Change of Use Permit — Delta, Colorado · Requirements sheet
Verified 2026-08-13 · Source: https://www.cityofdelta.net/cd/page/building-permit-application-and-information
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use Permit in Delta, Colorado
The City of Delta's standard Building Permit Application includes a dedicated Section 7, 'CHANGE OF USE — FROM ___ TO ___', separate from the form's Type of Work checkboxes (New, Addition, Remodel, Foundation, Re-Roof, Other). A change of use is therefore processed on the same application as any other building permit, governed by the City's adopted 2018 International Existing Building Code (IEBC) and, where the fire code official determines it applies, IFC Chapter 11 (Existing Buildings) as locally amended by DMC Sec. 15.04.030.J. There is no separate change-of-use-specific fee line on the 2026 Fee Schedule; it bills on the standard valuation-based Building Permit Fee table (Table 3B) like any other Delta building permit.
Verified 2026-08-13 · Source
When you need this permit
- 'CHANGE OF USE' is Section 7 of the City of Delta Building Permit Application, with FROM/TO fields — a distinct section from the form's Type of Work checkboxes (New/Addition/Remodel/Foundation/Re-Roof/Other)
- Governed by the City's adopted 2018 International Existing Building Code (IEBC); the locally-amended IFC Sec. 1101.1 additionally authorizes the fire code official to apply IFC Chapter 11 (Existing Buildings) requirements when a building is undergoing a change of occupancy under the 2018 IBC or IEBC
- Total Cost of Labor & Materials (valuation) is a required field on the Building Permit Application for every submission, including a change-of-use application — the form provides no exemption from this field for a use-only change with no accompanying construction scope
- The application's Office Use Only section includes a 'FIRE SPRINKLERS REQUIRED — YES/NO' checkbox reviewed by City staff, meaning a change of use can trigger a fire-sprinkler requirement determination as part of the same review (see the fire-sprinkler-alarm-permit entry)
- If the new use is not permitted-by-right in the applicable zoning district, the City's Land Development fee schedule lists a 'Conditional Use/Change in Nonconforming Use' process ($200.00 fee) as the general mechanism for approving a use not allowed outright by zoning; no change-of-use-specific zoning citation beyond this general fee-schedule line item has been verified in the Delta Municipal Code's zoning chapters
- Separate permits for electrical, solar, and mechanical work (City) and plumbing (State of Colorado) still apply if the change of use involves any construction/trade work, per the standard Building Permit Application disclosures documented elsewhere for this jurisdiction
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Since Change of Use is filed via the standard Building Permit Application, no separate change-of-use-specific fee line exists on the 2026 Fee Schedule. Show full citationHide
Since Change of Use is filed via the standard Building Permit Application, no separate change-of-use-specific fee line exists on the 2026 Fee Schedule. What a pure change-of-use application with a $0 declared construction value would be charged is genuinely unresolved — the form requires a valuation field but the Fee Schedule does not state a floor specific to a non-construction use change; confirm directly with Community Development (970-874-7909)Review timeline
Inspection process
- 1
Final Inspection
The Building Permit Application's Office Use Only section includes Site Development Review, Construction Type, Occupancy Type, Fire Sprinklers Required, Flood Plain, Plan Review, and Zoning sign-off fields, implying staff review/sign-off before the permit closes; the form does not describe change-of-use-specific inspection items distinct from a standard residential or commercial final
See the full Delta inspection guide — scheduling & re-inspection fees →
Tips
- Delta's Building Permit Application has its own numbered 'CHANGE OF USE' section (Section 7) distinct from the Type of Work checkboxes — don't assume you need to check 'Other' under Type of Work only; fill in the FROM/TO fields in Section 7 as well.
- Budget time for the valuation field even on a pure use-change with no construction — the standard Building Permit Application requires a declared Total Cost of Labor & Materials, and how a genuinely $0-valuation change of use is fee'd is not spelled out in the published Fee Schedule.
- If your new use isn't allowed by right in the zoning district, budget for the City's $200.00 Conditional Use/Change in Nonconforming Use process (Section 6 of the Land Development fee schedule) as a likely prerequisite.
- A change of use can trigger a fire-sprinkler-required determination — the application's own Office Use Only section has a dedicated Fire Sprinklers Required Yes/No field, so coordinate with the fire-sprinkler-alarm-permit entry if the answer comes back Yes.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fee schedules
Applications & forms
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Delta building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Delta's permit history is searchable by address
5,529 permits in our copy of Delta's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Delta has issued.
All 5,529 carry an issued date, running from 2016 to 2026.
Other permits in Delta
Change of Use Permit in other cities
Compare change of use permit fees across Colorado →
Look up this fee in a different city →