Holyoke Municipal Code Sec. 15.16.010 adopts the International Fire Code, 2018 edition, by reference as the 'City of Holyoke Fire Code,' expressly 'providing for the issuance of permits and collection of fees therefor' — this is the governing code for fire sprinkler and fire alarm systems (IFC Chapter 1, Section 105.7 requires a construction permit for most fire-protection-system installations). Fire suppression response is provided by the Holyoke Volunteer Fire Department (HVFD, 407 E. Denver Street, 970-854-2266), which also operates within the Holyoke Fire Protection District special-district structure covering rural Phillips County. No dedicated online fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure distinct from the general Building Permit process was located on the City's website as of the last verification; no separate Fire Marshal contact distinct from HVFD/the Building Department was identified either.

Verified 2026-08-14 · Source

When you need this permit

  • Governed by Holyoke Municipal Code Sec. 15.16.010 (International Fire Code, 2018 edition, adopted as the City of Holyoke Fire Code), which provides for issuance of permits and collection of fees for fire-code-regulated work, including fire protection systems
  • No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure distinct from the general Building Permit process was located on the City's website as of the last verification
  • No separate Fire Marshal contact distinct from the Holyoke Volunteer Fire Department (HVFD) / City Building Department is identified in the Town's published materials
  • Contact the City Building Department (970-854-2266) or HVFD (same building/phone, 407 E. Denver Street) to confirm current submittal requirements for a specific fire sprinkler or alarm project

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet — 0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Fire Sprinkler/Alarm Plan Review & Permit FeeMunicipal Code Sec. 15.16.010 confirms the IFC 'provides for the issuance of permits and collection of fees therefor,' but no dollar figure or fee-schedule document is published online. Contact the Building Department (970-854-2266) for a current fee quote.
Not published on the City's website as of the last verification

Review timeline

Plan review
Not published — contact the department

How long did your Fire Sprinkler / Fire Alarm System Permit permit actually take in Holyoke?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Holyoke inspection guide — scheduling & re-inspection fees →

    Tips

    • Holyoke's fire code (IFC 2018, Municipal Code Sec. 15.16.010) is administered alongside the general Building Permit process rather than through a separate online fire-permit portal — the City has no dedicated Fire Marshal contact distinct from the Holyoke Volunteer Fire Department (same address/phone as the Building Department, 407 E. Denver Street, 970-854-2266). Call ahead rather than expecting a self-service application.

    Frequently asked questions

    Holyoke requires a fire sprinkler / fire alarm system permit for: Governed by Holyoke Municipal Code Sec. 15.16.010 (International Fire Code, 2018 edition, adopted as the City of Holyoke Fire Code), which provides for issuance of permits and collection of fees for fire-code-regulated work, including fire protection systems; No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure distinct from the general Building Permit process was located on the City's website as of the last verification; No separate Fire Marshal contact distinct from the Holyoke Volunteer Fire Department (HVFD) / City Building Department is identified in the Town's published materials; Contact the City Building Department (970-854-2266) or HVFD (same building/phone, 407 E. Denver Street) to confirm current submittal requirements for a specific fire sprinkler or alarm project. If your project isn't listed, confirm with City of Holyoke Building Department at 970-854-2266 before starting work.

    In Holyoke, the published Fire Sprinkler/Alarm Plan Review & Permit Fee is: Not published on the City's website as of the last verification. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Holyoke does not publish a plan-review timeline for this permit. Contact City of Holyoke Building Department at 970-854-2266 for current turnaround.

    You'll need: Fire Sprinkler/Alarm System Plans. See the required-documents checklist on this page for details on each.

    Apply through City of Holyoke Building Department at 407 E. Denver Street, Holyoke, CO 80734. Phone: 970-854-2266, email: contactus@cityofholyoke-co.gov. Office hours: City offices Monday-Friday 8:00 AM to 5:00 PM (closed weekends), per the City of Holyoke Forms & Documents page. No separate Building Department-specific hours or direct phone/email distinct from the main city line (970-854-2266 / contactus@cityofholyoke-co.gov) were found published anywhere on the city's site as of the last verification; the Building Department does not have its own dedicated staff-listing or contact page distinct from the city's general Forms & Documents / Business Office pages.. Official information: https://www.cityofholyoke-co.gov/departments/forms_documents.php.

