Skip to main content
PermitBase

Plumbing Permit (State-Default, Unconfirmed Local Program) in Calhan, Colorado

Calhan's Building Permit Application and Building Code & Permits page do not list a distinct plumbing permit type, fee, or inspection process — only Water Service and Sewer Service utility-tap line items (Town-administered utility connections, not IPC permits) appear on the application form. Because Calhan shows no evidence of running its own certified plumbing inspection program (unlike its self-run building/roofing/mechanical program), this file documents plumbing work as defaulting to the Colorado State Plumbing Board (DORA) under the statewide default rule, consistent with the Town's identical, explicitly-stated treatment of electrical work. Re-chased 2026-07-23: using a live browser session (not a static fetch) to render DORA's client-side-JS 'Verify Plumbing Job Site Jurisdiction' tool at dpo.colorado.gov/EandP/Permits (successfully accessed this time, superseding the prior review's 'inaccessible via static fetch' note), El Paso County IS listed among the counties DORA excludes from State Plumbing Board jurisdiction because they have their own local plumbing inspection program — DORA's own list links that El Paso County exclusion directly to pprbd.org (Pikes Peak Regional Building Department). But PPRBD's own site states verbatim it does 'not service the townships of Ramah or Calhan' — so DORA's county-level exclusion list, read literally, would misroute a Calhan plumbing job to a local department (PPRBD) that explicitly refuses to serve Calhan, while DORA's own materials contain no Calhan/Ramah-specific carve-out (unlike the Town's own electrical statement, which is unambiguous). This is a genuine, newly-documented conflict between two official Colorado sources, not resolved by either agency's public-facing materials as of this review. The State Plumbing Board's general Permit and Inspection Information page (dpo.colorado.gov/Plumbing/PermitInspectionInfo) was also re-checked and states only that the state 'employs inspectors who inspect in 27 counties' without naming them or addressing sub-county municipal carve-outs. No new avenue closed this gap; it remains confidence: partial and applicants should confirm directly with the Town, DORA, or PPRBD before applying.

Reviewed 2026-07-06 · Source

When you need this permit

  • No Town of Calhan-specific plumbing permit application, fee, or process was locatable on the Town's Building Code & Permits page or Building Permit Application
  • Per the general Colorado statewide default (a permit and inspections are required for all plumbing/fuel gas piping work either through the State Plumbing Board or the Local Authority Having Jurisdiction), and because Calhan shows no evidence of an independent certified plumbing program, applicants should confirm directly with either the Town of Calhan (719-347-2586) or the Colorado State Plumbing Board (303-894-7800) before starting plumbing work

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State Plumbing Permit Fee (probable default)confidence: partial — see description
Not confirmed — contact DORA State Plumbing Board (303-894-7800) or the Town of Calhan directly to confirm the correct issuing authority and fee before applying

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit (State-Default, Unconfirmed Local Program) permit actually take in Calhan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Plumbing Inspection (authority unconfirmed)

    Likely performed by the Colorado State Plumbing Board absent a confirmed local program; verify directly with the Town or DORA

See the full Calhan inspection guide — scheduling & re-inspection fees →

Tips

  • Before starting any plumbing work in Calhan, call the Town Clerk's office (719-347-2586) AND check with the Colorado State Plumbing Board (303-894-7800, https://dpo.colorado.gov/Plumbing) to confirm which authority currently issues plumbing permits for Calhan specifically — DORA's own live jurisdiction tool lists all of El Paso County (via PPRBD) as excluded from State plumbing jurisdiction, yet PPRBD itself explicitly refuses to service Calhan, an unresolved conflict between the two official sources confirmed 2026-07-23.
  • Do not confuse the Town's Water Service / Sewer Service tap-fee line items (utility connection charges under Calhan Municipal Code Chapter 14) with an International Plumbing Code permit — they are billed and administered separately.

Frequently asked questions

Calhan requires a plumbing permit (state-default, unconfirmed local program) for: No Town of Calhan-specific plumbing permit application, fee, or process was locatable on the Town's Building Code & Permits page or Building Permit Application; Per the general Colorado statewide default (a permit and inspections are required for all plumbing/fuel gas piping work either through the State Plumbing Board or the Local Authority Having Jurisdiction), and because Calhan shows no evidence of an independent certified plumbing program, applicants should confirm directly with either the Town of Calhan (719-347-2586) or the Colorado State Plumbing Board (303-894-7800) before starting plumbing work. If your project isn't listed, confirm with Town of Calhan Public Works Department (permits issued through the Town Clerk's office) at 719-347-2586 before starting work.

In Calhan, the published State Plumbing Permit Fee (probable default) is: Not confirmed — contact DORA State Plumbing Board (303-894-7800) or the Town of Calhan directly to confirm the correct issuing authority and fee before applying. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Calhan does not publish a plan-review timeline for this permit. Contact Town of Calhan Public Works Department (permits issued through the Town Clerk's office) at 719-347-2586 for current turnaround.

