$135.00
All other installations — valuation $2,001.00 and aboveApplies if the EV charger installation cost (including any panel upgrade) exceeds $2,000.00
$135.00 + $13.50 per $1,000 (or fraction thereof)
Re-inspection Fee
$100.00
Partial Inspection Fee or Extra Inspection Fee
$100.00

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit (Chaffee County Electrical Permit) permit actually take in Salida?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Circuit wiring, breaker, and conduit before any wall/finish closure, if applicable

  2. 2

    Final

    Charger mounted, connections verified, GFCI/breaker protection confirmed prior to energizing

See the full Salida inspection guide — scheduling & re-inspection fees →

Tips

  • If a permit is not filed in advance of the installation's commencement, the inspection fee is DOUBLED per CRS 12-23-117(3), per the County's own application — get the permit before the electrician starts work.
  • Chaffee County has no dedicated EV-charger fee line; a Level 2 charger circuit is billed under the same 'all other installations' valuation tier as any other non-living-area electrical work (the same tier used for a shop, garage, or well-pump circuit).
  • Chaffee County's population is close to HB24-1173's 20,000-person county threshold for mandatory streamlined EV-charger permitting (population figures found range roughly 19,500-20,400 depending on source); confirm directly with the County Building Department whether a model-code or expedited process now applies.

Frequently asked questions

Salida requires an ev charger / evse permit (chaffee county electrical permit) for: Confirm with City of Salida Community Development (planning@cityofsalida.com) whether a standalone EV charger installation needs a City zoning sign-off first, or whether it can go directly to the County as a standalone trade permit — per this file's electrical-permit entry, a City sign-off is only required when the electrical work is part of a broader project that itself triggers City review (new construction, addition, solar); Submit the Chaffee County Electrical Permit Application; a dedicated EV charger circuit (typically a new 240V circuit) is computed from total installation cost under the 'all other installations' valuation tier, since no separate EV-charger fee line exists; Colorado's homeowner clause allows an owner-occupant to self-perform electrical work, including an EV charger circuit, on their sole residence if not for sale/resale/rental; Colorado's HB24-1173 (EV Charging System Permits, C.R.S. § 31-23-316) requires counties with population over 20,000 to adopt, by December 31, 2025, either the Colorado Energy Office's EV Charger Permitting Model Code, their own objective standards/administrative review process, or a formal ordinance continuing their existing process — Chaffee County's population is right at this threshold (reported as approximately 19,500-20,400 depending on source/year), and no specific Chaffee County ordinance response to HB24-1173 could be confirmed as of this review; applicants should confirm current compliance status directly with the County Building Department. If your project isn't listed, confirm with Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) at City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208 before starting work.

No distinct EV-charger fee line exists in the County's Electrical Permit fee schedule. It is billed under the general 'all other installations' valuation-based tier: $135.00 for installations valued up to $2,000, or $135.00 plus $13.50 per additional $1,000 above that.

Salida does not publish a plan-review timeline for this permit. Contact Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) at City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208 for current turnaround.

You'll need: Chaffee County Electrical Permit Application. See the required-documents checklist on this page for details on each.

Salida requires 2 inspection(s) for an ev charger / evse permit (chaffee county electrical permit), in order: Rough-In, Final. Schedule each through Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) (City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208).

Apply through Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) at City of Salida Community Development Department: The Touber Building, 448 E. First Street, Suite 112, Salida, CO 81201. Chaffee County Building Safety Department: 104 Crestone Ave., Room 125 (2nd Floor), Salida, CO 81201 (mailing: P.O. Box 699, Salida, CO 81201). Phone: City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208, email: City of Salida (zoning/land use/building permit inquiries): planning@cityofsalida.com; Commercial Permit Inquiries/Major Impact Review: kristen.hodges@cityofsalida.com. Chaffee County Building Safety Department: bdepartment@chaffeecounty.org (electronic plan submittals: eplans@chaffeecounty.org). Office hours: City of Salida Community Development: Monday-Thursday, 8:00 a.m.-5:00 p.m. (per the City's own Contact Information block on the Building Permit Review page). Chaffee County Building Safety Department: operates on a 4-day work week (Monday-Thursday), inspections performed Monday-Thursday excluding federal holidays; inspection requests must arrive by 4:00 p.m. the business day before the desired inspection date (Friday afternoon requests roll to Tuesday).. Official information: https://www.cityofsalida.com/commdev/page/building-permit-review and https://www.chaffeecounty.org/departments/building_department/index.php.

Salida, Colorado has adopted: 2021 International Building Code (IBC) — adopted by the City of Salida per the City's own Building Permit Review page: 'The City adopted the 2021 International Codes for Building, Residential, Existing Buildings, Plumbing, Mechanical, Energy Conservation, Fuel Gas and Property Maintenance with the 2021 IECC and the 2021 National Electric Code.' Chaffee County Building Safety Department's own Adopted Codes & Design Criteria page independently confirms the same 2021 I-Code suite (IBC, IRC, IFC, IPC, IMC, IFGC, IECC, IEBC) is the edition actually enforced county-wide, including for Salida.; 2021 International Residential Code (IRC) — same dual-source confirmation as above; 2021 International Existing Building Code (IEBC); 2021 International Plumbing Code (IPC); 2021 International Mechanical Code (IMC); 2021 International Fuel Gas Code (IFGC); 2021 International Energy Conservation Code (IECC) — Chaffee County's Residential Building Application requires an IECC Compliance Path Certificate, Manual J/S/D submittal, and blower-door/duct/ventilation testing by a RESNET- or BPI-certified tester; 2021 International Property Maintenance Code — named on the City's own adopted-codes list; 2023 National Electrical Code (NFPA 70 / NEC) — City of Salida's own page states '2021 IECC and the 2021 National Electric Code,' but Chaffee County Building Safety Department's Adopted Codes & Design Criteria page (the agency that actually issues and enforces electrical permits) lists the 2023 NEC as currently adopted; this is a genuine, honestly-flagged discrepancy between the City's own page text and the County's live enforced edition — applicants should confirm the currently enforced NEC edition directly with Chaffee County Building Safety Department at time of submittal; 2017 ICC A117.1 Accessible and Usable Buildings and Facilities — Chaffee County Adopted Codes & Design Criteria page; Colorado Wildfire Resiliency Code (effective July 1, 2026) and 2021 International Wildland-Urban Interface Code (IWUIC) — Chaffee County Adopted Codes & Design Criteria page; note several IWUIC-specific submittal requirements on the County's own Residential Building Application are explicitly scoped to 'Unincorporated Chaffee County Only,' meaning some (not all) IWUIC provisions may not directly apply within Salida city limits — confirm scope with the County Building Department for any given IWUIC provision; Colorado Model Electric Ready & Solar Ready Code — Chaffee County Adopted Codes & Design Criteria page; the County's Residential Building Application requires roof load design for future solar panels and a solar-ready zone/interconnection pathway on submitted plans; Salida Municipal Code Chapter 16, Land Use and Development — governs zoning compliance, setbacks, dimensional standards, landscaping, and parking; reviewed by the City of Salida Community Development Department as the mandatory first step before any County building-permit review begins. Local amendments apply — see the Salida overview page for the full list.

No. Like all electrical permits, EV charger permits for any property in Salida are issued by the Chaffee County Building Safety Department, not the City. A City zoning/fire sign-off may be required first only if the EV charger work is part of a larger project that independently triggers City review.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salida building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.