    Holyoke, Colorado has adopted: Watch for a same-name collision when searching: https://www.holyoke.org/departments/building/ is the City of Holyoke, MASSACHUSETTS Building Department (413-322-5600, City Hall Annex Room 300, buildcon@holyoke.org), a completely different municipality. The City of Holyoke, COLORADO -- Phillips County, 407 E. Denver Street, 970-854-2266 -- publishes at https://www.cityofholyoke-co.gov. Everything in this record comes from cityofholyoke-co.gov and its linked documents, plus Colorado statewide electrical and plumbing jurisdiction rules; nothing comes from the Massachusetts site.; The Holyoke Municipal Code is published on Municode (library.municode.com/co/holyoke). Title 15 - BUILDINGS AND CONSTRUCTION is codified as Supplement 2, 'Online content updated on December 13, 2024,' 'Codified through Ordinance No. 1-2024, enacted September 17, 2024.' Holyoke has adopted, by reference, as its own local code (each chapter states a certified copy is on file with the city clerk): International Building Code, 2018 edition, incl. appendices C/E/I/J (Sec. 15.04.010); International Residential Code, 2018 edition (Sec. 15.08.010); International Mechanical Code, 2018 edition, incl. appendix A (Sec. 15.12.010); International Fire Code, 2018 edition, incl. appendices B/C/D/I (Sec. 15.16.010); International Energy Conservation Code, 2018 edition (Sec. 15.20.010); International Existing Building Code, 2018 edition (Sec. 15.22.010); 'the most recent edition of the Colorado Plumbing Code as adopted by the state plumbing board' as the city's own Plumbing Code, no fixed year — it floats to whatever edition the state plumbing board currently has in effect (Sec. 15.24.010); and the National Electrical Code, 2017 edition, 'as adopted by the state' (Sec. 15.26.010). Quoted directly from the Municode text.; Local modifications on file: IBC 2018 Sec. 101.1 retitled 'Building Code of the City of Holyoke'; Sec. 103 deleted; Sec. 105.2 (Work Exempt from Permit) amended so 'fences not over six feet, three inches high' and 'retaining walls...not over four feet' are REMOVED from the exempt list (i.e., these now DO require a permit; see chapter 17.28 for fencing). IRC 2018 Sec. 101.1 retitled 'Residential Code of the City of Holyoke'; Sec. 104.10.1 (Flood Hazard Areas) deleted; Sec. 105.2 amended — exempt from permit: one-story detached accessory structures ≤120 sq ft; and 'decks not exceeding 120 square feet in area, that are not more than 18 inches above grade at any point, are not attached to a dwelling and do not serve the exit door required by section R311.4'; also exempt: like-for-like window/door replacement with no framing change; Sec. R313 (Automatic Fire Sprinkler Systems) deleted; Sec. N1102.4.1.2 (Testing) deleted. IMC 2018 Sec. 106.2 amended to exempt like-for-like category-one furnace/water-heater and A/C replacement (R-3 occupancies, prior install permitted/inspected/approved) from a new permit, and adds 'Sec. 106.5.2 Fee schedule. Fees for any permit, plan review or inspection required by this code shall be established from time to time by resolution of the city council' (confirms the fee-setting mechanism — a standalone council resolution, not a codified table — while the dollar figures themselves remain unpublished online; see the fee-schedule note below). IFC 2018 and IECC 2018 each retitled to the City of Holyoke's name in Sec. 101.1/C101.1 with no other substantive local modification noted.; HB22-1362 (Colorado's statewide low-energy/carbon code requirement) and its predecessor HB19-1260 both operate on a 'when a jurisdiction updates its building code, the energy code update must accompany it' trigger — neither is a blanket mandate independent of a local update, and neither contains a population-based exemption threshold. The IECC edition currently on Holyoke's books is 2018 (not a newer low-energy cycle), but exactly when Title 15's ICC chapters were last substantively enacted or updated cannot be established from the published code: none of the Sec. 15.04.010 through 15.26.010 adoption sections carries an inline '(Ord. No. ___, ____)' legislative-history citation in the Municode text (unlike, e.g., the Mobile Home chapter at Sec. 15.28.010, which cites 'Ord. No. 5-1975'), and the code's front-matter 'codified through Ordinance No. 1-2024' banner reflects the single most-recent ordinance affecting ANY part of the whole Municipal Code, not necessarily Title 15 specifically. Whether HB22-1362 currently binds Holyoke therefore remains genuinely unresolved — recorded as such, not assumed either way — though whatever cycle IS in force is the 2018 ICC family.; Holyoke Municipal Code Title 15 contains the City's OWN codified Electrical Code chapter (Sec. 15.26.010, adopting NEC 2017 'as adopted by the state,' expressly 'to provide for the issuance of permits and collection of fees therefor') and Plumbing Code chapter (Sec. 15.24.010, adopting by reference the state plumbing board's current Colorado Plumbing Code 'as the plumbing code of the CITY... providing for the issuance of permits and collection of fees therefor'). Both are codified as the City's own local ordinances under Title 15 - Buildings and Construction (footnoted to C.R.S. § 31-15-601 et seq., municipal building/fire-regulation power, and C.R.S. § 31-16-202, authority to adopt codes by reference) — not merely descriptive cross-references to a separate state process. This corroborates, on a primary legal source, the City's own Forms & Documents page listing 'wiring' and 'plumbing' among its administered Building Department permit types, and as a home-rule municipality Holyoke has independent authority to run its own electrical/plumbing permitting program regardless of whether DORA's 'no state inspections in these counties' list includes Phillips County — that DORA list concerns default authority over unincorporated county land, not an incorporated home-rule city's own adopted code. Electrical and plumbing permits in Holyoke are therefore City-issued (City of Holyoke Building Department), under Secs. 15.26.010 and 15.24.010 respectively — not State of Colorado (DORA) issued. The ordinance text does not address whether the City's own staff performs the physical inspections in-house or engages a state-certified/contract inspector — that operational detail remains unconfirmed.; The fee-setting mechanism is confirmed by primary ordinance text even though the dollar figures are unpublished online: IMC Sec. 106.5.2 ('Fees...shall be established from time to time by resolution of the city council'); Zoning Sec. 17.44.050, Building permit—Fee ('A fee for the examination and administration of a building permit shall be payable to the city upon receipt of the application. The fee shall be as set from time to time by action of the city council and set out in the fee schedule.'); and the Mobile Home Regulations chapter, which repeatedly references applicants paying 'a fee in an amount set out in the consolidated fee schedule' (Secs. 15.28.040, 15.28.090). All three confirm Holyoke fees are set by a standalone CITY COUNCIL RESOLUTION establishing a 'consolidated fee schedule' — a document that is NOT part of the codified ordinances Municode publishes and is not located anywhere online: the city's city_council.php and city_clerk.php pages post no agendas, minutes or resolutions; the only fee document on the cityofholyoke-co.gov domain is an unrelated 'Records Request Fees Schedule.pdf' (a CORA records-request fee document, not a building-permit fee schedule); and a web search for 'City of Holyoke Colorado fee schedule resolution building permit' returns only the wrong-jurisdiction holyoke.org Massachusetts site plus unrelated other-Colorado-jurisdiction fee schedules. The consolidated fee schedule exists as a real governing document adopted by council resolution, but its actual dollar figures are not recoverable from public online sources.. Local amendments apply — see the Holyoke overview page for the full list.

    The City of Holyoke has adopted the 2018 International Fire Code as its own Fire Code (Municipal Code Sec. 15.16.010), which provides for permit issuance and fee collection, but no dedicated online application or fee schedule for fire sprinkler/alarm systems was located. Contact the City Building Department / Holyoke Volunteer Fire Department at 970-854-2266 (407 E. Denver Street) to confirm current requirements.

    Sources & verification

    Verified against official sources. Last reviewed 2026-08-14.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holyoke building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Property Access

    Holyoke's permit history is searchable by address

    1,605 permits in our copy of Holyoke's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Holyoke has issued.

    1,526 of these 1,607 permits — 95% — carry an issued date, and those run from 2015 to 2026. The remaining 81 have no date at all.

    96% of Holyoke's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.

    Get Property AccessFree with a signed-in account · the guide above stays free