Skip to main content
PermitBase

Woodland Park building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Woodland Park, Colorado.

Verified 2026-07-19 · Source

How to schedule

Inspections are requested through the building department below.

Address
City of Woodland Park Planning & Building Department, 220 W. South Avenue, P.O. Box 9007, Woodland Park, CO 80866 — Pikes Peak Regional Building Department, 2880 International Circle, Colorado Springs, CO 80910
Phone
City Planning & Building: 719-687-5202 — Pikes Peak Regional Building Department: 719-327-2880
Office hours
City Planning & Building Department: Monday-Thursday 7:30 a.m.-5:00 p.m.; Friday 7:30 a.m.-4:00 p.m.

Inspection sequence

Applies to: Building Permit (Pikes Peak Regional Building Department)

  1. 1

    Footing (BFT)

    Per PPRBD's Required Inspections listing for single-family new construction.

  2. 2

    Foundation (BFN)

    Per PPRBD's Required Inspections listing; foundation drain (BFD) and foundation insulation (BFI) inspections may also apply depending on scope.

  3. 3

    Frame (BFR)

    Structural framing inspection, per PPRBD's Required Inspections listing.

  4. 4

    Insulation (BIN)

    Per PPRBD's Required Inspections listing.

  5. 5

    Final and Energy Final

    Final building inspection and separate energy-code final, per PPRBD's Required Inspections listing.

Applies to: Multi-Use Zoning Development Permit (Additions, Garages, Decks, Sheds, Accessory Structures, Alterations)

  1. 1

    Footing

    For garages, additions, and decks requiring a footing (per PPRBD's Required Inspections listing for residential accessory structures such as decks).

  2. 2

    Frame

    Structural framing inspection, per PPRBD's Required Inspections listing.

  3. 3

    Final

    Final inspection prior to use/occupancy, per PPRBD's Required Inspections listing.

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Electrical Rough-In

    Conduit runs, wire sizing, and disconnect placement before cover, per PPRBD's adopted NEC edition

  2. 2

    Final and Energy Final

    Racking, roof/ground-mount attachment, and electrical connections verified; per PPRBD's Required Inspections listing for structural work generally

Re-inspection fees

Building Permit (Pikes Peak Regional Building Department)Re-inspection Fee · PPRBD 2023 Building Permit Fee Schedule - Woodland Park (Table D.Q).
$50.00 for 1st incident; $100.00 for 2nd incident; $200.00 for 3rd incident (plus a 2-work-day inspection delay)

Woodland Park building permits

Get alerts for Woodland Park

We'll email you when Woodland Park's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.