Accessory Dwelling Unit (ADU) Building Permit — Salida, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.cityofsalida.com/commdev/page/accessory-dwelling-unit-adu-building-info
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) Building Permit in Salida, Colorado
Required for construction of an Accessory Dwelling Unit in Salida, whether internal/attached to the principal dwelling or in a detached accessory building. Governed by the Salida Land Use Code (zoning eligibility, size caps, setbacks) reviewed by the City first, then the same two-step Building Permit process as new construction/additions for the actual construction.
Verified 2026-07-06 · Source
When you need this permit
- ADUs are permitted only in R1, R2, R3, MN, MC, MD, MH, and AG zone districts per the City of Salida's own ADU Building Info page
- Only one ADU permitted per lot
- Internal/attached ADU: up to 1,000 sq ft of conditioned living space (no more than 800 sq ft above the first floor), provided the remaining principal dwelling is larger than the ADU
- Detached ADU in an accessory building 16 ft or less in height: up to 1,000 sq ft, provided the principal dwelling is larger
- Detached ADU in an accessory building over 16 ft in height: capped at 800 sq ft, provided the principal dwelling is larger
- Setbacks: minimum 5 ft from side property lines, 10 ft from rear (5 ft rear setback may be granted with adequate utility service demonstration)
- One off-street parking space is likely required for the ADU; access should come from an alley where one exists
- ADU cannot be condominiumized or sold separately from the principal dwelling, and cannot be rented for periods under 30 days
- Use the same City Residential Building Permit Application (check 'Accessory Dwelling Unit (ADU)' box, specify internal/attached vs. detached conditioned square footage) and the same Chaffee County Residential Building Application as new construction
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Framing
Performed by Chaffee County, same sequence as new construction
- 2
MEP Rough-In
Each trade requires its own permit
- 3
Final Inspection (County) + Municipal Sign-Off (City)
Both required before Certificate of Occupancy
See the full Salida inspection guide — scheduling & re-inspection fees →
Tips
- Zoning eligibility (permitted district, size cap, setbacks) is a CITY OF SALIDA determination under the Land Use Code — confirm your zone district and size cap with City of Salida Community Development before finalizing construction plans, since the City determines whether a space counts as an ADU 'based on its design and actual or intended use, not solely on how it is described in an application,' per the City's own ADU page.
- An ADU cannot be rented for periods under 30 days and cannot be condominiumized/sold separately — this is a use restriction enforced by the City, independent of the County's building-code review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salida building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Salida
Accessory Dwelling Unit (ADU) Building Permit in other cities
Compare accessory dwelling unit (adu) building permit fees across Colorado →
Look up this fee in a different city →