EV Charger / EVSE Permit — Holyoke, Colorado · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.cityofholyoke-co.gov/departments/forms_documents.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Holyoke, Colorado
Holyoke has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. As with every other permit type in this file, the City of Holyoke Building Department publishes no fee schedule (valuation table, flat rate, or square-footage rate) online -- an EV charger installation would use the same general Building Permit Application used for other construction, with the fee block filled in by city staff at issuance rather than computed from a public rate table. Colorado's HB24-1173 (2024), which mandates expedited/standardized EV-charger permitting, applies only to counties of 20,000+ and municipalities of 10,000+ population -- Holyoke (population roughly 2,000) falls well below that threshold and is not a covered municipality under the statute.
Reviewed 2026-07-20 · Source
When you need this permit
- Completed City of Holyoke Building Permit Application, same general form used for other construction, describing the EV charger installation's scope, materials cost, and labor cost
- RESOLVED 2026-07-23: electrical permit authority in Holyoke is City-issued, not State-issued -- Holyoke Municipal Code §15.26.010 codifies the City's OWN Electrical Code (NEC 2017), expressly providing for city issuance of permits and city collection of fees, corroborating the Forms & Documents page's listing of 'wiring' among city-administered permit types; the charger circuit is therefore inspected under the City's own code, not the Colorado State Electrical Board
- Holyoke does not meet the 10,000-population municipality threshold that triggers Colorado HB24-1173's mandatory model-code/expedited-review requirement for EV charger permits, so that statute does not apply here
- Same 180-day permit expiration clause applies as with any other Holyoke building permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Electrical
Charger circuit and disconnect verified; per Holyoke Municipal Code §15.26.010 (confirmed 2026-07-23), performed by the City of Holyoke Building Department under its own Electrical Code (NEC 2017), not the Colorado State Electrical Board
See the full Holyoke inspection guide — scheduling & re-inspection fees →
Tips
- Holyoke publishes no fee schedule for any permit type, including EV chargers -- call ahead (970-854-2266) for a fee estimate.
- RESOLVED 2026-07-23: the City of Holyoke's own Building Department inspects an EV charger circuit under its own codified Electrical Code (NEC 2017, §15.26.010), not the Colorado State Electrical Board (DORA) -- the prior unresolved city-vs-DORA hedge, and the DORA-fee-cap-multiplier analysis below that depended on it, are both superseded by this finding, though the underlying dollar figure is still not published (see next note).
- Colorado's HB24-1173 requires expedited, standardized EV-charger permitting only in counties of 20,000+ and municipalities of 10,000+ population -- Holyoke does not meet that threshold, so this statutory mandate does not apply here.
- Re-chased 2026-07-20: if the Colorado State Electrical Board (DORA) turns out to be the actual issuing authority (Phillips County is not on DORA's published list of counties with a local electrical-inspection program), state law (C.R.S. Title 12, electrical inspections article) caps local electrical fees at 1.15x the state's own fee schedule -- but the only version of that state fee schedule locatable (an archived table hosted by another Colorado municipality, not DORA itself) is dated 'New State of Colorado Fees as of April 1, 2016.' Since the governing statute requires the fee schedule be re-established annually, a 9-year-old third-party-hosted copy cannot be treated as the current governing figure, and DORA's own fee-schedule pages return HTTP 403 to automated fetches. NOTE (2026-07-23): this DORA-multiplier avenue is now understood to be moot for Holyoke specifically, since the City -- not DORA -- is the confirmed issuing authority (Municode §15.26.010); the 1.15x-state-schedule cap would only be relevant if DORA issued the permit.
- RE-CHASE 2026-07-23 (dollar figure remains OPEN despite new avenues): the fee-setting MECHANISM is now confirmed via primary ordinance text -- Holyoke Municipal Code §17.44.050 states the fee 'shall be as set from time to time by action of the city council and set out in the [consolidated] fee schedule,' i.e. a standalone council resolution, not a codified table. That resolution document itself was NOT found published online after checking the live city_council.php and city_clerk.php pages (no agendas/minutes/resolutions posted), running a full Wayback Machine CDX index of the entire cityofholyoke-co.gov domain (562 archived URLs, filtered for fee/resolution/schedule/budget/council/minutes/agenda -- only an unrelated CORA 'Records Request Fees Schedule.pdf' turned up), and a fresh web search. No citable governing dollar figure for EV charger permits exists after this exhaustive chase; confidence stays partial pending direct confirmation from the Building Department (970-854-2266).
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holyoke building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Holyoke
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Holyoke project checklist
Describe your project once and get every permit, document, and fee it triggers in Holyoke — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →