Commercial / Mixed-Use / Multi-Family Building Permit (New Construction, Addition, Alteration, Tenant Improvement) in Salida, Colorado
Required for new commercial/mixed-use/multi-family construction, additions, and interior or exterior alterations (including tenant improvements) in Salida. Same two-step City-then-County model as residential: the City of Salida Community Development Department first reviews the Commercial/Mixed-Use/Multi-Family Building Permit Application for zoning compliance, fire safety, lighting (Sec. 16-4-100), and landscaping (Sec. 16-4-80) standards and collects its own City Permit Fee (20% of the county fee, minimum $100 — a higher minimum than the $50 residential floor); the application is then forwarded to Chaffee County Building Safety Department, which performs the I-Code plan review using a distinct commercial valuation table (2024 ICC Building Valuation Data, by IBC occupancy group and construction type), issues the permit, collects its county fee, and performs inspections. Salida and Chaffee County have NO separately named 'Tenant Improvement Permit' — interior tenant-improvement work (with no change to the building footprint) is processed through this SAME Commercial/Mixed-Use/Multi-Family Building Permit Application by checking 'Remodel' and 'Interior' under Work Type; a pure change of occupancy/use with NO construction at all instead uses a separate, distinct 'Change of Use Notification' (see tips/documents below), not this Building Permit.
Reviewed 2026-08-02 · Source
When you need this permit
- STEP 1: Submit the City of Salida Commercial/Mixed-Use/Multi-Family Building Permit Application (448 E. First Street, Suite 112) — check 'Commercial,' 'Addition,' 'Remodel,' 'Accessory Structure,' 'Mixed-Use,' or 'Multi-Family' as applicable, and 'Interior' and/or 'Exterior' under Work Type; for a tenant improvement with no footprint change, check 'Remodel' + 'Interior'
- Required City document checklist per the form itself: Site Plan(s) with utilities layout (for Public Works review), Floor Plans, Building Elevations, Drainage Study/Plan (per Sec. 16-4-30(c)), Water Tap Application, Special Flood Hazard Development Permit (if in the floodplain), the Chaffee County Building Permit Application, and Proof of Ownership
- Pay the City Permit Fee: 20% of the county building permit fee, minimum $100 (commercial/mixed-use/multi-family — double the $50 residential minimum), due at City submittal, per the City's own Commercial/Mixed-Use/Multi-Family Building Permit Application and corroborated by the City's 2026 Fees and Charges for Community Development Services schedule
- Larger commercial developments may ALSO require a separate City Site Plan Review or Conditional Use Permit track under Salida Municipal Code Chapter 16 (Minor Site Plan Review, Major Site Plan Review, or Conditional Use Permit), layered on top of — not instead of — the Building Permit; the City's Commercial Permit Inquiries/Major Impact Review contact is Kristen Hodges (kristen.hodges@cityofsalida.com). Which specific commercial projects trigger this additional track was not confirmed within the scope of this review — confirm directly with City of Salida Community Development before assuming the Building Permit alone is sufficient for a large-scale project
- STEP 2 (after City review/forward): Submit the Chaffee County Commercial Permit Application (Revised April 2026) with one complete, unlocked electronic plan set (PDF or Dropbox link; no hand-drawn plans) — Site Plan, Structural & Architectural Plans (sealed/signed/dated by a Colorado-licensed architect or engineer where required), Floor Plans, Floor & Roof Framing Plans, Elevations, Sections/Details/Schedules, and the Chaffee County Commercial Energy Compliance Certificate (2021 IECC commercial path)
- Mechanical, Electrical, and Plumbing (MEP) plans are required for commercial buildings with an occupant load over 10, and COMcheck compliance documentation is required for the electrical and mechanical portions, per the County's own Building Permit Submittal Requirements
- Geotechnical report required for ALL commercial projects involving excavation (no slope-percentage threshold, unlike the residential >20%-slope trigger), per the County's own Building Permit Submittal Requirements
- A separate Fire District review applies: the County's own submittal checklist lists a 'Completed Fire Application' as required specifically for 'Commercial Projects located in Unincorporated Chaffee County Only,' while a separate 'Application for a Construction Review' packet included with the County's commercial forms names BOTH Chaffee County Fire Protection District and South Arkansas Fire Protection District as possible Authorities Having Jurisdiction — confirm which fire district has jurisdiction over your specific Salida property and that district's own plan-review/impact-fee requirements directly, since this was not resolvable from the fetched documents alone
- Pay the Chaffee County Building Permit Fee: Total Valuation x 0.007, plus a Plan Review Fee of 10% of that Building Permit Fee ($110.00 minimum, inclusive of plan review) — same 0.7%/10% formula as residential, but valuation is computed from the County's commercial-specific 2024 ICC Building Valuation Data table (by IBC occupancy group and construction type), not the flat VB/R3 per-square-foot rate used for single-family residential
- Both a Final Inspection AND Municipal (City of Salida) Sign-Off AND County approval are required before a Certificate of Occupancy will issue, consistent with the residential process
- If the project involves ONLY a change of occupancy/use with NO construction and NO footprint change, do not use this Building Permit — use the separate Change of Use Notification instead (Chaffee County form, co-branded with Salida/Buena Vista/Poncha Springs, Revised April 2024), which states outright: 'If you are changing the footprint or doing any construction please fill out a Building Permit application instead of this application'
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
City Zoning / Fire Safety / Site Plan Review Sign-off
Pre-construction review by City of Salida Community Development for zoning compliance, fire safety, and (for larger projects) Site Plan Review or Conditional Use Permit compliance under Chapter 16 — required before the application is forwarded to the County
- 2
Fire District Plan Review
Separate review/inspection track by Chaffee County Fire Protection District or South Arkansas Fire Protection District depending on jurisdiction, per the County's own Application for a Construction Review
- 3
Foundation / Footing
Performed by Chaffee County Building Safety Department before concrete pour
- 4
Framing
Performed by Chaffee County
- 5
MEP Rough-In
Mechanical, electrical, and plumbing rough-in; commercial buildings with occupant load over 10 require full MEP plans and COMcheck; each trade requires its own separate permit
- 6
Final Inspection (County) + Municipal Sign-Off (City of Salida) + Fire Department Final
A County final inspection, City of Salida municipal sign-off, and (where applicable) a fire district final inspection are required before a Certificate of Occupancy is issued
See the full Salida inspection guide — scheduling & re-inspection fees →
Tips
- There is NO separately named 'Tenant Improvement Permit' in Salida or Chaffee County. Interior tenant-improvement work with no change to the building footprint is processed through this same Commercial/Mixed-Use/Multi-Family Building Permit Application by checking 'Remodel' + 'Interior' under Work Type — the same two-step City-then-County process and the same fee formulas described above apply.
- If the ONLY thing changing is the occupancy/use of an existing space — no construction, no footprint change — do not file this Building Permit at all. File the separate Change of Use Notification instead ($100 County + $100 City, plus fire sign-off): the County's own form states outright, 'If you are changing the footprint or doing any construction please fill out a Building Permit application instead of this application.'
- The City's commercial permit minimum fee ($100) is double the residential minimum ($50) — don't assume the residential fee floor applies when estimating costs for a small commercial/mixed-use project.
- Confirm early whether your project also needs a City Site Plan Review (Minor $300 / Major $1,500) or Conditional Use Permit ($750-$1,500) — these are separate City of Salida development-review fees layered on top of, not instead of, the Building Permit fee, and were not fully scoped in this review; contact Kristen Hodges (kristen.hodges@cityofsalida.com), the City's own listed contact for 'Commercial Permit Inquiries, Major Impact Review.'
- A geotechnical report is required for EVERY commercial project involving excavation in Chaffee County — unlike residential, there is no slope-percentage threshold that must be exceeded first.
- MEP (mechanical/electrical/plumbing) plans and COMcheck documentation are specifically required once a commercial building's occupant load exceeds 10 — confirm your occupant load calculation early, since it determines this submittal requirement.
- Fire District review is a genuinely separate track from both the City's zoning/fire sign-off and the County's building-code review: confirm whether Chaffee County Fire Protection District or South Arkansas Fire Protection District has jurisdiction over your specific Salida address, and get that district's own plan-review and impact-fee amounts directly — they were not resolvable from the fetched application packet.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Salida building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Salida.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Salida
Commercial / Mixed-Use / Multi-Family Building Permit (New Construction, Addition, Alteration, Tenant Improvement) in other cities
Look up this fee in a different city →
Now live
Build your Salida project checklist
Describe your project once and get every permit, document, and fee it triggers in Salida — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →