Plumbing Permit in Salida, Colorado

Required for installation of plumbing fixtures, fuel gas piping, and related work in Salida. Issued and inspected by the Chaffee County Building Safety Department under the 2021 International Plumbing Code (IPC) and International Fuel Gas Code (IFGC).

Verified 2026-07-06 · Source

When you need this permit

  • Submit the Chaffee County Plumbing Permit Application; residential fixture fees are per-fixture, commercial work is valuation-based
  • Colorado's homeowner clause allows an owner-occupant to self-perform plumbing work on their sole residence if not for sale/resale/rental Owner-builder

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential — per plumbing fixture (tub, shower, toilet, sink, bidet, clothes washer, dishwasher)Chaffee County Plumbing Permit Application fee schedule
$20.00 per fixture
Residential — fuel gas piping system, per outlet
$20.00 per outlet
Residential — fuel gas pressure regulator
$30.00 each
Residential base feeAdded to the itemized fixture/outlet total
$65.00
Water Heater Replacement (special inspection)
$50.00 (no base fee required)
Backflow Preventer / new yard or fire sprinkler installation (special inspection)
$50.00
Water/Sewer service, exterior, per inspection (special inspection)
$50.00
Mobile home lot connection / Modular (one trip: sewer, water, gas)
$75.00
Trim Only Permit (rough inspection already completed)
$100.00
Commercial installationExample on the County's own form: $8,400 valuation rounds to $9,000; 9 x $20.00 = $180.00 + $65.00 base = $245.00 total
Valuation (rounded up to next $1,000) x $20.00, plus $65.00 base fee
Re-inspection Fee
$100.00
Partial Inspection Fee
$100.00
Extra Inspection
$100.00

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Salida?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground / Under-slab

    Before concrete pour

  2. 2

    Rough-In

    Before walls closed

  3. 3

    Final

    Fixtures connected, no leaks, proper venting

See the full Salida inspection guide — scheduling & re-inspection fees →

Tips

  • CSST (corrugated stainless steel tubing) bonding requires a special inspection by the ELECTRICAL inspector, not the plumbing inspector, at a flat $50.00 fee — factor in scheduling both trades if your project uses CSST.

Frequently asked questions

Salida requires a plumbing permit for: Submit the Chaffee County Plumbing Permit Application; residential fixture fees are per-fixture, commercial work is valuation-based; Colorado's homeowner clause allows an owner-occupant to self-perform plumbing work on their sole residence if not for sale/resale/rental. If your project isn't listed, confirm with Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) at City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208 before starting work.

In Salida, the published Residential — per plumbing fixture (tub, shower, toilet, sink, bidet, clothes washer, dishwasher) is: $20.00 per fixture. Additional published fees: Residential — fuel gas piping system, per outlet — $20.00 per outlet; Residential — fuel gas pressure regulator — $30.00 each; Residential base fee — $65.00; Water Heater Replacement (special inspection) — $50.00 (no base fee required); Backflow Preventer / new yard or fire sprinkler installation (special inspection) — $50.00; Water/Sewer service, exterior, per inspection (special inspection) — $50.00; Mobile home lot connection / Modular (one trip: sewer, water, gas) — $75.00; Trim Only Permit (rough inspection already completed) — $100.00; Commercial installation — Valuation (rounded up to next $1,000) x $20.00, plus $65.00 base fee; Re-inspection Fee — $100.00; Partial Inspection Fee — $100.00; Extra Inspection — $100.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Salida does not publish a plan-review timeline for this permit. Contact Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) at City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208 for current turnaround.

You'll need: Chaffee County Plumbing Permit Application. See the required-documents checklist on this page for details on each.

Salida requires 3 inspection(s) for a plumbing permit, in order: Underground / Under-slab, Rough-In, Final. Schedule each through Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) (City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208).

Apply through Two-agency split: City of Salida Community Development Department (zoning/fire/Land-Use-Code review and City permit fee, first step) + Chaffee County Building Safety Department (I-Code plan review, permit issuance, fees, and inspections, second step) at City of Salida Community Development Department: The Touber Building, 448 E. First Street, Suite 112, Salida, CO 81201. Chaffee County Building Safety Department: 104 Crestone Ave., Room 125 (2nd Floor), Salida, CO 81201 (mailing: P.O. Box 699, Salida, CO 81201). Phone: City of Salida: 719-539-4555 (fax 719-539-5271). Chaffee County Building Safety Department: 719-539-2124 (Option 1 for inspections, Option 2 for applications/fees); fax 719-530-9208, email: City of Salida (zoning/land use/building permit inquiries): planning@cityofsalida.com; Commercial Permit Inquiries/Major Impact Review: kristen.hodges@cityofsalida.com. Chaffee County Building Safety Department: bdepartment@chaffeecounty.org (electronic plan submittals: eplans@chaffeecounty.org). Office hours: City of Salida Community Development: Monday-Thursday, 8:00 a.m.-5:00 p.m. (per the City's own Contact Information block on the Building Permit Review page). Chaffee County Building Safety Department: operates on a 4-day work week (Monday-Thursday), inspections performed Monday-Thursday excluding federal holidays; inspection requests must arrive by 4:00 p.m. the business day before the desired inspection date (Friday afternoon requests roll to Tuesday).. Official information: https://www.cityofsalida.com/commdev/page/building-permit-review and https://www.chaffeecounty.org/departments/building_department/index.php.

Salida, Colorado has adopted: 2021 International Building Code (IBC) — adopted by the City of Salida per the City's own Building Permit Review page: 'The City adopted the 2021 International Codes for Building, Residential, Existing Buildings, Plumbing, Mechanical, Energy Conservation, Fuel Gas and Property Maintenance with the 2021 IECC and the 2021 National Electric Code.' Chaffee County Building Safety Department's own Adopted Codes & Design Criteria page independently confirms the same 2021 I-Code suite (IBC, IRC, IFC, IPC, IMC, IFGC, IECC, IEBC) is the edition actually enforced county-wide, including for Salida.; 2021 International Residential Code (IRC) — same dual-source confirmation as above; 2021 International Existing Building Code (IEBC); 2021 International Plumbing Code (IPC); 2021 International Mechanical Code (IMC); 2021 International Fuel Gas Code (IFGC); 2021 International Energy Conservation Code (IECC) — Chaffee County's Residential Building Application requires an IECC Compliance Path Certificate, Manual J/S/D submittal, and blower-door/duct/ventilation testing by a RESNET- or BPI-certified tester; 2021 International Property Maintenance Code — named on the City's own adopted-codes list; 2023 National Electrical Code (NFPA 70 / NEC) — City of Salida's own page states '2021 IECC and the 2021 National Electric Code,' but Chaffee County Building Safety Department's Adopted Codes & Design Criteria page (the agency that actually issues and enforces electrical permits) lists the 2023 NEC as currently adopted; this is a genuine, honestly-flagged discrepancy between the City's own page text and the County's live enforced edition — applicants should confirm the currently enforced NEC edition directly with Chaffee County Building Safety Department at time of submittal; 2017 ICC A117.1 Accessible and Usable Buildings and Facilities — Chaffee County Adopted Codes & Design Criteria page; Colorado Wildfire Resiliency Code (effective July 1, 2026) and 2021 International Wildland-Urban Interface Code (IWUIC) — Chaffee County Adopted Codes & Design Criteria page; note several IWUIC-specific submittal requirements on the County's own Residential Building Application are explicitly scoped to 'Unincorporated Chaffee County Only,' meaning some (not all) IWUIC provisions may not directly apply within Salida city limits — confirm scope with the County Building Department for any given IWUIC provision; Colorado Model Electric Ready & Solar Ready Code — Chaffee County Adopted Codes & Design Criteria page; the County's Residential Building Application requires roof load design for future solar panels and a solar-ready zone/interconnection pathway on submitted plans; Salida Municipal Code Chapter 16, Land Use and Development — governs zoning compliance, setbacks, dimensional standards, landscaping, and parking; reviewed by the City of Salida Community Development Department as the mandatory first step before any County building-permit review begins. Local amendments apply — see the Salida overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salida building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.