Sign Zoning Development Permit (Permanent, Portable/Temporary, and Banner) in Woodland Park, Colorado

Required City ZDP for most signs in Woodland Park, per the City's revised 2010 sign code. Signs exceeding 4 feet or illuminated signs may require an additional permit through PPRBD.

Verified 2026-07-19 · Source

When you need this permit

  • Sign permits are required for most signs in Woodland Park (revised sign code adopted 2010)
  • An approved ZDP must be submitted before installation for signs requiring one
  • Signs over 4 feet or illuminated signs may require additional permits through PPRBD
  • Separate application forms exist for Permanent Signs versus Temporary and Portable Signs

Required documents

Check off what you have — your progress is saved on this device.

Fee schedule

Signs — Permanent2026 Zoning Application & Development Fees, revised 1/1/2026.
$68.00 + Use Tax
Signs — Portable2026 Zoning Application & Development Fees, revised 1/1/2026.
$68.00 + Use Tax
Banner2026 Zoning Application & Development Fees, revised 1/1/2026.
$34.00 + Use Tax

Review timeline

Plan review
Not published — contact the department

How long did your Sign Zoning Development Permit (Permanent, Portable/Temporary, and Banner) permit actually take in Woodland Park?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    PPRBD Sign Inspection (conditional)

    Applies only where a sign exceeds 4 feet or is illuminated and therefore also requires a PPRBD permit; PPRBD's own fee schedule lists a $30.00 base Sign Permit Fee with a $25.00 charge for each inspection beyond the first.

See the full Woodland Park inspection guide — scheduling & re-inspection fees →

Tips

  • Illuminated signs and signs over 4 feet trigger a SECOND permit through PPRBD in addition to the City's Sign ZDP — don't assume the $68 City fee is the only cost for a lit business sign.
  • The City publishes separate brochures for banners, temporary signs, permanent signs, real estate signs, and sidewalk/portable signs — confirm which application and fee line applies to your specific sign type before submitting.

Frequently asked questions

Woodland Park requires a sign zoning development permit (permanent, portable/temporary, and banner) for: Sign permits are required for most signs in Woodland Park (revised sign code adopted 2010); An approved ZDP must be submitted before installation for signs requiring one; Signs over 4 feet or illuminated signs may require additional permits through PPRBD; Separate application forms exist for Permanent Signs versus Temporary and Portable Signs. If your project isn't listed, confirm with City of Woodland Park Planning and Building Department (Zoning Development Permits) — Pikes Peak Regional Building Department (structural Building Permits) at City Planning & Building: 719-687-5202 — Pikes Peak Regional Building Department: 719-327-2880 before starting work.

In Woodland Park, the published Signs — Permanent is: $68.00 + Use Tax. Additional published fees: Signs — Portable — $68.00 + Use Tax; Banner — $34.00 + Use Tax. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Woodland Park does not publish a plan-review timeline for this permit. Contact City of Woodland Park Planning and Building Department (Zoning Development Permits) — Pikes Peak Regional Building Department (structural Building Permits) at City Planning & Building: 719-687-5202 — Pikes Peak Regional Building Department: 719-327-2880 for current turnaround.

Depending on your project, Woodland Park may also ask for: Sign Application for Permanent Signs ZDP; Sign Application for Temporary and Portable Signs ZDP. See the required-documents checklist on this page for details on each.

Woodland Park requires 1 inspection(s) for a sign zoning development permit (permanent, portable/temporary, and banner), in order: PPRBD Sign Inspection (conditional). Schedule each through City of Woodland Park Planning and Building Department (Zoning Development Permits) — Pikes Peak Regional Building Department (structural Building Permits) (City Planning & Building: 719-687-5202 — Pikes Peak Regional Building Department: 719-327-2880).

Apply through City of Woodland Park Planning and Building Department (Zoning Development Permits) — Pikes Peak Regional Building Department (structural Building Permits) at City of Woodland Park Planning & Building Department, 220 W. South Avenue, P.O. Box 9007, Woodland Park, CO 80866 — Pikes Peak Regional Building Department, 2880 International Circle, Colorado Springs, CO 80910. Phone: City Planning & Building: 719-687-5202 — Pikes Peak Regional Building Department: 719-327-2880, email: David Burgess, Planner II: dburgess@woodlandpark.gov (also appears as dburgess@city-woodlandpark.org on some City DocumentCenter form footers — woodlandpark.gov is the current canonical domain; the .org address appears to be a legacy/prior domain still printed on some PDF forms). Office hours: City Planning & Building Department: Monday-Thursday 7:30 a.m.-5:00 p.m.; Friday 7:30 a.m.-4:00 p.m.. Official information: https://woodlandpark.gov/230/Planning-and-Building-Department ; https://www.pprbd.org/.

Woodland Park, Colorado has adopted: 2023 Pikes Peak Regional Building Code (PPRBC) — per PPRBD's Residential Plan Review guide, which lists the City of Woodland Park among the jurisdictions served by the Pikes Peak Regional Building Code.; 2021 International Residential Code (IRC); 2021 International Existing Building Code (IEBC); 2021 International Energy Conservation Code (IECC); Colorado Model Electric Ready and Solar Ready Code (CMERSRC); 2021 International Swimming Pool and Spa Code (ISPSC); 2023 National Electrical Code (NEC), or the most recent edition adopted by the State of Colorado, per PPRBD's Residential Plan Review guide; International Fire Code (IFC) and local amendments — enforced by the local Fire Authority (a distinct authority from PPRBD), per PPRBD's Residential Plan Review guide; City of Woodland Park Municipal Code Title 18 (Zoning), which separately governs Zoning Development Permit review (setbacks, fencing, signs, etc.) and is administered by the City's own Planning and Building Department rather than PPRBD.. Local amendments apply — see the Woodland Park overview page for the full list.

Yes, for most signs, per the City's revised 2010 sign code. Signs requiring a Zoning Development Permit must have an approved application submitted before installation. Illuminated signs or signs over 4 feet may require an additional PPRBD permit.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Woodland Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.