Change of Use / Change of Occupancy Permit — Craig, Colorado · Requirements sheet
Reviewed 2026-08-13 · Source: https://www.ci.craig.co.us/Document%20Center/Department/Building/Title%2016%20application%20forms/land_use_app.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy Permit in Craig, Colorado
Unlike Cortez in this corpus, whose standard Building Permit Application has an explicit 'Change of Occupancy' project-type checkbox, the City of Craig's master Land Use Application form -- described on its own face as 'the master land use form for the City of Craig' -- lists no Change of Use or Change of Occupancy option among its circle-one application types (Administrative Subdivision, Annexation, Conditional Use, Major/Minor Subdivision, Planned Development Overlay, Rezoning, RV Park, Sign Permit, Site Plan, Temporary Use, Variance or Appeal, Waiver, or an open 'Other' field) -- confirmed directly from the form. A change of use/occupancy is governed by the jointly-adopted 2018 International Existing Building Code (IEBC), Chapter 10 (Change of Occupancy), per this file's codesAdopted list, and by Craig Municipal Code Title 16 zoning provisions where the new use requires a Conditional Use Permit; absent a dedicated application or checklist, it is processed either as a Conditional Use filing (if the new use is not permitted-by-right in the applicable zoning district) or folded into whichever Building Permit track matches the project's physical construction scope, with the Land Use Application's own Existing Use / Proposed Use fields capturing the change regardless of which box is checked.
Reviewed 2026-08-13 · Source
When you need this permit
- No dedicated 'Change of Use' or 'Change of Occupancy' checkbox exists on the City's master Land Use Application form -- confirmed directly; the form's circle-one application types are limited to Administrative Subdivision, Annexation, Conditional Use, Major/Minor Subdivision, Planned Development Overlay, Rezoning, RV Park, Sign Permit, Site Plan, Temporary Use, Variance or Appeal, Waiver, and an open 'Other' field
- Governed by the jointly-adopted 2018 IEBC, Chapter 10 (Change of Occupancy), per this file's codesAdopted list -- no local amendment to this specific chapter was found published on the City's Adopted Codes or Building & Construction Codes pages
- The Land Use Application's Property Description section (Section 4) requires stating both Existing Zoning/Existing Use and Proposed Zoning/Proposed Use regardless of which application-type box is checked -- so a pure use change is captured on the form even without a dedicated checkbox, most likely via the 'Other' field or a 'Site Plan' filing depending on scope
- If the new use is not permitted-by-right in the applicable zoning district, a Conditional Use Permit application is the City's general mechanism -- requires a $200.00 application fee (Land Use Fee Schedule), a completed Land Use Application marked for Conditional Use, a title commitment or proof of ownership, a written statement addressing the review criteria in Craig Municipal Code Sec. 16.03.050(C), a 24-inch by 36-inch site development map, preliminary building plans/elevations, and a current list of surrounding property owners within 150 feet -- and culminates in a public hearing before City Council with published/mailed/posted notice
- If the change of use also involves construction, remodeling, or modification of the structure, the applicable Minor or Major Additions/Modifications/Repairs/Remodeling Building Permit checklist governs (documented in this file's residential-addition-remodel entry), including the same document tiers and $100 flat building-permit fee
- A Certificate of Occupancy is required before moving into a business, per Moffat County's own Building Permit Information page -- basic requirements include a complete and approved electrical system, a functional bathroom and kitchen sink with hot/cold running water, approved sewage disposal, functional heating, no hazardous conditions, and the address posted conspicuously
- All commercial work requires a properly licensed contractor; the owner-self-perform allowance applies only to one- and two-family dwellings intended as the owner's actual primary residence Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Certificate of Occupancy Inspection
Per Moffat County's own published basic Certificate of Occupancy requirements: complete/approved electrical system, functional bathroom and kitchen sink with hot/cold water, approved sewage disposal, functional heating, no hazardous conditions, and address posted conspicuously
See the full Craig inspection guide — scheduling & re-inspection fees →
Tips
- Unlike Cortez, Craig has no dedicated Change-of-Occupancy checkbox on any published application -- don't expect a single standardized form. Confirm with the Building Official (Marlin Eckhoff, 970-826-2013) or Building Administrator (Sierra Arellano, 970-826-2024) which specific application track (Conditional Use, Building Permit, or the Land Use Application's 'Other' field) fits your situation before filing.
- Budget for the $200.00 Conditional Use fee AND a public City Council hearing (with mailed notice to property owners within 150 feet) if your new use is not allowed by right in the applicable zoning district -- this is a meaningfully slower path than a simple administrative filing.
- If your use change is purely administrative (no rezoning need, no construction), the fee treatment is genuinely unresolved in published materials -- don't assume it's free just because no fee line is published; confirm with staff before proceeding.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Craig building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Craig
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Craig project checklist
Describe your project once and get every permit, document, and fee it triggers in Craig — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →