Solar Photovoltaic (PV) Permit in Windsor, Colorado

Required for installation of rooftop residential or commercial solar photovoltaic systems within the Town of Windsor. Building permit review and inspection is contracted to SAFEbuilt, the same third party that administers all other Windsor building permits; the electrical portion is governed by the 2023 NEC. No dedicated solar/PV fee line item is published in the Town's Fee Schedule — solar is billed under the same SAFEbuilt valuation-based Building Permit Fee plus the Town's 25% Administration Fee, subject to Colorado's statewide solar permit fee cap.

Verified 2026-07-20 · Source

When you need this permit

  • Building permit required for the structural/roof-mounting portion, reviewed and inspected by SAFEbuilt under contract to the Town of Windsor
  • Electrical permit required for PV wiring/interconnection, governed by the 2023 NEC (effective for applications submitted on or after January 1, 2024); no separate Town of Windsor contractor license required, but the electrician must hold a current Colorado Electrical Board (DORA) license Contractor
  • Under Colorado's statewide solar permit fee cap (C.R.S. § 24-48.5-113, enacted by HB21-1284), a covered local jurisdiction's total building-permit-related fees for a residential solar PV system may not exceed $500, and $1,000 for commercial systems, regardless of project valuation
  • Windsor is subject to Colorado's automated-permitting mandate for cities over 5,000 population (HB25-1096); confirm with SAFEbuilt/the Permit Technician whether an automated online solar plan-review pathway (e.g. SolarAPP+) is currently offered

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Statewide aggregate solar permit fee cap — ResidentialC.R.S. § 24-48.5-113, enacted by HB21-1284 (2021), extended through Dec. 31, 2029; caps the total of all governmental permit/review fees for an active solar energy system — governs regardless of what the SAFEbuilt valuation-based fee would otherwise calculate
$500 (combined Town + State Electrical Board fees)
Statewide aggregate solar permit fee cap — CommercialC.R.S. § 24-48.5-113, enacted by HB21-1284 (2021)
$1,000 (combined Town + State Electrical Board fees)
Building Permit Fee (SAFEbuilt valuation-based)Town of Windsor Fee Schedule (Updated 02.01.2026), Building Permit Fees section: 'Building Permit Fee — SAFEbuilt' with no dollar figure published locally
Equal to SAFEbuilt's own valuation-based fee — no dedicated solar/PV line item published locally; subject to the statewide cap above
Windsor Administration FeeTown of Windsor Fee Schedule (Updated 02.01.2026), Res 1992-18
25% of the SAFEbuilt fee
Use TaxTown of Windsor Fee Schedule (Updated 02.01.2026), Ord 2002-1106 / Res 2014-51
3.65% of half the project's valuation

Review timeline

Plan review
Not published — contact the department

How long did your Solar Photovoltaic (PV) Permit permit actually take in Windsor?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical (SAFEbuilt)

    Conduit runs, wire sizing, and disconnect placement before cover, per the 2023 NEC

  2. 2

    Final (SAFEbuilt)

    Racking, roof penetrations, and electrical connections verified

See the full Windsor inspection guide — scheduling & re-inspection fees →

Tips

  • Windsor's building permit fee for solar is calculated by SAFEbuilt (the Town's contracted building-permit administrator) using the same valuation-based structure as any other building permit, plus the Town's 25% Administration Fee — no solar-specific discount or flat fee is published.
  • Colorado's statewide solar permit fee cap (C.R.S. § 24-48.5-113) still limits what Windsor can charge in total building-permit fees for a residential solar PV system to $500 ($1,000 commercial), even though the Town's own Fee Schedule has no dedicated solar line item — confirm the cap is being applied if the SAFEbuilt valuation-based fee calculates higher.

Frequently asked questions

Windsor requires a solar photovoltaic (pv) permit for: Building permit required for the structural/roof-mounting portion, reviewed and inspected by SAFEbuilt under contract to the Town of Windsor; Electrical permit required for PV wiring/interconnection, governed by the 2023 NEC (effective for applications submitted on or after January 1, 2024); no separate Town of Windsor contractor license required, but the electrician must hold a current Colorado Electrical Board (DORA) license; Under Colorado's statewide solar permit fee cap (C.R.S. § 24-48.5-113, enacted by HB21-1284), a covered local jurisdiction's total building-permit-related fees for a residential solar PV system may not exceed $500, and $1,000 for commercial systems, regardless of project valuation; Windsor is subject to Colorado's automated-permitting mandate for cities over 5,000 population (HB25-1096); confirm with SAFEbuilt/the Permit Technician whether an automated online solar plan-review pathway (e.g. SolarAPP+) is currently offered. If your project isn't listed, confirm with Town of Windsor Community Development / Building Permits (Building Division contracted to SAFEbuilt) at 970-674-2436 (Permit Technician); 970-674-2400 (Town main line, option 4 for Building Permits/Community Development); SAFEbuilt Inspections 970-674-1036 or 1-866-671-1036 before starting work.

No dedicated solar/PV line item is published in the Town's Fee Schedule. The building permit fee is calculated by SAFEbuilt using the same valuation-based structure as other permits, plus the Town's 25% Administration Fee — but Colorado's statewide solar fee cap (C.R.S. § 24-48.5-113, HB21-1284) limits the total to $500 for residential and $1,000 for commercial systems.

Windsor does not publish a plan-review timeline for this permit. Contact Town of Windsor Community Development / Building Permits (Building Division contracted to SAFEbuilt) at 970-674-2436 (Permit Technician); 970-674-2400 (Town main line, option 4 for Building Permits/Community Development); SAFEbuilt Inspections 970-674-1036 or 1-866-671-1036 for current turnaround.

You'll need: Building/Electrical Permit Application; Colorado Electrical Board (DORA) License. See the required-documents checklist on this page for details on each.

Windsor requires 2 inspection(s) for a solar photovoltaic (pv) permit, in order: Rough Electrical (SAFEbuilt), Final (SAFEbuilt). Schedule each through Town of Windsor Community Development / Building Permits (Building Division contracted to SAFEbuilt) (970-674-2436 (Permit Technician); 970-674-2400 (Town main line, option 4 for Building Permits/Community Development); SAFEbuilt Inspections 970-674-1036 or 1-866-671-1036).

Apply through Town of Windsor Community Development / Building Permits (Building Division contracted to SAFEbuilt) at 200 N. 11th Street, Windsor, CO 80550 (Permit Technician); Planning Department at 301 Walnut Street, Windsor, CO 80550. Phone: 970-674-2436 (Permit Technician); 970-674-2400 (Town main line, option 4 for Building Permits/Community Development); SAFEbuilt Inspections 970-674-1036 or 1-866-671-1036, email: SAFEbuilt inspection requests: inspect@safebuilt.com. Town Permit Technician (Robin Volner, per the Multi-Family Building Permit Fee Estimate form): rvolner@windsorgov.com. Office hours: Monday-Thursday, 8 a.m. to 5 p.m.; online services available Fridays (Town offices are closed to walk-in service on Fridays per the Building Permits page). Official information: https://www.windsorco.gov/137/Building-Permits.

Windsor, Colorado has adopted: 2024 International Codes (I-Codes), adopted with an effective date of January 1, 2026 — Town of Windsor Building Permits page (verbatim: 'The 2024 I-Codes have been adopted with the effective date of January 1, 2026') states all new building plans, including master plans and energy code submissions, are reviewed under the 2024 I-Codes as of that date. Source: https://www.windsorco.gov/137/Building-Permits; 2023 National Electrical Code (NEC), effective for permit applications submitted on or after January 1, 2024 — per the Town's own '2023 NEC Adoption Letter — Windsor' PDF referenced from the Building Permits page; 2025 Colorado Wildfire Resiliency Code (CWRC), adopted by the Colorado Wildfire Resiliency Code Board (WRCB) effective July 1, 2025 (8 CCR 1507-39); the Town of Windsor's own Building Permits page states the CWRC 'will take effect in Windsor on July 1, 2026'; DATA-CURRENCY CONFLICT DISCLOSED: the Town's separately-hosted 'Design Criteria and Adopted Codes' PDF (last modified 2024-07-23, prior to the 2024 I-Codes' Jan 1, 2026 effective date) still lists a superseded code suite — 2018 IRC/IBC, 2018 IECC, 2018 IFC, 2020 NEC, 2018 IPC, 2018 IMC, 2018 IFGC, 2018 IEBC, 2018 ISPSC, all 'with Amendments' — and has evidently not been refreshed to reflect the 2024 I-Codes/2023 NEC transition confirmed directly and verbatim on the live Building Permits page. This file treats the live Building Permits page (2024 I-Codes eff. 1/1/2026, 2023 NEC eff. 1/1/2024) as the current governing code list, per the more-recent, directly-dated source. Source: https://www.windsorco.gov/DocumentCenter/View/16086/Adopted-Codes-and-Design-Criteria (PDF metadata ModDate 2024-07-23) vs. https://www.windsorco.gov/137/Building-Permits (live page, fetched 2026-07-06). Local amendments apply — see the Windsor overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Windsor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.