Electric Vehicle Charging Station Permit (State-Administered) — Craig, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.ci.craig.co.us/departments/building.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle Charging Station Permit (State-Administered) in Craig, Colorado
Installing an EV charger/EVSE in Craig or unincorporated Moffat County is electrical work, and both the City and County defer ALL electrical permits, plan reviews, and inspections to the State of Colorado -- the same state-administered pathway documented in this file's electrical-permit entry. No Craig/Moffat County EV-charger-specific permit application, fee line, or webpage was found -- checked the City's Permits & Inspections page, Adopted Codes page, Residential Solar Installation Checklist, and the Checklists for Obtaining Permits & Scheduling Inspections PDF directly; none name electric vehicle charging stations, EV chargers, or EVSE.
Verified 2026-07-20 · Source
When you need this permit
- Both the City of Craig and Moffat County defer ALL electrical permits, plan reviews, and inspections to the Colorado Department of Regulatory Agencies (DORA), Division of Professions and Occupations, State Electrical Board -- the same mechanism documented for all other electrical work in this file
- Applicants must apply directly to DORA, typically through the DPO Online Permitting System, rather than through the Craig/Moffat County Regional Building Department
- If the charger installation is mounted to or requires a new structure (e.g., a new carport), a separate local Building Permit ($100 flat fee) from the Craig/Moffat County Regional Building Department would additionally apply for that structural portion
- Rough and Final Electrical inspections are performed by a State inspector, not a local building inspector, consistent with the department's Standard Building Inspections checklist
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Electrical (State Inspector)
Conducted by a DORA state electrical inspector, not the local Building Department
See the full Craig inspection guide — scheduling & re-inspection fees →
Tips
- Do not contact the Craig/Moffat County Regional Building Department for an EV charger permit -- like all electrical work, it is handled entirely by the Colorado Division of Professions and Occupations, State Electrical Board (DORA).
- If your EV charger installation also involves new construction (e.g., a carport), budget for a separate $100 flat local Building Permit for that structural portion, in addition to the state electrical permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Craig building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Craig
Electric Vehicle Charging Station Permit (State-Administered) in other cities
Compare electric vehicle charging station permit (state-administered) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Craig project checklist
Describe your project once and get every permit, document, and fee it triggers in Craig — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →