Mechanical / HVAC Permit — Craig, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://cms3.revize.com/revize/craigco/Document%20Center/Department/Building/Checklists%20for%20Obtaining%20Permits%20&%20Scheduling%20Inspections.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in Craig, Colorado
Required for HVAC/mechanical renovation, major repairs, piping system extension, and appliance replacement (including A/C unit or evaporative cooler installation/replacement) not performed under a Building Permit. Governed by the jointly-adopted 2018 IMC/IFGC.
Verified 2026-07-06 · Source
When you need this permit
- Location/address, property owner contact info, and name of performing contractor required at application
- Residential property owners may obtain permits and perform HVAC/mechanical work on their own occupied residence
- Floor plan and accurate description of scope required (e.g., 'install direct-vent gas fireplace and connect to existing gas piping system')
- Gas piping and combustion air/venting must comply with IMC/IFGC or manufacturer installation instructions
- Contractors must hold applicable City of Craig or Moffat County licensing depending on jurisdiction
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Ductwork, rough openings for supply/return, machinery installation and structural support, piping within walls
- 2
Combustion Air / Return Air / Appliance Vent-Chimney
- 3
Gas Piping
- 4
Final Inspection
See the full Craig inspection guide — scheduling & re-inspection fees →
Tips
- A/C unit and evaporative cooler installation or replacement follow the same general mechanical-permit requirements per the department's own checklist — no separate permit category exists for cooling equipment specifically.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Craig building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Craig
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Craig project checklist
Describe your project once and get every permit, document, and fee it triggers in Craig — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →