Craig building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Craig, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
Craig City Hall, 300 W 4th Street, Craig, CO 81625
Phone
970-826-2013
Office hours
Monday-Friday 8:00 am-5:00 pm. Building Official: Marlin Eckhoff (Office 970-826-2013, Cell 970-326-3645, meckhoff@ci.craig.co.us). Building Administrator: Sierra Arellano (970-826-2024, sarellano@ci.craig.co.us) handles contractor licensing/registration. The department is located upstairs within Craig City Hall, in the Community Development Department. Verified identically on both the City of Craig's and Moffat County's own department pages.

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Setbacks / Footings

  2. 2

    Foundation Wall / Damp-proofing / Foundation Drainage

  3. 3

    Framing

    May only be performed after electrical, mechanical, and plumbing rough-in inspections (electrical rough-in performed by the State inspector)

  4. 4

    Roofing / Siding / Insulation / Sheetrock

  5. 5

    Final / Certificate of Occupancy

    May only be performed after or simultaneously with electrical (State), mechanical, and plumbing final inspections

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork, rough openings for supply/return, machinery installation and structural support, piping within walls

  2. 2

    Combustion Air / Return Air / Appliance Vent-Chimney

  3. 3

    Gas Piping

  4. 4

    Final Inspection

Applies to: Plumbing Permit

  1. 1

    Underground (Service Line Connections)

  2. 2

    Rough-In / Top Out

    Concealed piping under slabs and within walls; includes pressure test of DWV & water distribution piping

  3. 3

    Fixtures / Water Heaters / Backflow Preventer

  4. 4

    Gas Piping

Applies to: Residential Addition / Remodel Permit

  1. 1

    Footings / Foundation

  2. 2

    Framing

    After electrical (State), mechanical, and plumbing rough-ins

  3. 3

    Final / Certificate of Occupancy

Applies to: Solar Permit (Photovoltaic)

  1. 1

    Rough Inspection (Structural/Racking)

    Performed by the local Building Department

  2. 2

    Rough & Final Electrical Inspection

    Performed by a State of Colorado DORA inspector, not the local department

  3. 3

    Final Building Inspection

Applies to: Electrical Permit (State-Administered)

  1. 1

    Rough Electrical (State Inspector)

  2. 2

    Final Electrical (State Inspector)

Applies to: Roofing Permit (Re-Roof)

  1. 1

    Pre-Roof Inspection

    For re-roofing projects specifically, before work begins

  2. 2

    Roofing / Final Inspection

Craig building permits

Get alerts for Craig

We'll email you when Craig's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.