Skip to main content
PermitBase

Minidoka County (Building Authority for Unincorporated County and the Cities of Acequia, Minidoka, Paul, and Rupert) building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Minidoka County (Building Authority for Unincorporated County and the Cities of Acequia, Minidoka, Paul, and Rupert), Idaho.

Last verified 2026-07-04 · Source · Embed this page’s badge · Version history

Building department

Address
715 G Street, PO Box 368, Rupert, ID 83350
Phone
208-436-7183
Office hours
Monday–Friday, 8:30 AM to 5:00 PM, per minidoka.id.us/179/Building-and-Zoning. Building Official/Zoning Administrator: Rick Nay (also serves as City of Paul and City of Rupert zoning contact); Building Inspector: Taylor Podunovich; Plan Review/Permit Technician: Patricia Olmos-Navarrete; Administrative Assistant: Jocelyne Zavala. General Building Department line 208-436-7180 is also published on several county pages alongside the department's direct 208-436-7183 number; fax 208-436-1580.
Website
Official site

Inspection guide

See how inspections work in Minidoka County (Building Authority for Unincorporated County and the Cities of Acequia, Minidoka, Paul, and Rupert) — sequence, scheduling & re-inspection fees.

Codes adopted

Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.

  • 2018 International Residential Code (IRC) — per the Minidoka County Building Department's own Residential Building Packet and Manufactured Home Packet (minidoka.id.us/DocumentCenter/View/1727/Residential-Application-Packet), both headed 'CURRENT CODES: 2018 International Residential Code (IRC)' as of the packet's current publication.
  • 2018 International Building Code (IBC) — per the county's Adopted Building Codes page (minidoka.id.us/371/Building-Codes), effective January 1, 2021.
  • 2018 International Energy Conservation Code (IECC) — per the county's Adopted Building Codes page, effective January 1, 2021.
  • 2018 International Existing Building Code (IEBC) — per the county's Adopted Building Codes page, effective January 1, 2021.
  • 2018 International Mechanical Code (IMC) — per the county's Adopted Building Codes page, effective January 1, 2021.
  • NOTE: The county's Adopted Building Codes page does not list adopted editions for the IPC (plumbing), IFGC (fuel gas), or NEC (electrical) because plumbing and electrical permitting/inspection in Minidoka County is performed by the State of Idaho Division of Building Safety (DOPL), not the county, per the county's own Other Permitting page (minidoka.id.us/373/Other-Permitting) and the Residential Building Packet ('Idaho DOPL Electrical/Plumbing Permits - (800) 955-3044, https://dopl.idaho.gov'). No county-published edition number for those trades was found; omitted rather than assumed.
  • NOTE: The Adopted Building Codes page (effective date January 1, 2021) and the current Residential/Manufactured Home Packets (which post only the IRC edition explicitly, with no listed effective date) were both checked as of 2026-07-04; no newer code-adoption ordinance or later effective date was found published on minidoka.id.us. No county-specific local amendments to the IBC/IRC text itself (e.g., snow-load or seismic amendments beyond the standard Climate and Geographic Design Criteria table reproduced in the packets) were found published separately from that table.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
9units

9 buildings · $2.7M valuation

Trailing 12 months
131units

12 of 12 months reported · #28 in Idaho coverage by units

Year to date (2026 YTD through 2026-05)
40units

40 buildings · $11.9M valuation

Full year 2025
156units

151 buildings · $49.5M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated cities; county file row: 'Minidoka County' (co2605c.txt, 16/067)

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity

Tips & gotchas

  • IMPORTANT — Minidoka County's Building Department is the building authority for the ENTIRE county, including the incorporated Cities of Acequia, Minidoka, Paul, and Rupert. This is confirmed directly by the county's own Building and Zoning page (minidoka.id.us/179/Building-and-Zoning), which states: 'Minidoka County serves as the Building Department for Minidoka County and the Cities of Acequia, Minidoka, Paul, and Rupert.' None of those four towns operates its own separate building department — residents and contractors in Rupert, Paul, Minidoka, or Acequia should use THIS file (Minidoka County Building Department), not a city-specific jurisdiction file, because no such file exists or would be accurate.
  • EXCEPTION: the City of Heyburn — also located in Minidoka County and in fact the county's largest city — maintains its OWN separate building department, distinct from the county's. This is stated on the county's own Other Permitting page (minidoka.id.us/373/Other-Permitting: 'Minidoka County Building Department serves the county plus Cities of Acequia, Minidoka, Paul, and Rupert, while Heyburn maintains its own building department') and corroborated by the Residential/Manufactured Home Packets, which list a separate 'MCFPD' fire district contact for Heyburn (1120 21st Street, Heyburn) distinct from the City of Rupert and 'West End' fire district contacts used for the other four towns. Heyburn should be documented under its own jurisdiction file, NOT this one.
  • Electrical and plumbing permits are issued and inspected by the State of Idaho Division of Building Safety (DOPL) at (800) 955-3044 / dopl.idaho.gov — NOT by Minidoka County. This applies uniformly across the county and all four covered cities.
  • Septic and drain-field permits go through the South Central Public Health District (Scott Arnell, (208) 678-8221, 485 Roger Ave, Heyburn ID 83336) — a separate agency from the Building Department.
  • Zoning contact varies by city even though building permitting is unified: City of Paul and City of Rupert zoning both route through Rick Nay (208-436-7183, the same Building Official who runs the county department); City of Acequia zoning is Matt Darrington (208-260-5280); City of Minidoka zoning is Paul Ross (208-878-3368) — despite different zoning contacts, all four cities' BUILDING permits go through the single Minidoka County Building Department at 715 G Street, Rupert.
  • County and city setbacks differ: county parcels require 30 feet from road right-of-way (5 feet side/rear); city parcels (Acequia, Minidoka, Paul, Rupert) require 20 feet from road right-of-way (5 feet side/rear), per both the Residential and Manufactured Home Packets.
  • Currently adopted code per the county's own Residential/Manufactured Home Packets is the 2018 IRC; the county's separate Adopted Building Codes page additionally lists 2018 IBC, 2018 IECC, 2018 IEBC, and 2018 IMC, effective January 1, 2021 — no more recent (e.g., 2021 or 2024) code-edition adoption was found published on minidoka.id.us as of 2026-07-04.
  • No county-published numeric fee schedule (valuation brackets, flat per-trade fees, or percentage-based plan-review fee) was found online in any form — not on the Building Permits, Residential, Manufactured Homes, or Commercial pages, and not within either downloadable application packet. The county directs fee inquiries to 208-436-7180. This is a materially different situation from Iron County, Utah (whose fee schedule is published as a standalone PDF) — all `fees` arrays in this file are therefore empty rather than populated with invented figures.
  • Plan review turnaround is explicitly published as 5-10 business days for BOTH residential and manufactured-home permits, once a complete application is received — applications are processed in the order received, so incomplete submittals cause delays.
  • All development on the Snake River Shoreline requires review by the Minidoka County Building and Zoning Department regardless of whether the parcel is in the unincorporated county or one of the four covered cities.
  • A permit becomes null and void if construction has not commenced within 180 days of issuance, or if work is suspended/abandoned for 180 days at any point after commencement — this is printed directly on the Permit Agreement section of both application packets.

Related guides

Comparable nearby cities

Rupert
Both in Minidoka County4 shared permit types
Compare fees →
Heyburn
Both in Minidoka County3 shared permit types
Compare fees →