Building Permit (Pikes Peak Regional Building Department) in Woodland Park, Colorado
The structural Building Permit for new construction, alterations, additions, conversions, and repairs to residential or commercial buildings within Woodland Park. This permit is issued and administered entirely by the Pikes Peak Regional Building Department (PPRBD) — a separate regional authority based in Colorado Springs — NOT by the City of Woodland Park, under Section RBC108.2 of the 2023 Pikes Peak Regional Building Code, per the fee schedule adopted for PPRBD's use within Woodland Park. For new construction of one- and two-family dwellings, the fee bundles plumbing, electrical, gas, heating, and building permits together; for commercial buildings, the fee covers the building permit only, with trade permits billed separately (Table B).
Verified 2026-07-19 · Source
When you need this permit
- Applies to new construction, alterations, additions, conversions, and repairs to any commercial or residential building or structure within Woodland Park
- Plans must comply with the PPRBD-adopted code suite: 2023 Pikes Peak Regional Building Code, 2021 IRC, 2021 IEBC, 2021 IECC, Colorado Model Electric Ready and Solar Ready Code, 2021 ISPSC, and 2023 NEC (or the state's most recently adopted edition)
- Commercial plans must include a stamped 'Code Study Form' (stamped by the design professional of record) or will not be accepted for review
- Unconventional construction (steel beams, ICF/masonry walls, earth-sheltered/bermed, steel stud or post-and-beam, pre-engineered metal, SIP, log/pole barns, adobe/masonry brick, straw/tire bale, or anything exceeding IRC conventional limits) must be sealed and signed by a Colorado-licensed design professional
- A Woodland Park ZDP for the same project scope must be approved by the City's zoning department before or alongside the PPRBD building permit for site-specific plans
- Homeowners may self-obtain a permit only for work on a primary residence they own and occupy; work on rental property or a home the applicant does not reside in requires a licensed contractor whose license is in good standing (verifiable via PPRBD's contractor directory) Contractor
- The plan review fee paid at submittal covers two reviews (initial review plus first resubmittal); additional review cycles incur further plan-review fees
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing (BFT)
Per PPRBD's Required Inspections listing for single-family new construction.
- 2
Foundation (BFN)
Per PPRBD's Required Inspections listing; foundation drain (BFD) and foundation insulation (BFI) inspections may also apply depending on scope.
- 3
Frame (BFR)
Structural framing inspection, per PPRBD's Required Inspections listing.
- 4
Insulation (BIN)
Per PPRBD's Required Inspections listing.
- 5
Final and Energy Final
Final building inspection and separate energy-code final, per PPRBD's Required Inspections listing.
See the full Woodland Park inspection guide — scheduling & re-inspection fees →
Tips
- Plans submitted electronically are not released for download until an entire review cycle is complete; do not expect to see PPRBD's markups mid-review. Resubmittals must include the complete discipline-specific PDF with all revised sheets — uploading only single revised sheets is explicitly disallowed by PPRBD's Plan Review Policies.
- The plan review fee covers only two reviews (initial plus first resubmittal). A third submittal draws a $100 resubmittal fee, and a third review draws a $100/hour fee — budget for a clean first resubmittal to avoid escalating costs.
- Trade permit attachment fees differ sharply by project type: $100/trade for a commercial building permit (Table B) versus $50/trade for a detached accessory structure or 1-2 family dwelling alteration (Table B.1) — confirm which table applies before estimating total cost.
- PPRBD's fee schedule for Woodland Park is explicitly labeled '2023 Building Permit Fee Schedule' with 'February 2025 ICC Valuation Data effective June 30, 2025' — confirm with PPRBD (719-327-2880) that this valuation data has not since been superseded before budgeting a project.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Woodland Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Woodland Park
Building Permit (Pikes Peak Regional Building Department) in other cities
Compare building permit (pikes peak regional building department) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Woodland Park project checklist
Describe your project once and get every permit, document, and fee it triggers in Woodland Park — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →