Roofing Permit (Re-Roof) in Mount Crested Butte, Colorado

Required for re-roofing work in Mt. Crested Butte, reviewed under the 2021 IBC/IRC as adopted, with mandatory ice barrier underlayment per Table R301.2. If the re-roof affects 25% or more of the structure, the entire roof must meet Colorado Wildfire Resiliency Code (WRC) Class A roof-covering, valley-flashing, and vent-mesh requirements per the Town's own WRC Standards Summary.

Verified 2026-07-06 · Source

When you need this permit

  • Roof Ice Barrier Underlayment Required: Yes, per Table R301.2 (Mt. CB Design Criteria 2021)
  • If the re-roof project affects 25% or more of the structure, the ENTIRE roof must meet Colorado Wildfire Resiliency Code requirements: Class A roofing materials, minimum 26-gauge metal roof valleys, noncombustible gutters/downspouts, noncombustible corrosion-resistant vent mesh with 1/8-inch maximum openings
  • Roofing is explicitly listed as one of the design-review application types that 'does not require drawings/engineering' under the Town's own Design Review Fees schedule, carrying a lower flat design-review fee than projects requiring drawings
  • Contractor must hold a current Mt. CB Business License (BOLF)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Design Review Fee — application not requiring drawings/engineering (e.g., roofing, mechanical)Resolution No. 9, Series 2026 Fee Schedule, effective May 20, 2026
$100.00
Building Permit Fee (valuation-based, same schedule as new construction)No standalone flat re-roof fee is published; billed under the general valuation-based Building Permit fee table based on roofing project valuation
$23.50 minimum, scaling per Town Code Sec. 6-52 / Table R1-A
Plan Check Fee
65% of the Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof) permit actually take in Mount Crested Butte?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underlayment and Flashing Inspection

    Ice barrier underlayment and valley flashing verified before roof covering installation is completed

  2. 2

    Final Inspection

See the full Mount Crested Butte inspection guide — scheduling & re-inspection fees →

Tips

  • Confirm whether your re-roof affects 25% or more of the existing roof area before assuming Colorado Wildfire Resiliency Code Class A materials aren't required — this is a percentage-of-structure trigger under the statewide WRC, not a mapped-zone trigger like some peer jurisdictions use.
  • Roofing applications are explicitly categorized under the Town's lighter 'no drawings/engineering required' Design Review fee tier ($100 vs. $200+ for drawing-requiring projects) — confirm with the Building Division that your specific re-roof scope qualifies for this track.

Frequently asked questions

Mount Crested Butte requires a roofing permit (re-roof) for: Roof Ice Barrier Underlayment Required: Yes, per Table R301.2 (Mt. CB Design Criteria 2021); If the re-roof project affects 25% or more of the structure, the ENTIRE roof must meet Colorado Wildfire Resiliency Code requirements: Class A roofing materials, minimum 26-gauge metal roof valleys, noncombustible gutters/downspouts, noncombustible corrosion-resistant vent mesh with 1/8-inch maximum openings; Roofing is explicitly listed as one of the design-review application types that 'does not require drawings/engineering' under the Town's own Design Review Fees schedule, carrying a lower flat design-review fee than projects requiring drawings; Contractor must hold a current Mt. CB Business License (BOLF). If your project isn't listed, confirm with Town of Mt. Crested Butte Community Development Department (Building Division) at (970) 349-6632, ext. 5 (Community Development Department) before starting work.

In Mount Crested Butte, the published Design Review Fee — application not requiring drawings/engineering (e.g., roofing, mechanical) is: $100.00. Additional published fees: Building Permit Fee (valuation-based, same schedule as new construction) — $23.50 minimum, scaling per Town Code Sec. 6-52 / Table R1-A; Plan Check Fee — 65% of the Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Mount Crested Butte does not publish a plan-review timeline for this permit. Contact Town of Mt. Crested Butte Community Development Department (Building Division) at (970) 349-6632, ext. 5 (Community Development Department) for current turnaround.

You'll need: Building Permit Application — Roofing scope; Design Review Application (no-drawings track); Mt. CB Business License (BOLF). See the required-documents checklist on this page for details on each.

Mount Crested Butte requires 2 inspection(s) for a roofing permit (re-roof), in order: Underlayment and Flashing Inspection, Final Inspection. Schedule each through Town of Mt. Crested Butte Community Development Department (Building Division) ((970) 349-6632, ext. 5 (Community Development Department)).

