Calhan building permits

Department contacts, adopted codes, permit types, fees, and gotchas for Calhan, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
556 Colorado Avenue, P.O. Box 236, Calhan, CO 80808-0236
Phone
719-347-2586
Office hours
Monday-Friday, 8:00 AM to 4:30 PM MT. Fax: 719-347-2581. The Town Clerk (Cindy Tompkins) handles day-to-day building permit issuance and business licensing; the Public Works Department (created under Calhan Municipal Code 6.01.010) holds oversight of the building permit and inspection program under the Public Works Director.

Inspection guide

See how inspections work in Calhan — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • Pikes Peak Regional Building Code (PPRBC), 2023 Edition, 2nd Printing, as amended, together with Appendix A and Appendix B, as published by Pikes Peak Regional Building Department, 2880 International Circle, Colorado Springs, CO 80910 — adopted by reference as the Town of Calhan Building Code under Calhan Municipal Code Sec. 6.01.020, 'and all secondary codes duly described or referenced therein.' This is the CURRENT governing code, adopted via an emergency ordinance whose text (Calhan Municipal Code Sec. 6.01, Section 16 'Emergency Clause') states the provisions 'must be effective prior to July 1, 2026 in order to limit the excessively burdensome energy code requirements that will increase the costs of development in the Town' — i.e. Calhan deliberately moved off standalone 2018-cycle ICC codes and onto the PPRBC bundle (which itself packages current-cycle IBC/IRC/IMC/IPC/IFGC/IECC/NEC secondary codes) specifically to get ahead of the statewide HB22-1362 energy-code floor before it tightened further on 7/1/2026.
  • Building Code Amendments (Calhan Municipal Code Sec. 6.01.040): RBC112 (Dangerous Buildings) is deleted in its entirety; RBC312 (Enumeration Code) is deleted in its entirety.
  • Permits, permit fees, and inspections are governed by Sections RBC105, RBC108, and RBC109 of the (PPRBC) Building Code per Calhan Municipal Code Sec. 15.08.020.K.1, as repealed and reenacted by the same emergency ordinance.
  • SUPERSEDED (repealed in their entirety by the same ordinance, Sections 6-14, but historically the town's prior locally-adopted 2018-cycle code suite, still referenced on the town's own website/permit-program page as of this review): International Building Code 2018 (former Calhan Municipal Code Article 5); International Mechanical Code 2018 (former Article 6); International Fire Code 2018 (former Article 7 — Article 7/Fire Code was NOT listed among the repealed articles in the ordinance's Sections 6-14 and its current status is unresolved, see tipsAndGotchas); National Electrical Code 2020 (former Article 8, repealed); International Plumbing Code 2018 (former Article 9, repealed); International Energy Conservation Code 2018 (former Article 10, repealed); International Residential Code 2018 (former Article 11, repealed) — this article's amendment schedule included Calhan's own local Climatic/Geographic Design Criteria table (30 psf ground snow load, 115 mph wind speed no topo effects, Seismic Design Category B, Severe weathering, 30-inch frost depth, slight-to-moderate termite, winter design temp 1F, ice barrier underlayment required, air freezing index 1,000, mean annual temp 45F) and several plumbing/mechanical/fuel-gas amendments (18-inch minimum burial for plastic gas/fuel piping, 20 psig/20-minute test parameters, 12-inch trap-arm and cleanout-related amendments); International Fuel Gas Code 2018 (former Article 12, repealed); International Existing Building Code 2018 (former Article 13, repealed). NOTE: the Town's own public-facing building_code_permits.php webpage still describes the adopted code as plain 'International Building Code 2018' as of this review — this is stale relative to the actual codified ordinance text, which governs. Direct code citation (RBC-prefixed sections) confirms the current PPRBC adoption is authoritative.
  • Fire Protection Impact Fee (Calhan Municipal Code Article 14, NOT repealed by the above ordinance — remains standing): imposed under CRS 29-20-104.5 authority (as amended by HB16-1088) on new development served by the Calhan Fire Protection District. This is a development impact fee collected at building-permit application, not itself a building-permit type.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD through 2026-05)
8units

