Mechanical / Sheet Metal (HVAC) Permit in Holyoke, Colorado
Required for heating, ventilating, and air conditioning equipment installation or replacement in Holyoke, referred to on the city's Forms & Documents page as a 'sheet metal' permit. There is no separate state deferral for mechanical/HVAC work (unlike electrical and plumbing, mechanical permitting in Colorado is not centralized through a DORA state board), so this permit type is issued by the City of Holyoke Building Department. The adopted mechanical code is the International Mechanical Code, 2018 edition (Holyoke Municipal Code §15.12.010).
Verified 2026-07-23 · Source
When you need this permit
- Completed City of Holyoke Building Permit Application with the mechanical/HVAC scope described
- Separate mechanical permit required except where the umbrella new-residence exception applies (new single-family construction only)
- Governing code CONFIRMED 2026-07-23: International Mechanical Code, 2018 edition, adopted by reference as the city's own Mechanical Code (Holyoke Municipal Code §15.12.010), including appendix A
- Per §15.12.020 local modification, exempt from a new mechanical permit: replacement/repair of a category-one furnace or water heater of the same BTU rating, and replacement/repair of A/C equipment of the same size/energy source/rating — both only in R-3 occupancies where the initial installation was permitted, inspected, and approved
- §15.12.020 adds §106.5.2: 'Fees for any permit, plan review or inspection required by this code shall be established from time to time by resolution of the city council' — i.e., a standalone council-resolution fee schedule governs, not a codified table
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Holyoke Municipal Code § 15.12.020, adding IMC § 106.5.2 — mechanical permit fees are set by a standalone city council resolution, the consolidated fee schedule, which the City does not publish online. Show full citationHide
Holyoke Municipal Code § 15.12.020, adding IMC § 106.5.2 — mechanical permit fees are set by a standalone city council resolution, the consolidated fee schedule, which the City does not publish online. Fees are calculated by city staff at issuance. § 106.5.3 as locally modified sets refunds at 50 percent for the relevant paragraphs, with refund requests due within 90 days of the fee payment date.Review timeline
Inspection process
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
See the full Holyoke inspection guide — scheduling & re-inspection fees →
Tips
- Unlike electrical and plumbing, Colorado does not centralize mechanical/HVAC permitting through a state board — this permit type is administered by the City of Holyoke Building Department directly, with no state-deferral ambiguity.
- The adopted mechanical code is the IMC 2018 (Holyoke Municipal Code §15.12.010), with a like-for-like furnace/water-heater/A-C replacement exemption in R-3 occupancies per §15.12.020 — check whether your replacement scope qualifies before assuming a new permit is required.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holyoke building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Holyoke's permit history is searchable by address
1,605 permits on record for Holyoke, 2015–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
96% of Holyoke's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Holyoke
Mechanical / Sheet Metal (HVAC) Permit in other cities
Compare mechanical / sheet metal (hvac) permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Holyoke project checklist
Describe your project once and get every permit, document, and fee it triggers in Holyoke — in one checklist. Free, for any city and any number of projects.
Get started →