Skip to main content
PermitBase

Fence / Wall Permit and Regulations in Windsor, Colorado

Fences meeting Windsor's standard fencing regulations generally do NOT require a building permit, per the Town's own FAQ, but all fences/walls/architectural screening devices must still conform to the zoning district's height, setback, and offset rules set out in the Town's Fence Regulations handout.

Verified 2026-07-06 · Source

When you need this permit

  • Generally, no permit is required for a fence, 'as long as the fence meets the standard fencing regulations,' per the Town's FAQ
  • For non-industrially-zoned properties: maximum height 6 feet generally (unless specifically authorized otherwise); solid fences/walls/hedgerows/barriers over 4 feet are prohibited in the front yard; screening devices may extend 4-feet-tall from each front building corner into the front yard for up to 8 feet, beyond which the 4-foot cap continues to apply; chain-link fencing is prohibited in front yards
  • Electrified fences (with a shock-capable charge) are prohibited town-wide
  • All fences must conform to the visibility-triangle requirements of Municipal Code Sec. 16-10-10 at street intersections (no substantial impediment to visibility between 3 and 8 feet high within the defined 40-foot triangular area)
  • Limited-industrially-zoned properties: 6-foot front-yard cap, up to 8-foot side/rear (conditional-use approval required beyond that), vinyl-clad chain-link required, limited barbed/smooth-wire strand allowances
  • Heavy-industrially-zoned properties: 6-foot front-yard cap, up to 10-foot side/rear (conditional-use approval required beyond that), vinyl-clad chain-link required along rights-of-way/front yards

Required documents

Check off what you have — your progress is saved on this device.

Fee schedule

No fee generally applicableMost fences meeting the standard regulations require no permit and therefore no fee; contact the Permit Technician (970-674-2436) if a specific fence/wall design falls outside the standard regulations and requires review
N/A

Review timeline

Plan review
Not published — contact the department

How long did your Fence / Wall Permit and Regulations permit actually take in Windsor?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Windsor inspection guide — scheduling & re-inspection fees →

    Tips

    • Windsor is unusually permissive on fences compared to some peer jurisdictions in this corpus (e.g., Northglenn, which requires a permit for nearly ALL fences) — most Windsor fences that meet the standard height/setback/material rules need no permit at all.
    • The 8-foot 'stepped' allowance from each front building corner (full height for 8 feet, then dropping to a 4-foot cap) is a distinctive local rule — don't assume a uniform front-yard height limit applies across the entire front yard.
    • Chain-link fencing is banned outright in front yards town-wide for non-industrial properties, regardless of height.

    Frequently asked questions

    Generally, no, as long as the fence meets the Town's standard fencing regulations (height, setback, material, and visibility-triangle rules in the Fence Regulations handout). Fences that don't meet those standard rules should be confirmed with the Permit Technician.

    In Windsor, the published No fee generally applicable is: N/A. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Windsor does not publish a plan-review timeline for this permit. Contact Town of Windsor Community Development / Building Permits (Building Division contracted to SAFEbuilt) at 970-674-2436 (Permit Technician); 970-674-2400 (Town main line, option 4 for Building Permits/Community Development); SAFEbuilt Inspections 970-674-1036 or 1-866-671-1036 for current turnaround.

    Depending on your project, Windsor may also ask for: Site Plan (if permit determination requires one). See the required-documents checklist on this page for details on each.

    Apply through Town of Windsor Community Development / Building Permits (Building Division contracted to SAFEbuilt) at 200 N. 11th Street, Windsor, CO 80550 (Permit Technician); Planning Department at 301 Walnut Street, Windsor, CO 80550. Phone: 970-674-2436 (Permit Technician); 970-674-2400 (Town main line, option 4 for Building Permits/Community Development); SAFEbuilt Inspections 970-674-1036 or 1-866-671-1036, email: SAFEbuilt inspection requests: inspect@safebuilt.com. Town Permit Technician (Robin Volner, per the Multi-Family Building Permit Fee Estimate form): rvolner@windsorgov.com. Office hours: Monday-Thursday, 8 a.m. to 5 p.m.; online services available Fridays (Town offices are closed to walk-in service on Fridays per the Building Permits page). Official information: https://www.windsorco.gov/137/Building-Permits.

    Windsor, Colorado has adopted: 2024 International Codes (I-Codes), adopted with an effective date of January 1, 2026 — Town of Windsor Building Permits page (verbatim: 'The 2024 I-Codes have been adopted with the effective date of January 1, 2026') states all new building plans, including master plans and energy code submissions, are reviewed under the 2024 I-Codes as of that date. Source: https://www.windsorco.gov/137/Building-Permits; 2023 National Electrical Code (NEC), effective for permit applications submitted on or after January 1, 2024 — per the Town's own '2023 NEC Adoption Letter — Windsor' PDF referenced from the Building Permits page; 2025 Colorado Wildfire Resiliency Code (CWRC), adopted by the Colorado Wildfire Resiliency Code Board (WRCB) effective July 1, 2025 (8 CCR 1507-39); the Town of Windsor's own Building Permits page states the CWRC 'will take effect in Windsor on July 1, 2026'; DATA-CURRENCY CONFLICT DISCLOSED: the Town's separately-hosted 'Design Criteria and Adopted Codes' PDF (last modified 2024-07-23, prior to the 2024 I-Codes' Jan 1, 2026 effective date) still lists a superseded code suite — 2018 IRC/IBC, 2018 IECC, 2018 IFC, 2020 NEC, 2018 IPC, 2018 IMC, 2018 IFGC, 2018 IEBC, 2018 ISPSC, all 'with Amendments' — and has evidently not been refreshed to reflect the 2024 I-Codes/2023 NEC transition confirmed directly and verbatim on the live Building Permits page. This file treats the live Building Permits page (2024 I-Codes eff. 1/1/2026, 2023 NEC eff. 1/1/2024) as the current governing code list, per the more-recent, directly-dated source. Source: https://www.windsorco.gov/DocumentCenter/View/16086/Adopted-Codes-and-Design-Criteria (PDF metadata ModDate 2024-07-23) vs. https://www.windsorco.gov/137/Building-Permits (live page, fetched 2026-07-06). Local amendments apply — see the Windsor overview page for the full list.

    Solid fences, walls, or hedgerows over 4 feet are prohibited in the front yard for non-industrial properties, though screening devices may extend at a taller height from each front building corner for up to 8 feet before the 4-foot cap resumes. The overall non-industrial height cap (outside the front yard) is generally 6 feet.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-06.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Windsor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.