EV Charger / Electric Vehicle Charging Station Permit — Woodland Park, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.pprbd.org/File/ByAlias/WoodlandParkFeeSchedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / Electric Vehicle Charging Station Permit in Woodland Park, Colorado
Woodland Park has no dedicated EV charger/EVSE permit type or fee line. As with solar PV, the Pikes Peak Regional Building Department (PPRBD) — not the City of Woodland Park's own Planning and Building Department — issues the electrical permit covering EV charger circuit wiring, panel/service upgrades, and equipment installation, under PPRBD's adopted NEC edition. Confirmed via review of PPRBD's 2023 Building Permit Fee Schedule - Woodland Park (Table A/B), which contains no line item for 'EV,' 'electric vehicle,' or 'charging station'; a charger installation is billed under the same valuation-based Building Permit Fee (Table A) plus a Trade Permit Attachment Fee for the electrical trade (Table B/B.1), the identical mechanism documented in this file's solar-pv-permit entry. Woodland Park's population (approximately 8,100 as of 2025) is below the 10,000-resident threshold that triggers Colorado HB24-1173's mandatory EV charger permitting model code and 3-business-day decision-notification requirement, so the City/PPRBD is not a 'covered municipality' under that law. Re-verified 2026-07-20 via a direct re-fetch of the live PPRBD 2023 Building Permit Fee Schedule - Woodland Park PDF (February 2025 ICC valuation data, effective June 30, 2025 — current as of this review): Table B ($100.00/trade, commercial) and Table B.1 ($50.00/trade, detached accessory structure or 1-2 family dwelling alteration) figures confirmed unchanged and current; Table A ($50.00 minimum, $1-$500 valuation, scaling per the published bracket table) also confirmed current. No EV/electric vehicle/charging station line item exists anywhere in the schedule.
Verified 2026-07-20 · Source
When you need this permit
- Apply for the electrical permit covering the EV charger circuit/equipment through PPRBD (2880 International Circle, Colorado Springs, or routed via Woodland Park City Hall), not the City's own Planning and Building Department, which handles only zoning/ZDP review
- Work must comply with PPRBD's adopted NEC edition (2023 NEC or the state's most recently adopted edition) and be performed by a licensed electrician unless the homeowner qualifies for owner-occupied self-permitting Owner-builderContractor
- If the charger installation is bundled with new construction or a remodel, it may be captured as a trade permit attachment on that structural building permit rather than filed as a standalone electrical permit
- A separate Woodland Park Zoning Development Permit (ZDP) is not typically required solely for an EV charger unless the installation involves new site work, a new structure, or setback-affecting equipment placement — confirm with the City's Planning and Building Department for edge cases
- Woodland Park/PPRBD is NOT a 'covered municipality' under Colorado HB24-1173 (population under the 10,000-resident threshold), so the state's mandatory EV charger permitting model code and 3-business-day decision-notification requirement do not apply here as a matter of state law
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Rough-In / Final
Conduit runs, wire sizing, disconnect placement, and final connection verified per PPRBD's adopted NEC edition, per PPRBD's Required Inspections listing for electrical trade work
See the full Woodland Park inspection guide — scheduling & re-inspection fees →
Tips
- File EV charger electrical work through PPRBD, the same regional authority that handles Woodland Park's building and solar-PV electrical permits — not through the City's own Planning and Building Department, which handles zoning only.
- Because Woodland Park's population is under the HB24-1173 'covered municipality' threshold, don't assume the state's 3-business-day decision timeline or the EV charger permitting model code apply here; confirm current practice directly with PPRBD.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Woodland Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Woodland Park
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Colorado →
Look up this fee in a different city →