Remodel Permit in Calhan, Colorado

Covers additions and remodels to existing structures in Calhan. Listed explicitly on the Town's Building Permit Application as 'Remodel — Value Based,' meaning the permit fee is calculated from project valuation rather than a flat rate, determined by contacting the Town office.

Verified 2026-07-06 · Source

When you need this permit

  • Application submitted on the Town of Calhan Building Permit Application
  • Fee is value-based (project valuation determines the permit fee); contact the Town office for the specific calculation, as no published percentage/rate table was locatable
  • Reviewed under the Pikes Peak Regional Building Code (PPRBC), 2023 Edition, 2nd Printing, as adopted by Calhan Municipal Code Sec. 6.01.020
  • Payment and Town approval required before work begins

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Remodel Permit FeeTown of Calhan Building Permit Application lists this permit type as 'Remodel-Value Based' with no published rate table
Value-based — contact the Town office for the specific calculation
Re-inspection Fee
$55.00 per additional inspection
Permit Extension Fee
$100.00 for a 6-month extension

Review timeline

Plan review
Not published — contact the department

How long did your Remodel Permit permit actually take in Calhan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Progress Inspection(s)

    Town-designated inspector may inspect throughout the project as needed

  2. 2

    Final Inspection

    Contact the Town of Calhan directly when the project is finished

See the full Calhan inspection guide — scheduling & re-inspection fees →

Tips

  • Because the Remodel permit fee is value-based with no published rate table, call the Town Clerk's office (719-347-2586) before budgeting to get the actual fee calculation method for your project's estimated valuation.
  • If the remodel includes electrical work, that portion must be separately permitted through the Colorado State Electrical Board (DORA).

Frequently asked questions

Calhan requires a remodel permit for: Application submitted on the Town of Calhan Building Permit Application; Fee is value-based (project valuation determines the permit fee); contact the Town office for the specific calculation, as no published percentage/rate table was locatable; Reviewed under the Pikes Peak Regional Building Code (PPRBC), 2023 Edition, 2nd Printing, as adopted by Calhan Municipal Code Sec. 6.01.020; Payment and Town approval required before work begins. If your project isn't listed, confirm with Town of Calhan Public Works Department (permits issued through the Town Clerk's office) at 719-347-2586 before starting work.

The Town's Building Permit Application lists Remodel as 'Value Based,' meaning the fee depends on project valuation. The Town does not publish the specific rate table; contact the Town Clerk's office directly for the calculation.

Calhan does not publish a plan-review timeline for this permit. Contact Town of Calhan Public Works Department (permits issued through the Town Clerk's office) at 719-347-2586 for current turnaround.

You'll need: Town of Calhan Building Permit Application. See the required-documents checklist on this page for details on each.

Calhan requires 2 inspection(s) for a remodel permit, in order: Progress Inspection(s), Final Inspection. Schedule each through Town of Calhan Public Works Department (permits issued through the Town Clerk's office) (719-347-2586).

Apply through Town of Calhan Public Works Department (permits issued through the Town Clerk's office) at 556 Colorado Avenue, P.O. Box 236, Calhan, CO 80808-0236. Phone: 719-347-2586, email: townclerk@calhan.co. Office hours: Monday-Friday, 8:00 AM to 4:30 PM MT. Fax: 719-347-2581. The Town Clerk (Cindy Tompkins) handles day-to-day building permit issuance and business licensing; the Public Works Department (created under Calhan Municipal Code 6.01.010) holds oversight of the building permit and inspection program under the Public Works Director.. Official information: https://www.calhan.co/services/building_code_permits.php.

Calhan, Colorado has adopted: Pikes Peak Regional Building Code (PPRBC), 2023 Edition, 2nd Printing, as amended, together with Appendix A and Appendix B, as published by Pikes Peak Regional Building Department, 2880 International Circle, Colorado Springs, CO 80910 — adopted by reference as the Town of Calhan Building Code under Calhan Municipal Code Sec. 6.01.020, 'and all secondary codes duly described or referenced therein.' This is the CURRENT governing code, adopted via an emergency ordinance whose text (Calhan Municipal Code Sec. 6.01, Section 16 'Emergency Clause') states the provisions 'must be effective prior to July 1, 2026 in order to limit the excessively burdensome energy code requirements that will increase the costs of development in the Town' — i.e. Calhan deliberately moved off standalone 2018-cycle ICC codes and onto the PPRBC bundle (which itself packages current-cycle IBC/IRC/IMC/IPC/IFGC/IECC/NEC secondary codes) specifically to get ahead of the statewide HB22-1362 energy-code floor before it tightened further on 7/1/2026.; Building Code Amendments (Calhan Municipal Code Sec. 6.01.040): RBC112 (Dangerous Buildings) is deleted in its entirety; RBC312 (Enumeration Code) is deleted in its entirety.; Permits, permit fees, and inspections are governed by Sections RBC105, RBC108, and RBC109 of the (PPRBC) Building Code per Calhan Municipal Code Sec. 15.08.020.K.1, as repealed and reenacted by the same emergency ordinance.; SUPERSEDED (repealed in their entirety by the same ordinance, Sections 6-14, but historically the town's prior locally-adopted 2018-cycle code suite, still referenced on the town's own website/permit-program page as of this review): International Building Code 2018 (former Calhan Municipal Code Article 5); International Mechanical Code 2018 (former Article 6); International Fire Code 2018 (former Article 7 — Article 7/Fire Code was NOT listed among the repealed articles in the ordinance's Sections 6-14 and its current status is unresolved, see tipsAndGotchas); National Electrical Code 2020 (former Article 8, repealed); International Plumbing Code 2018 (former Article 9, repealed); International Energy Conservation Code 2018 (former Article 10, repealed); International Residential Code 2018 (former Article 11, repealed) — this article's amendment schedule included Calhan's own local Climatic/Geographic Design Criteria table (30 psf ground snow load, 115 mph wind speed no topo effects, Seismic Design Category B, Severe weathering, 30-inch frost depth, slight-to-moderate termite, winter design temp 1F, ice barrier underlayment required, air freezing index 1,000, mean annual temp 45F) and several plumbing/mechanical/fuel-gas amendments (18-inch minimum burial for plastic gas/fuel piping, 20 psig/20-minute test parameters, 12-inch trap-arm and cleanout-related amendments); International Fuel Gas Code 2018 (former Article 12, repealed); International Existing Building Code 2018 (former Article 13, repealed). NOTE: the Town's own public-facing building_code_permits.php webpage still describes the adopted code as plain 'International Building Code 2018' as of this review — this is stale relative to the actual codified ordinance text, which governs. Direct code citation (RBC-prefixed sections) confirms the current PPRBC adoption is authoritative.; Fire Protection Impact Fee (Calhan Municipal Code Article 14, NOT repealed by the above ordinance — remains standing): imposed under CRS 29-20-104.5 authority (as amended by HB16-1088) on new development served by the Calhan Fire Protection District. This is a development impact fee collected at building-permit application, not itself a building-permit type.. Local amendments apply — see the Calhan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Calhan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.