Inspection sequence, scheduling, and re-inspection fees for building permits in Delta, Colorado.

Verified 2026-07-13 · Source

How to schedule

Inspections are requested through the building department below.

Address
360 Main Street, Delta, CO 81416
Phone
970-874-7909
Office hours
Not published on the City's Building page or any retrieved City document this session; inspection requests are called in from 8:00 a.m. to 4:30 p.m. at 970-874-7909, per the City's Inspection Guidelines (updated 6-12-2023). General City Hall address is 360 Main Street, Delta, CO 81416, main line (970) 874-7566.

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Footing Trenches

    Required for footing, trenches, formed footings, and drilled piers/caissons with reinforcing steel in place; includes rebar ground for electrical (concrete-encased electrode)

  2. 2

    Foundation

    Forms with reinforcing steel in place, ready for concrete, before concrete is placed

  3. 3

    Damp-proofing

    Required only for basements

  4. 4

    Rough Mechanical / Rough Electrical (underground)

    Only if part of the system will be covered by concrete before the entire rough-in is complete

  5. 5

    Roof and Wall Sheathing

    Before dry-in or house wrap

  6. 6

    House Wrap, Window Flashing, Flashing at Concrete Porches

  7. 7

    Rough Plumbing

    Made when rough-in is complete and water/air is in the lines per code; performed by the State of Colorado Plumbing Inspector, not the City

  8. 8

    Rough Mechanical

    All ductwork/piping completely roughed in, ready for drywall

  9. 9

    Rough Electrical

    Electrical rough-in complete, all circuits made up, panel set, grounding complete, ready for drywall but without insulation; performed by the City of Delta

  10. 10

    Framing

    Not requested until all framing complete, roof on, and all plumbing/heating/electrical rough-ins completed and approved

  11. 11

    Insulation (walls)

  12. 12

    Lathing or Drywall

    Prior to taping and finishing

  13. 13

    Final Inspections

    Electrical, Mechanical, and Building Final Inspections signed off by the City of Delta; Plumbing Final Inspection signed off by the State of Colorado. Certificate of Occupancy issues automatically after all finals are complete.

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation (if applicable)

  2. 2

    Rough Mechanical / Electrical

    City handles electrical inspection in-city; mechanical rough-in inspected by the City

  3. 3

    Rough Plumbing

    Performed by the State of Colorado Plumbing Inspector, not the City

  4. 4

    Framing

  5. 5

    Insulation / Drywall

  6. 6

    Final Inspection

    Building/Electrical/Mechanical finals by the City; Plumbing final by the State

Applies to: Electrical Permit

  1. 1

    Rough Electrical (underground, if applicable)

  2. 2

    Rough Electrical

    Circuits made up, boxes/plaster rings installed, panel set, grounding complete, ready for drywall

  3. 3

    Final Electrical

    Signed off by the City of Delta

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical (underground, if applicable)

  2. 2

    Rough Mechanical

    All ductwork/piping roughed in, ready for drywall

  3. 3

    Final Mechanical

    Signed off by the City of Delta as part of the overall building-permit final inspection process

Applies to: EV Charger / EVSE Permit (Electrical Permit)

  1. 1

    Rough Electrical (if applicable)

  2. 2

    Final Electrical

    Charger circuit/unit installed, breaker sized correctly, energized; signed off by the City of Delta

Applies to: Plumbing Permit (Issued by the State of Colorado, Not the City)

  1. 1

    Rough Plumbing

    Performed by the State of Colorado Plumbing Inspector

  2. 2

    Final Plumbing

    Signed off by the State of Colorado, separate from the City's Building Final

Applies to: Re-Roof Permit

  1. 1

    Roof and Wall Sheathing

    Before dry-in, per the general Inspection Guidelines sequence

  2. 2

    Final Inspection

    Signed off by the City of Delta as part of the overall building-permit final process

Applies to: Solar Permit

  1. 1

    Structural/Roof-Mount Inspection

    Verifies racking attachment and roof penetration sealing against the engineer analysis submitted with the application

  2. 2

    Electrical Inspection

    Verifies the one-line diagram, disconnects, rapid shutdown control, and interconnection wiring against the Technical Permit's photovoltaic work type

Final inspection only: Demolition Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Delta building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Delta building permits

Get alerts for Delta

We'll email you when Delta's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.