Demolition / Abatement Permit in Salida, Colorado

Required for demolition or removal of a structure in Salida. Issued by the Chaffee County Building Safety Department, but REQUIRES a City of Salida zoning sign-off first, per the County's own application form, which explicitly lists 'Salida' among the municipalities requiring zoning sign-off.

Verified 2026-07-06 · Source

When you need this permit

  • Zoning Sign-off from the City of Salida is REQUIRED before the County will approve the demolition permit — the County's own Demolition/Abatement Permit Application has an explicit 'Zoning Approval: County / Buena Vista / Poncha Springs / Salida' sign-off block
  • Copy of asbestos inspection report, State-issued Demolition Permit, and State-issued Asbestos Abatement Permit if applicable
  • Approval of the appropriate Historical Society required if applicable (relevant to Salida's Historic District)
  • Scaled site plan showing the structure(s) to be demolished, distances from property lines/other structures/utilities/driveway/water features/easements
  • Written list of all hazardous materials on the property and disposal method; materials must be removed within 14 days of the demolition date
  • Utility providers must be notified and utility connections discontinued/capped per their rules (capped 5 feet from the property line if abandoned); utilities must be inspected PRIOR to covering
  • Proof of the approved County Demolition Permit, State permit, and asbestos results, plus a list of removed materials, is required at the Chaffee County Landfill

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition/Abatement Permit FeeChaffee County Demolition/Abatement Permit Application header states the fee directly: 'DEMOLITION/ABATEMENT PERMIT APPLICATION- $50.00'
$50.00
City of Salida Demolition Permit fee (when Public Works sign-off is required)City of Salida 2026 Fees and Charges for Community Development Services schedule, effective 03/17/26 — a separate City-side fee layered on top of the County's $50.00 fee when Public Works sign-off applies
Commercial & Multi-Family $50; Residential $25

Review timeline

Plan review
Not published — contact the department

How long did your Demolition / Abatement Permit permit actually take in Salida?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Utility Disconnection Verification

    Utilities must be inspected prior to covering/capping; each utility provider signs off on the permit form

  2. 2

    Final

    Confirms structure removed and all utilities safely disconnected

See the full Salida inspection guide — scheduling & re-inspection fees →

Tips

  • This is the clearest documented instance of the Salida two-step model on a single form: the County's own Demolition/Abatement Permit Application will not be approved for a Salida property without a completed 'Zoning Approval: Salida' signature block.
  • Materials resulting from the demolition must be removed from the property within 14 days of the demolition date — plan disposal logistics (including required Landfill paperwork) before the demolition date, not after.

Frequently asked questions

Salida requires a demolition / abatement permit for: Zoning Sign-off from the City of Salida is REQUIRED before the County will approve the demolition permit — the County's own Demolition/Abatement Permit Application has an explicit 'Zoning Approval: County / Buena Vista / Poncha Springs / Salida' sign-off block; Copy of asbestos inspection report, State-issued Demolition Permit, and State-issued Asbestos Abatement Permit if applicable; Approval of the appropriate Historical Society required if applicable (relevant to Salida's Historic District); Scaled site plan showing the structure(s) to be demolished, distances from property lines/other structures/utilities/driveway/water features/easements; Written list of all hazardous materials on the property and disposal method; materials must be removed within 14 days of the demolition date; Utility providers must be notified and utility connections discontinued/capped per their rules (capped 5 feet from the property line if abandoned); utilities must be inspected PRIOR to covering; Proof of the approved County Demolition Permit, State permit, and asbestos results, plus a list of removed materials, is required at the Chaffee County Landfill. If your project isn't listed, confirm with Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) at City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208 before starting work.

In Salida, the published Demolition/Abatement Permit Fee is: $50.00. Additional published fees: City of Salida Demolition Permit fee (when Public Works sign-off is required) — Commercial & Multi-Family $50; Residential $25. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Salida does not publish a plan-review timeline for this permit. Contact Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) at City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208 for current turnaround.

You'll need: Chaffee County Demolition/Abatement Permit Application. Depending on your project, Salida may also ask for: Asbestos Inspection Report / State Demolition and Abatement Permits. See the required-documents checklist on this page for details on each.

Salida requires 2 inspection(s) for a demolition / abatement permit, in order: Utility Disconnection Verification, Final. Schedule each through Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) (City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208).

Apply through Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) at City of Salida Community Development Department: The Touber Building, 448 E. First Street, Suite 112, Salida, CO 81201. Chaffee County Building Safety Department: 104 Crestone Ave., Room 125 (2nd Floor), Salida, CO 81201 (mailing: P.O. Box 699, Salida, CO 81201). Phone: City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208, email: City of Salida (zoning/land use/building permit inquiries): planning@cityofsalida.com; Commercial Permit Inquiries/Major Impact Review: kristen.hodges@cityofsalida.com. Chaffee County Building Safety Department: bdepartment@chaffeecounty.org (electronic plan submittals: eplans@chaffeecounty.org). Office hours: City of Salida Community Development: Monday-Thursday, 8:00 a.m.-5:00 p.m. (per the City's own Contact Information block on the Building Permit Review page). Chaffee County Building Safety Department: operates on a 4-day work week (Monday-Thursday), inspections performed Monday-Thursday excluding federal holidays; inspection requests must arrive by 4:00 p.m. the business day before the desired inspection date (Friday afternoon requests roll to Tuesday).. Official information: https://www.cityofsalida.com/commdev/page/building-permit-review and https://www.chaffeecounty.org/departments/building_department/index.php.

Salida, Colorado has adopted: 2021 International Building Code (IBC) — adopted by the City of Salida per the City's own Building Permit Review page: 'The City adopted the 2021 International Codes for Building, Residential, Existing Buildings, Plumbing, Mechanical, Energy Conservation, Fuel Gas and Property Maintenance with the 2021 IECC and the 2021 National Electric Code.' Chaffee County Building Safety Department's own Adopted Codes & Design Criteria page independently confirms the same 2021 I-Code suite (IBC, IRC, IFC, IPC, IMC, IFGC, IECC, IEBC) is the edition actually enforced county-wide, including for Salida.; 2021 International Residential Code (IRC) — same dual-source confirmation as above; 2021 International Existing Building Code (IEBC); 2021 International Plumbing Code (IPC); 2021 International Mechanical Code (IMC); 2021 International Fuel Gas Code (IFGC); 2021 International Energy Conservation Code (IECC) — Chaffee County's Residential Building Application requires an IECC Compliance Path Certificate, Manual J/S/D submittal, and blower-door/duct/ventilation testing by a RESNET- or BPI-certified tester; 2021 International Property Maintenance Code — named on the City's own adopted-codes list; 2023 National Electrical Code (NFPA 70 / NEC) — City of Salida's own page states '2021 IECC and the 2021 National Electric Code,' but Chaffee County Building Safety Department's Adopted Codes & Design Criteria page (the agency that actually issues and enforces electrical permits) lists the 2023 NEC as currently adopted; this is a genuine, honestly-flagged discrepancy between the City's own page text and the County's live enforced edition — applicants should confirm the currently enforced NEC edition directly with Chaffee County Building Safety Department at time of submittal; 2017 ICC A117.1 Accessible and Usable Buildings and Facilities — Chaffee County Adopted Codes & Design Criteria page; Colorado Wildfire Resiliency Code (effective July 1, 2026) and 2021 International Wildland-Urban Interface Code (IWUIC) — Chaffee County Adopted Codes & Design Criteria page; note several IWUIC-specific submittal requirements on the County's own Residential Building Application are explicitly scoped to 'Unincorporated Chaffee County Only,' meaning some (not all) IWUIC provisions may not directly apply within Salida city limits — confirm scope with the County Building Department for any given IWUIC provision; Colorado Model Electric Ready & Solar Ready Code — Chaffee County Adopted Codes & Design Criteria page; the County's Residential Building Application requires roof load design for future solar panels and a solar-ready zone/interconnection pathway on submitted plans; Salida Municipal Code Chapter 16, Land Use and Development — governs zoning compliance, setbacks, dimensional standards, landscaping, and parking; reviewed by the City of Salida Community Development Department as the mandatory first step before any County building-permit review begins. Local amendments apply — see the Salida overview page for the full list.

No. The County's own Demolition/Abatement Permit Application requires a Zoning Approval sign-off that explicitly lists Salida as one of the municipalities needing this sign-off before the County permit will be approved.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salida building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.