You'll need: Colorado State Plumbing Permit Application (probable default). See the required-documents checklist on this page for details on each.

Calhan requires 1 inspection(s) for a plumbing permit (state-default, unconfirmed local program), in order: Plumbing Inspection (authority unconfirmed). Schedule each through Town of Calhan Public Works Department (permits issued through the Town Clerk's office) (719-347-2586).

Apply through Town of Calhan Public Works Department (permits issued through the Town Clerk's office) at 556 Colorado Avenue, P.O. Box 236, Calhan, CO 80808-0236. Phone: 719-347-2586, email: townclerk@calhan.co. Office hours: Monday-Friday, 8:00 AM to 4:30 PM MT. Fax: 719-347-2581. The Town Clerk (Cindy Tompkins) handles day-to-day building permit issuance and business licensing; the Public Works Department (created under Calhan Municipal Code 6.01.010) holds oversight of the building permit and inspection program under the Public Works Director.. Official information: https://www.calhan.co/services/building_code_permits.php.

Calhan, Colorado has adopted: Pikes Peak Regional Building Code (PPRBC), 2023 Edition, 2nd Printing, as amended, together with Appendix A and Appendix B, as published by Pikes Peak Regional Building Department, 2880 International Circle, Colorado Springs, CO 80910 — adopted by reference as the Town of Calhan Building Code under Calhan Municipal Code Sec. 6.01.020, 'and all secondary codes duly described or referenced therein.' This is the CURRENT governing code, adopted via an emergency ordinance whose text (Calhan Municipal Code Sec. 6.01, Section 16 'Emergency Clause') states the provisions 'must be effective prior to July 1, 2026 in order to limit the excessively burdensome energy code requirements that will increase the costs of development in the Town' — i.e. Calhan deliberately moved off standalone 2018-cycle ICC codes and onto the PPRBC bundle (which itself packages current-cycle IBC/IRC/IMC/IPC/IFGC/IECC/NEC secondary codes) specifically to get ahead of the statewide HB22-1362 energy-code floor before it tightened further on 7/1/2026.; Building Code Amendments (Calhan Municipal Code Sec. 6.01.040): RBC112 (Dangerous Buildings) is deleted in its entirety; RBC312 (Enumeration Code) is deleted in its entirety.; Permits, permit fees, and inspections are governed by Sections RBC105, RBC108, and RBC109 of the (PPRBC) Building Code per Calhan Municipal Code Sec. 15.08.020.K.1, as repealed and reenacted by the same emergency ordinance.; SUPERSEDED (repealed in their entirety by the same ordinance, Sections 6-14, but historically the town's prior locally-adopted 2018-cycle code suite, still referenced on the town's own website/permit-program page as of this review): International Building Code 2018 (former Calhan Municipal Code Article 5); International Mechanical Code 2018 (former Article 6); International Fire Code 2018 (former Article 7 — Article 7/Fire Code was NOT listed among the repealed articles in the ordinance's Sections 6-14 and its current status is unresolved, see tipsAndGotchas); National Electrical Code 2020 (former Article 8, repealed); International Plumbing Code 2018 (former Article 9, repealed); International Energy Conservation Code 2018 (former Article 10, repealed); International Residential Code 2018 (former Article 11, repealed) — this article's amendment schedule included Calhan's own local Climatic/Geographic Design Criteria table (30 psf ground snow load, 115 mph wind speed no topo effects, Seismic Design Category B, Severe weathering, 30-inch frost depth, slight-to-moderate termite, winter design temp 1F, ice barrier underlayment required, air freezing index 1,000, mean annual temp 45F) and several plumbing/mechanical/fuel-gas amendments (18-inch minimum burial for plastic gas/fuel piping, 20 psig/20-minute test parameters, 12-inch trap-arm and cleanout-related amendments); International Fuel Gas Code 2018 (former Article 12, repealed); International Existing Building Code 2018 (former Article 13, repealed). NOTE: the Town's own public-facing building_code_permits.php webpage still describes the adopted code as plain 'International Building Code 2018' as of this review — this is stale relative to the actual codified ordinance text, which governs. Direct code citation (RBC-prefixed sections) confirms the current PPRBC adoption is authoritative.; Fire Protection Impact Fee (Calhan Municipal Code Article 14, NOT repealed by the above ordinance — remains standing): imposed under CRS 29-20-104.5 authority (as amended by HB16-1088) on new development served by the Calhan Fire Protection District. This is a development impact fee collected at building-permit application, not itself a building-permit type.. Local amendments apply — see the Calhan overview page for the full list.

This is not fully confirmed. The Town's Building Permit Application lists no distinct plumbing permit type, and Calhan shows no public evidence of its own certified plumbing inspection program — unlike electrical work, which the Town explicitly states goes through the State. Plumbing work most likely defaults to the Colorado State Plumbing Board (DORA) under the statewide default rule, but applicants should confirm directly with the Town before applying.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Calhan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.