Accessory Dwelling Unit (ADU) Permit in Windsor, Colorado
Required for construction of an ADU in Windsor, a two-step process: first a Planning Department land-use application/approval (Municipal Code Sec. 14-2-100 zoning eligibility, Sec. 16-3-40 ADU regulations), then a standard building permit once the ADU land-use application is approved and recorded.
Verified 2026-07-06 · Source
When you need this permit
- ADUs are permitted as an accessory use in conjunction with all single-family detached dwellings in all zoning districts that permit single-family dwelling units
- ADU living space must be between 500 and 950 square feet, and the ADU's living space may not be larger than the living space of the principal dwelling
- A single-family dwelling must already exist as the principal dwelling on the lot, or be constructed in conjunction with the ADU; a Certificate of Occupancy will only be granted to the ADU after it has been granted to the principal dwelling
- An existing off-street parking space (driveway, garage, tandem parking, other off-street space, or on-street parking) must be available for designation to the ADU
- ADU must be compatible in design with the principal dwelling; photos of the principal home plus proposed ADU elevations (front and side) are required
- Type I (detached), Type II (attached/internal, locked off from the principal dwelling, considered a separate dwelling unit under the building code), and Type III (attached/internal, NOT locked off, considered part of one dwelling unit under the building code) are the three defined ADU types
- A Declaration of Restrictive Covenants must be recorded: the property owner (Declarant) must reside on the property as their primary residence (with a short-term-rental exception allowing residence in either the principal dwelling or the ADU while an STR permit is active); ADU ownership cannot be transferred separately from the principal dwelling, nor may the property be subdivided; the ADU is restricted to its approved size
- Two (2) sets of architectural/floor plans, engineered foundation plans (wet-stamped by a Colorado-licensed engineer for new detached structures), electrical plans, mechanical plans, fire separation assemblies (a listed 2-hour fire-rated horizontal/vertical assembly separating units per the IRC), and (if applicable) stamped fire protection plans are required
- Two (2) copies of Manual J and Manual D compliance calculations, plus IECC energy code compliance documentation (ResCheck or an energy rating company report), are required
- A soils report and Site Grading Certificate must be approved by the Town before a Certificate of Occupancy is issued
- Once the ADU land-use application is approved and recorded with the county, the applicant may then submit for the actual building permit
- Type I ADU site plans must be prepared and signed by a Colorado Licensed Surveyor or Engineer
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Wet-stamped engineered foundation plan verified before concrete pour (new detached structures)
- 2
Framing / Fire Separation
Framing complete; 2-hour fire-rated horizontal/vertical assembly separation verified for Type I/II ADUs
- 3
Rough Electrical/Mechanical
Panel locations, receptacles, 50% efficiency lighting plan, mechanical equipment/ductwork verified before concealment
- 4
Final Inspection
All work complete; Certificate of Occupancy withheld until the principal dwelling itself already holds a Certificate of Occupancy
See the full Windsor inspection guide — scheduling & re-inspection fees →
Tips
- Windsor's ADU process is two distinct stages: a Planning Department land-use application/zoning approval FIRST (1-3 months per the Town's own page), THEN a standard building permit through SAFEbuilt — budget for both stages sequentially, not concurrently.
- The ADU size window (500-950 SF, and never larger than the principal dwelling's own living space) is a two-sided cap unlike some jurisdictions that only cap the maximum — check both bounds.
- A Certificate of Occupancy for the ADU will not be granted until the principal dwelling itself already holds one — relevant if you're building both simultaneously as new construction.
- The Declaration of Restrictive Covenants is a real recorded legal instrument, not just a checklist item — it binds successors in ownership and restricts the ADU from ever being sold/subdivided separately from the principal home.
- An optional no-fee concept-plan review is available before the formal application — worth using given the two-stage process and the value of catching zoning issues early.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Windsor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Windsor
Accessory Dwelling Unit (ADU) Permit in other cities
Compare accessory dwelling unit (adu) permit fees across Colorado →
Look up this fee in a different city →