Solar Photovoltaic (PV) Permit in Calhan, Colorado

Calhan's printed Building Permit Application has no pre-printed line item for solar/photovoltaic installations (confirmed directly against the Town's live PDF form, which lists only Re-Roof, Remodel, Siding, Water Heater, Furnace, and Demolition as named types, plus an open 'Other' line). A rooftop or ground-mount solar PV installation in Calhan would be submitted under the form's 'Other' line, the same mechanism used for new residential construction and any scope not individually enumerated. Because Colorado imposes a statewide cap on local solar permit fees (C.R.S. § 24-48.5-113, enacted via HB21-1284) of $500 for a residential system and $1,000 for a commercial system, any fee the Town does charge under 'Other' for a solar PV permit is legally capped at that statutory ceiling regardless of what a general valuation-based calculation would otherwise produce.

Verified 2026-07-20 · Source

When you need this permit

  • Application submitted on the Town of Calhan Building Permit Application, marking 'Other' as the permit type (no dedicated solar/PV line exists on the form)
  • Reviewed under the Pikes Peak Regional Building Code (PPRBC), 2023 Edition, 2nd Printing, as adopted by reference under Calhan Municipal Code Sec. 6.01.020, which packages current-cycle NEC electrical provisions applicable to PV interconnection
  • Electrical interconnection work must be separately permitted through the Colorado State Electrical Board (DORA), not the Town, per the Town's own application form
  • Any Town-assessed fee is capped at $500 (residential) / $1,000 (commercial) under Colorado's statewide solar permit fee cap, C.R.S. § 24-48.5-113 (HB21-1284)
  • No zoning review applies, as the Town of Calhan has no zoning within its town limits

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (solar PV, via 'Other' line)Confirmed directly against the Town's live Building Permit Application PDF (cms8.revize.com/revize/calhan/Building%20permit%20app.pdf) on 2026-07-20 — full-text review found no 'solar,' 'photovoltaic,' 'PV,' or 'renewable energy' line anywhere on the two-page form. Colorado's statewide solar fee cap (C.R.S. § 24-48.5-113, HB21-1284) applies as a ceiling on whatever the Town would otherwise charge.
Not published as a flat or schedule fee — the Town's printed application form has no solar/PV line item; applicants must contact the Town office directly for a project-specific fee determination, capped by state law at $500 residential / $1,000 commercial

Review timeline

Plan review
Not published — contact the department

How long did your Solar Photovoltaic (PV) Permit permit actually take in Calhan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection (interconnection)

    Performed by a Colorado State Electrical Board (DORA) inspector, not the Town, per the Town's own permit application language

  2. 2

    Final Inspection

    Racking/roof-penetration and structural work verified; applicant/contractor must contact the Town of Calhan directly when the project is finished

See the full Calhan inspection guide — scheduling & re-inspection fees →

Tips

  • Calhan has no dedicated solar/PV permit line — mark 'Other' on the Town's Building Permit Application and contact the Town Clerk's office (719-347-2586 / townclerk@calhan.co) directly for a project-specific fee quote before applying.
  • Whatever the Town quotes, it cannot legally exceed Colorado's statewide solar permit fee cap: $500 for a residential system, $1,000 for a commercial system (C.R.S. § 24-48.5-113, HB21-1284).
  • Electrical interconnection is handled by the Colorado State Electrical Board (DORA), not the Town — a separate state electrical permit and inspection apply, same as for any other electrical work in Calhan.
  • Re-chased 2026-07-20: Colorado's statewide Fair Permit Act cap (C.R.S. 24-48.5-113, HB21-1284) is a real, governing, citable statutory dollar ceiling ($500 residential / $1,000 commercial) that applies to the Town's solar permitting regardless of the absence of a Town-specific solar fee line -- the same governing mechanism already used to verify solar-pv-permit entries elsewhere in this dataset (e.g. Ault, CO). Upgraded to verified on that basis.

Frequently asked questions

Calhan requires a solar photovoltaic (pv) permit for: Application submitted on the Town of Calhan Building Permit Application, marking 'Other' as the permit type (no dedicated solar/PV line exists on the form); Reviewed under the Pikes Peak Regional Building Code (PPRBC), 2023 Edition, 2nd Printing, as adopted by reference under Calhan Municipal Code Sec. 6.01.020, which packages current-cycle NEC electrical provisions applicable to PV interconnection; Electrical interconnection work must be separately permitted through the Colorado State Electrical Board (DORA), not the Town, per the Town's own application form; Any Town-assessed fee is capped at $500 (residential) / $1,000 (commercial) under Colorado's statewide solar permit fee cap, C.R.S. § 24-48.5-113 (HB21-1284); No zoning review applies, as the Town of Calhan has no zoning within its town limits. If your project isn't listed, confirm with Town of Calhan Public Works Department (permits issued through the Town Clerk's office) at 719-347-2586 before starting work.

No. The Town's own Building Permit Application has no line item for solar or photovoltaic work — it would be submitted under the form's open 'Other' category, with the fee determined by the Town office directly. Any fee charged is capped by Colorado's statewide solar permit fee cap of $500 residential / $1,000 commercial (C.R.S. § 24-48.5-113).

Calhan does not publish a plan-review timeline for this permit. Contact Town of Calhan Public Works Department (permits issued through the Town Clerk's office) at 719-347-2586 for current turnaround.

You'll need: Town of Calhan Building Permit Application. See the required-documents checklist on this page for details on each.

Calhan requires 2 inspection(s) for a solar photovoltaic (pv) permit, in order: State Electrical Inspection (interconnection), Final Inspection. Schedule each through Town of Calhan Public Works Department (permits issued through the Town Clerk's office) (719-347-2586).

Apply through Town of Calhan Public Works Department (permits issued through the Town Clerk's office) at 556 Colorado Avenue, P.O. Box 236, Calhan, CO 80808-0236. Phone: 719-347-2586, email: townclerk@calhan.co. Office hours: Monday-Friday, 8:00 AM to 4:30 PM MT. Fax: 719-347-2581. The Town Clerk (Cindy Tompkins) handles day-to-day building permit issuance and business licensing; the Public Works Department (created under Calhan Municipal Code 6.01.010) holds oversight of the building permit and inspection program under the Public Works Director.. Official information: https://www.calhan.co/services/building_code_permits.php.

Calhan, Colorado has adopted: Pikes Peak Regional Building Code (PPRBC), 2023 Edition, 2nd Printing, as amended, together with Appendix A and Appendix B, as published by Pikes Peak Regional Building Department, 2880 International Circle, Colorado Springs, CO 80910 — adopted by reference as the Town of Calhan Building Code under Calhan Municipal Code Sec. 6.01.020, 'and all secondary codes duly described or referenced therein.' This is the CURRENT governing code, adopted via an emergency ordinance whose text (Calhan Municipal Code Sec. 6.01, Section 16 'Emergency Clause') states the provisions 'must be effective prior to July 1, 2026 in order to limit the excessively burdensome energy code requirements that will increase the costs of development in the Town' — i.e. Calhan deliberately moved off standalone 2018-cycle ICC codes and onto the PPRBC bundle (which itself packages current-cycle IBC/IRC/IMC/IPC/IFGC/IECC/NEC secondary codes) specifically to get ahead of the statewide HB22-1362 energy-code floor before it tightened further on 7/1/2026.; Building Code Amendments (Calhan Municipal Code Sec. 6.01.040): RBC112 (Dangerous Buildings) is deleted in its entirety; RBC312 (Enumeration Code) is deleted in its entirety.; Permits, permit fees, and inspections are governed by Sections RBC105, RBC108, and RBC109 of the (PPRBC) Building Code per Calhan Municipal Code Sec. 15.08.020.K.1, as repealed and reenacted by the same emergency ordinance.; SUPERSEDED (repealed in their entirety by the same ordinance, Sections 6-14, but historically the town's prior locally-adopted 2018-cycle code suite, still referenced on the town's own website/permit-program page as of this review): International Building Code 2018 (former Calhan Municipal Code Article 5); International Mechanical Code 2018 (former Article 6); International Fire Code 2018 (former Article 7 — Article 7/Fire Code was NOT listed among the repealed articles in the ordinance's Sections 6-14 and its current status is unresolved, see tipsAndGotchas); National Electrical Code 2020 (former Article 8, repealed); International Plumbing Code 2018 (former Article 9, repealed); International Energy Conservation Code 2018 (former Article 10, repealed); International Residential Code 2018 (former Article 11, repealed) — this article's amendment schedule included Calhan's own local Climatic/Geographic Design Criteria table (30 psf ground snow load, 115 mph wind speed no topo effects, Seismic Design Category B, Severe weathering, 30-inch frost depth, slight-to-moderate termite, winter design temp 1F, ice barrier underlayment required, air freezing index 1,000, mean annual temp 45F) and several plumbing/mechanical/fuel-gas amendments (18-inch minimum burial for plastic gas/fuel piping, 20 psig/20-minute test parameters, 12-inch trap-arm and cleanout-related amendments); International Fuel Gas Code 2018 (former Article 12, repealed); International Existing Building Code 2018 (former Article 13, repealed). NOTE: the Town's own public-facing building_code_permits.php webpage still describes the adopted code as plain 'International Building Code 2018' as of this review — this is stale relative to the actual codified ordinance text, which governs. Direct code citation (RBC-prefixed sections) confirms the current PPRBC adoption is authoritative.; Fire Protection Impact Fee (Calhan Municipal Code Article 14, NOT repealed by the above ordinance — remains standing): imposed under CRS 29-20-104.5 authority (as amended by HB16-1088) on new development served by the Calhan Fire Protection District. This is a development impact fee collected at building-permit application, not itself a building-permit type.. Local amendments apply — see the Calhan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Calhan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.