Craig building inspections
Inspection sequence, scheduling, and re-inspection fees for building permits in Craig, Colorado.
Reviewed 2026-08-13 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Craig City Hall, 300 W 4th Street, Craig, CO 81625
- Phone
- 970-826-2013
- Office hours
- Monday-Friday 8:00 am-5:00 pm. Building Official: Marlin Eckhoff (Office 970-826-2013, Cell 970-326-3645, meckhoff@ci.craig.co.us). Building Administrator: Sierra Arellano (970-826-2024, sarellano@ci.craig.co.us) handles contractor licensing/registration. The department is located upstairs within Craig City Hall, in the Community Development Department. Verified identically on both the City of Craig's and Moffat County's own department pages.
- Website
- Official site
Published scheduling rules
- Fire sprinkler and fire alarm system installations are reviewed and inspected as part of the standard Building Permit process by the Craig/Moffat County Regional Building Department, NOT by a dedicated fire-marshal or fire-prevention office -- the department's own Checklists for Obtaining Permits & Scheduling Inspections PDF lists 'Fire Protection / Suppression System / Fire-Smoke Alarms/Detectors' under its own 'Public Safety' inspection category (Fire Sprinkler / Fire Alarm System Permit)
Inspection sequence
Applies to: Commercial Building Permit (New Structure)
- 1
Setbacks / Footings
- 2
Slab-Floor / Foundation Wall / Damp-proofing & Foundation Drainage
- 3
Sheathing (roof & walls) / Framing
Framing may only be performed after electrical, mechanical, and plumbing rough-in inspections (electrical rough-in performed by the State inspector)
- 4
Roofing / Siding / Insulation / Sheetrock-Plaster
- 5
Public Safety
Egress & Lighting; Fire Protection / Suppression System / Fire-Smoke Alarms & Detectors; Maximum Occupancy Load Posted — listed on the department's own Standard Building Inspections record and most relevant to commercial occupancies
- 6
Final / Certificate of Occupancy
May only be performed after or simultaneously with electrical (State), mechanical, and plumbing final inspections; a Temporary Certificate of Occupancy is also listed as an available inspection step
Applies to: Residential Building Permit (New Construction)
- 1
Setbacks / Footings
- 2
Foundation Wall / Damp-proofing / Foundation Drainage
- 3
Framing
May only be performed after electrical, mechanical, and plumbing rough-in inspections (electrical rough-in performed by the State inspector)
- 4
Roofing / Siding / Insulation / Sheetrock
- 5
Final / Certificate of Occupancy
May only be performed after or simultaneously with electrical (State), mechanical, and plumbing final inspections
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork, rough openings for supply/return, machinery installation and structural support, piping within walls
- 2
Combustion Air / Return Air / Appliance Vent-Chimney
- 3
Gas Piping
- 4
Final Inspection
Applies to: Plumbing Permit
- 1
Underground (Service Line Connections)
- 2
Rough-In / Top Out
Concealed piping under slabs and within walls; includes pressure test of DWV & water distribution piping
- 3
Fixtures / Water Heaters / Backflow Preventer
- 4
Gas Piping
Applies to: Residential Addition / Remodel Permit
- 1
Footings / Foundation
- 2
Framing
After electrical (State), mechanical, and plumbing rough-ins
- 3
Final / Certificate of Occupancy
Applies to: Solar Permit (Photovoltaic)
- 1
Rough Inspection (Structural/Racking)
Performed by the local Building Department
- 2
Rough & Final Electrical Inspection
Performed by a State of Colorado DORA inspector, not the local department
- 3
Final Building Inspection
Applies to: Electrical Permit (State-Administered)
- 1
Rough Electrical (State Inspector)
- 2
Final Electrical (State Inspector)
Applies to: Roofing Permit (Re-Roof)
- 1
Pre-Roof Inspection
For re-roofing projects specifically, before work begins
- 2
Roofing / Final Inspection
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-13.
Fee schedules
Checklists & handouts
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Craig building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Craig building permits
Get alerts for Craig
We'll email you when Craig's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.