Sign Permit — Mount Crested Butte, Colorado · Requirements sheet
Verified 2026-08-14 · Source: https://ecode360.com/44307623
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Mount Crested Butte, Colorado
Town Code Chapter 16 (Signs and Advertising), Article II, governs sign permitting in Mount Crested Butte. A permit is required to construct, erect, remodel, move, or otherwise change or affect any sign within town limits, except signs listed as exempt; the Zoning Administrator processes applications. No permit is required to maintain a sign in good repair, or for a change of copy where the business and sign remain conforming.
Verified 2026-08-14 · Source
When you need this permit
- Application submitted to the Zoning Administrator on town-supplied forms, per Sec. 16-23
- One complete scale drawing required showing size, shape, color, design, materials, site plan (including required landscaping), specific sign location, elevation of sign on building, mounting method, and lighting
- No work may commence on a sign structure until the permit is issued, per Sec. 16-22(b)
- No permit required to maintain a sign in good repair or for a change of copy where the business stays the same and the sign remains conforming, per Sec. 16-22(c)
- If a sign is installed prior to obtaining a permit or modification, the fee is doubled, per Sec. 16-29
- The Zoning Administrator may inspect any sign and its structural/electrical connections during regular business hours to confirm code compliance, per Sec. 16-21(b)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sign Structural/Electrical Inspection
The Zoning Administrator is empowered to inspect any sign and its structural and electrical connections for code compliance, carried out during regular business hours, per Sec. 16-21(b)
See the full Mount Crested Butte inspection guide — scheduling & re-inspection fees →
Tips
- Installing a sign before your permit is issued doubles the permit fee outright, per Sec. 16-29 — don't get ahead of the paperwork.
- A rejected application isn't a dead end: reapplying for the same site doesn't require a new application fee the first time, per Sec. 16-26(a) — only a second rejection for the same site triggers a new fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-14.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mount Crested Butte building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Mount Crested Butte
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Mount Crested Butte project checklist
Describe your project once and get every permit, document, and fee it triggers in Mount Crested Butte — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →