Residential Building Permit (New Construction) in Holyoke, Colorado
Required for new single-family residential construction within Holyoke city limits, issued by the City of Holyoke Building Department using its general Building Permit Application. RESOLVED 2026-07-23: the city has adopted the International Building Code, 2018 edition and International Residential Code, 2018 edition by reference as its own local code (Holyoke Municipal Code §§15.04.010, 15.08.010, current Supplement 2, Dec. 13, 2024), so review is against a specific, citable current-cycle code adoption, not merely the generic 2003-era Colorado Chapter ICC 'Building Guide' templates (which remain useful submittal aids but are not the code of record).
Verified 2026-07-23 · Source
When you need this permit
- Completed City of Holyoke Building Permit Application, including owner, contractor, and (if applicable) architect information
- Class of Work (New/Addition/Alteration/Repair/Move/Demo) and Type of Work (Residential/Commercial) specified on the application
- Building dimensions (width x length, total square feet), number of stories, and whether plans are available must be indicated
- Flood Plain Area status must be disclosed on the application (Yes/No checkbox)
- Material Cost, Labor Cost, and Total Cost must be disclosed for permit fee and use tax calculation
- For a genuinely new residence, standalone electrical/plumbing/mechanical permits are not required separately per the application's notice text (they may be covered under the umbrella building permit); this exception does NOT apply to additions, alterations, or repairs
- Permit becomes null and void if work is not commenced within 180 days of issuance, or is suspended/abandoned for 180 days after commencement
- Governing code is IBC 2018 / IRC 2018 as locally modified: IBC §101.1 retitled 'Building Code of the City of Holyoke,' §103 deleted, and §105.2 amended so that fences over 6'3" and retaining walls over 4' are NOT exempt from permit (Holyoke Municipal Code §15.04.020)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Prior to concrete pour; the city's Colorado Chapter ICC Addition Building Guide documents a minimum 36-inch (or below frost/freeze depth) foundation requirement with #4 rebar reinforcement per IRC Table R404.1.1(2), though this guide is generic statewide template content, not confirmed Holyoke-specific code text
- 2
Framing / Rough-in
Structural framing and trade rough-ins prior to concealment
- 3
Final Inspection
Completed work verified against the approved permit application
See the full Holyoke inspection guide — scheduling & re-inspection fees →
Tips
- RESOLVED 2026-07-23: Holyoke's adopted code IS now identified — IBC 2018 and IRC 2018, per Holyoke Municipal Code §§15.04.010/15.08.010 (Municode, Supplement 2, current through Ord. No. 1-2024, Sept. 17, 2024). The city's Forms & Documents materials themselves still don't cite an edition, so this citation should be treated as the governing one going forward.
- For a genuinely NEW single-family residence, separate electrical/plumbing/mechanical permits are not required per the city's own application notice — but this exception does not extend to additions, alterations, remodels, or repairs, which DO require standalone trade permits.
- No fee schedule is published; budget uncertainty into project planning and call ahead for a fee estimate before submitting, since city staff calculate the Permit Fee and Use Tax manually at issuance from a council-resolution 'consolidated fee schedule' that is not published online (confirmed via Holyoke Municipal Code §17.44.050, checked 2026-07-23).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holyoke building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Holyoke
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Holyoke project checklist
Describe your project once and get every permit, document, and fee it triggers in Holyoke — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →