EV Charger / Electric Vehicle Charging Station Permit in Woodland Park, Colorado

Woodland Park has no dedicated EV charger/EVSE permit type or fee line. As with solar PV, the Pikes Peak Regional Building Department (PPRBD) — not the City of Woodland Park's own Planning and Building Department — issues the electrical permit covering EV charger circuit wiring, panel/service upgrades, and equipment installation, under PPRBD's adopted NEC edition. Confirmed via review of PPRBD's 2023 Building Permit Fee Schedule - Woodland Park (Table A/B), which contains no line item for 'EV,' 'electric vehicle,' or 'charging station'; a charger installation is billed under the same valuation-based Building Permit Fee (Table A) plus a Trade Permit Attachment Fee for the electrical trade (Table B/B.1), the identical mechanism documented in this file's solar-pv-permit entry. Woodland Park's population (approximately 8,100 as of 2025) is below the 10,000-resident threshold that triggers Colorado HB24-1173's mandatory EV charger permitting model code and 3-business-day decision-notification requirement, so the City/PPRBD is not a 'covered municipality' under that law. Re-verified 2026-07-20 via a direct re-fetch of the live PPRBD 2023 Building Permit Fee Schedule - Woodland Park PDF (February 2025 ICC valuation data, effective June 30, 2025 — current as of this review): Table B ($100.00/trade, commercial) and Table B.1 ($50.00/trade, detached accessory structure or 1-2 family dwelling alteration) figures confirmed unchanged and current; Table A ($50.00 minimum, $1-$500 valuation, scaling per the published bracket table) also confirmed current. No EV/electric vehicle/charging station line item exists anywhere in the schedule.

Verified 2026-07-20 · Source

When you need this permit

  • Apply for the electrical permit covering the EV charger circuit/equipment through PPRBD (2880 International Circle, Colorado Springs, or routed via Woodland Park City Hall), not the City's own Planning and Building Department, which handles only zoning/ZDP review
  • Work must comply with PPRBD's adopted NEC edition (2023 NEC or the state's most recently adopted edition) and be performed by a licensed electrician unless the homeowner qualifies for owner-occupied self-permitting Owner-builderContractor
  • If the charger installation is bundled with new construction or a remodel, it may be captured as a trade permit attachment on that structural building permit rather than filed as a standalone electrical permit
  • A separate Woodland Park Zoning Development Permit (ZDP) is not typically required solely for an EV charger unless the installation involves new site work, a new structure, or setback-affecting equipment placement — confirm with the City's Planning and Building Department for edge cases
  • Woodland Park/PPRBD is NOT a 'covered municipality' under Colorado HB24-1173 (population under the 10,000-resident threshold), so the state's mandatory EV charger permitting model code and 3-business-day decision-notification requirement do not apply here as a matter of state law

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Trade Permit Attachment Fee (electrical trade)PPRBD 2023 Building Permit Fee Schedule - Woodland Park — no dedicated EV-specific fee line exists; a standalone EV charger circuit is billed under this same electrical trade mechanism used for solar PV interconnection work
$100.00 (commercial building permit, Table B) or $50.00 (detached accessory structure or 1-2 family dwelling alteration, Table B.1)
Building Permit Fee (Table A, valuation-based, if a standalone permit is pulled rather than a trade attachment)Applies if PPRBD requires a standalone base permit for the work rather than a trade attachment to an existing permit; confirm current practice with PPRBD (719-327-2880)
$50.00 minimum for valuation $1-$500, scaling per PPRBD 2023 Building Permit Fee Schedule - Woodland Park (Table A)

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Woodland Park?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Rough-In / Final

    Conduit runs, wire sizing, disconnect placement, and final connection verified per PPRBD's adopted NEC edition, per PPRBD's Required Inspections listing for electrical trade work

See the full Woodland Park inspection guide — scheduling & re-inspection fees →

Tips

  • File EV charger electrical work through PPRBD, the same regional authority that handles Woodland Park's building and solar-PV electrical permits — not through the City's own Planning and Building Department, which handles zoning only.
  • Because Woodland Park's population is under the HB24-1173 'covered municipality' threshold, don't assume the state's 3-business-day decision timeline or the EV charger permitting model code apply here; confirm current practice directly with PPRBD.

Frequently asked questions

Woodland Park requires an ev charger / electric vehicle charging station permit for: Apply for the electrical permit covering the EV charger circuit/equipment through PPRBD (2880 International Circle, Colorado Springs, or routed via Woodland Park City Hall), not the City's own Planning and Building Department, which handles only zoning/ZDP review; Work must comply with PPRBD's adopted NEC edition (2023 NEC or the state's most recently adopted edition) and be performed by a licensed electrician unless the homeowner qualifies for owner-occupied self-permitting; If the charger installation is bundled with new construction or a remodel, it may be captured as a trade permit attachment on that structural building permit rather than filed as a standalone electrical permit; A separate Woodland Park Zoning Development Permit (ZDP) is not typically required solely for an EV charger unless the installation involves new site work, a new structure, or setback-affecting equipment placement — confirm with the City's Planning and Building Department for edge cases; Woodland Park/PPRBD is NOT a 'covered municipality' under Colorado HB24-1173 (population under the 10,000-resident threshold), so the state's mandatory EV charger permitting model code and 3-business-day decision-notification requirement do not apply here as a matter of state law. If your project isn't listed, confirm with City of Woodland Park Planning and Building Department (Zoning Development Permits) — Pikes Peak Regional Building Department (structural Building Permits) at City Planning & Building: 719-687-5202 — Pikes Peak Regional Building Department: 719-327-2880 before starting work.

No. There is no dedicated EV charger/EVSE line item in PPRBD's Woodland Park fee schedule. EV charger circuit and equipment installation is billed as ordinary electrical trade work through PPRBD — a Trade Permit Attachment Fee of $50-$100 depending on project type, the same mechanism used for solar PV interconnection work documented in this file's solar-pv-permit entry.

Woodland Park does not publish a plan-review timeline for this permit. Contact City of Woodland Park Planning and Building Department (Zoning Development Permits) — Pikes Peak Regional Building Department (structural Building Permits) at City Planning & Building: 719-687-5202 — Pikes Peak Regional Building Department: 719-327-2880 for current turnaround.

You'll need: PPRBD Building/Electrical Permit Application. See the required-documents checklist on this page for details on each.

Woodland Park requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: Electrical Rough-In / Final. Schedule each through City of Woodland Park Planning and Building Department (Zoning Development Permits) — Pikes Peak Regional Building Department (structural Building Permits) (City Planning & Building: 719-687-5202 — Pikes Peak Regional Building Department: 719-327-2880).

Apply through City of Woodland Park Planning and Building Department (Zoning Development Permits) — Pikes Peak Regional Building Department (structural Building Permits) at City of Woodland Park Planning & Building Department, 220 W. South Avenue, P.O. Box 9007, Woodland Park, CO 80866 — Pikes Peak Regional Building Department, 2880 International Circle, Colorado Springs, CO 80910. Phone: City Planning & Building: 719-687-5202 — Pikes Peak Regional Building Department: 719-327-2880, email: David Burgess, Planner II: dburgess@woodlandpark.gov (also appears as dburgess@city-woodlandpark.org on some City DocumentCenter form footers — woodlandpark.gov is the current canonical domain; the .org address appears to be a legacy/prior domain still printed on some PDF forms). Office hours: City Planning & Building Department: Monday-Thursday 7:30 a.m.-5:00 p.m.; Friday 7:30 a.m.-4:00 p.m.. Official information: https://woodlandpark.gov/230/Planning-and-Building-Department ; https://www.pprbd.org/.

Woodland Park, Colorado has adopted: 2023 Pikes Peak Regional Building Code (PPRBC) — per PPRBD's Residential Plan Review guide, which lists the City of Woodland Park among the jurisdictions served by the Pikes Peak Regional Building Code.; 2021 International Residential Code (IRC); 2021 International Existing Building Code (IEBC); 2021 International Energy Conservation Code (IECC); Colorado Model Electric Ready and Solar Ready Code (CMERSRC); 2021 International Swimming Pool and Spa Code (ISPSC); 2023 National Electrical Code (NEC), or the most recent edition adopted by the State of Colorado, per PPRBD's Residential Plan Review guide; International Fire Code (IFC) and local amendments — enforced by the local Fire Authority (a distinct authority from PPRBD), per PPRBD's Residential Plan Review guide; City of Woodland Park Municipal Code Title 18 (Zoning), which separately governs Zoning Development Permit review (setbacks, fencing, signs, etc.) and is administered by the City's own Planning and Building Department rather than PPRBD.. Local amendments apply — see the Woodland Park overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Woodland Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.