8 buildings · $3.7M valuation

2 month(s) reported to Census

Full year 2025
2units

2 buildings · $176,000 valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Calhan is genuinely NOT serviced by the Pikes Peak Regional Building Department (PPRBD) — this is independently confirmed directly from PPRBD's own website ('We do not service the townships of Ramah or Calhan...'), not merely assumed. Calhan runs its own small building-permit program through its Public Works Department / Town Clerk's office. Do not route a Calhan permit question to PPRBD.
  • Calhan's currently governing building code is the Pikes Peak Regional Building Code (PPRBC), 2023 Edition, 2nd Printing — adopted by reference via an emergency ordinance whose own text states it 'must be effective prior to July 1, 2026 in order to limit the excessively burdensome energy code requirements.' This SUPERSEDES the Town's prior standalone 2018-cycle IBC/IRC/IMC/IPC/IFGC/IECC/NEC/IEBC code suite, even though the Town's own public Building Code & Permits webpage still describes the code as plain 'International Building Code 2018' as of this review — the codified ordinance text controls, not the (stale) webpage summary.
  • Calhan's building-permit program is genuinely thin and largely a flat-fee system: Re-Roof, Siding, Water Heater, and Furnace are each $150 flat; Demolition is $200 flat plus a required separate state demolition permit; Remodel is value-based (contact office); anything else goes through an open 'Other' line with no published fee. New residential construction and additions are not named, individually-priced line items on the Town's own application.
  • Electrical permits are NOT issued by the Town at all — Calhan's own application form states this in bold and directs all electrical permitting to the Colorado State Electrical Board (DORA), 303-894-7800.
  • Plumbing permit authority for Calhan could not be fully confirmed. Re-chased 2026-07-23 via a live browser session: DORA's 'Verify Plumbing Job Site Jurisdiction' list (now successfully accessed, superseding the prior static-fetch-blocked note) shows all of El Paso County excluded from State jurisdiction and pointed to PPRBD — but PPRBD itself explicitly refuses to service Calhan, an unresolved conflict between the two official state/regional sources. This file documents the reasonable default (Colorado State Plumbing Board) at confidence: partial, and recommends applicants confirm directly with the Town, DORA, or PPRBD before starting plumbing work.
  • Calhan has NO zoning within its town limits, per the Town's own Building Code & Permits page.
  • A Fire Protection Impact Fee (Calhan Municipal Code Article 14, not repealed by the code-adoption ordinance) applies at building-permit application for properties served by the Calhan Fire Protection District: $777/unit single-family, $563/unit multi-family, $0.24/sq ft commercial/industrial — with stated exemptions for same-use replacement within 12 months, no-new-unit remodels, accessory structures, minor improvements (fences/walls/pools/signs), and demolition/relocation within Town.
  • Article 7 (Fire Code, formerly International Fire Code 2018) is NOT listed among the articles explicitly repealed by the code-adoption emergency ordinance (Sections 6-14 repeal Articles 2, 5, 6, 8, 9, 10, 11, 12, 13 — Article 7 is conspicuously absent from that list). Its current status (still-standing standalone 2018 IFC, or implicitly folded into the PPRBC's 'secondary codes' via Sec. 6.01.020) is not fully resolved by the ordinance text alone; treat any Fire Code question for Calhan as needing direct confirmation with the Town or Calhan Fire Protection District.
  • Both Water Service and Sewer Service utility-tap line items (Tap Fee, System Development Fee, Permit Fee, Meter Cost) appear on the back page of the same Building Permit Application form — these are Town utility-connection charges under Calhan Municipal Code Chapter 14 (Water/Wastewater), not International Plumbing Code permits, and should not be confused with plumbing permitting.
  • The Town does not publish any numeric plan-review or permit-issuance turnaround time anywhere in its public materials for any permit type — every reviewTimelineDays field in this file is honestly null/unverified with a documented chase trail, consistent with this corpus's zero-tolerance policy against inventing timelines.
  • El Paso County's data/counties.json currently lists only 'colorado-springs' under its cities[] — 'calhan' needs to be added there centrally (not done by this file, per task scope).

Comparable nearby cities

Colorado Springs
Both in El Paso County9 shared permit types
Compare fees →
Larkspur
9 shared permit types~34 mi away
Compare fees →
Castle Pines
9 shared permit types~43 mi away
Compare fees →