Apply through Town of Mt. Crested Butte Community Development Department (Building Division) at 911 Gothic Rd., PO Box 5800, Mt. Crested Butte, CO 81225. Phone: (970) 349-6632, ext. 5 (Community Development Department), email: mnevinslavtar@mtcb.colorado.gov (Community Development Director). Office hours: Community Development Department Staff (per mtcb.colorado.gov/departments-services/community-development): Maeve Nevins-Lavtar, Community Development Director, ext. 117, mnevinslavtar@mtcb.colorado.gov. Shannon Hessler, Planner II, ext. 119, shessler@mtcb.colorado.gov. Todd Carroll, Community Development Coordinator, ext. 120, tcarroll@mtcb.colorado.gov. Leah Desposato, Community Development Coordinator, ext. 105, ldesposato@mtcb.colorado.gov. Building permit and design-review applications are submitted online via the Town's GovWell portal (app.govwell.com/mtcb).. Official information: https://mtcb.colorado.gov/building.

Mount Crested Butte, Colorado has adopted: 2021 International Building Code (IBC) — Town Code Chapter 6, Article II, adopted by Ordinance No. 6, Series 2024, in effect as of January 3, 2025, pursuant to Title 31, Article 16, Part 2, C.R.S.; 2021 International Residential Code (IRC) — Town Code Chapter 6, Article III, with local amendments including Table R301.2 climatic design criteria (Sec. 6-32, a 155 psf ground snow load) and a modified automatic fire sprinkler requirement (Sec. 6-59); 2021 International Existing Building Code (IEBC) — referenced in the Town's Adopted Codes list on mtcb.colorado.gov/building; 2021 International Mechanical Code (IMC) — Town Code Chapter 6, Article IV (Sec. 6-73 through 6-75), with a local flat-fee Table 1-AM mechanical permit fee schedule; 2021 International Fuel Gas Code (IFGC) — adopted per the Town's Adopted Codes list; the State of Colorado is responsible for reviewing and inspecting plumbing rather than the Town; 2021 International Fire Code (IFC) — Town Code Chapter 8, Article I, enforced through the Crested Butte Fire Protection District (CBFPD), which performs all fire alarm/suppression/sprinkler inspections rather than the Town Building Division; 2021 International Property Maintenance Code — per the Town's Adopted Codes list; 2021 International Energy Conservation Code (IECC) — per the Town's Adopted Codes list; Colorado Model Electric Ready and Solar Ready Code — Town Code Chapter 6, Article X (Sec. 6-141 et seq.), adopted by Ordinance No. 6, Series 2024, in effect as of January 3, 2025; applies to new one- and two-family dwellings and townhouses (residential buildings are exempted from certain waiver provisions per Section 101.4.1/102.1); 2025 Colorado Wildfire Resiliency Code (WRC) — per the Town's own 'Colorado Wildfire Resiliency Code' link and 'WRC Standards Summarized' summary sheet published on mtcb.colorado.gov/building; National Electrical Code and International Plumbing Code — the Town's own Adopted Codes page states: 'The State of Colorado is responsible for reviewing and inspecting electrical and plumbing. Please contact the State of Colorado to determine the following code editions: National Electrical Code, International Plumbing Code' — Mt. Crested Butte does not itself adopt/administer these trade codes; Full Town Code Chapter 6 (Buildings and Building Regulations) and Chapter 8 (Fire Prevention and Protection) text and Ordinance No. 6, Series 2024 hosted at mtcb.colorado.gov and mirrored on ecode360.com/MT4975 and qcode.us/codes/mtcrestedbutte. Local amendments apply — see the Mount Crested Butte overview page for the full list.

Yes, if the re-roofing project affects 25% or more of the structure, per the Town's own WRC Standards Summary — the entire roof must then meet Class A roofing, 26-gauge minimum metal valley flashing, and noncombustible gutter/vent-mesh requirements.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mount Crested Butte building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare roofing permit (re-roof) fees across Colorado

Look up this fee in a different city →

Embed this data card →

Related guides

Now live

Build your Mount Crested Butte project checklist

Describe your project once and get every permit, document, and fee it triggers in Mount Crested Butte — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →