Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements) — Havre, Montana · Requirements sheet
Verified 2026-08-26 · Source: https://www.ci.havre.mt.us/public-works
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements) in Havre, Montana
Required for new commercial construction, commercial additions, remodels, and tenant improvement/build-out work within Havre city limits. Havre's Building certification with the Montana Department of Labor & Industry (DLI) Building Codes Bureau carries no residential-only or commercial-only qualifier — unlike several other certified Montana cities on the same DLI list — so the City of Havre Public Works Department reviews and inspects commercial building work directly through its own certified building official, the same as residential work, rather than referring it to the state. Commercial projects are submitted on a dedicated Commercial Building Permit Application, distinct from the general Building Permit Application used for residential work, but both are billed on the same citywide valuation-based Building Permit Fee Schedule and the same flat Plan Review Fee.
Verified 2026-08-26 · Source
When you need this permit
- Required for new commercial construction, additions, remodels, tenant improvement/build-out work, and repairs within Havre city limits
- Submitted on the City's dedicated Commercial Building Permit Application, distinct from the general Building Permit Application used for residential work
- Application requires Job Site Address, Legal Description, Assessment Code No., Project Value (cost of time and materials), Use of Building, Number of Stories, Square Footage, Description of Work, Tenant and/or Project Name and phone, Property Owner name/address/phone/email, Contractor name/address/phone/email, Architect/Engineer name/address/phone/email, and a named point of contact for plan review comments
- Reviewed under the 2021 International Building Code as adopted by reference under Havre City Code 4-1-1, which adopts whatever code edition the Montana DLI Building Codes Bureau currently has in force statewide (2021 IBC, effective June 11, 2022)
- Building Permit Fee and Plan Review Fee are calculated from the same citywide valuation-based Total Valuation & Fee table used for residential construction; Havre does not publish a separate, higher plan-review percentage for commercial work the way some Montana cities do
- All permits must be reviewed and signed by the Public Works Department and paid for at City Hall prior to issuance
- Havre holds Building-only ('B') certification from the Montana DLI Building Codes Bureau, City Limits only, with Trevor Mork as the certified building inspector of record and no residential-only or commercial-only qualifier attached to that certification on the Bureau's own certified-jurisdiction list
- Electrical, plumbing, and mechanical scopes of a commercial project are not covered by this permit — Havre is not certified for those trades, so they are permitted separately and directly by the Montana DLI Building Codes Bureau in Helena
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
Tips
- Havre's Commercial Building Permit Application is a distinct one-page form from the general Building Permit Application used for residential work, but both draw fees from the same citywide valuation-based Fee Schedule — there is no separate, higher commercial plan-review percentage the way some neighboring Montana cities publish.
- Havre's Building certification on the Montana DLI Building Codes Bureau's own certified-jurisdiction list carries no residential-only or commercial-only qualifier — unlike, for example, Hardin's 'B (residential only)' listing on the same document — so the City reviews and inspects commercial building work directly through its own certified building official rather than referring it to the state.
- Electrical, plumbing, and mechanical work on a commercial project is not covered by this permit — Havre is not certified for those trades, so they remain separately permitted, directly by the Montana DLI Building Codes Bureau in Helena, the same as for residential work.
- Large commercial projects that need outside plan-check or inspection help are billed Actual Costs (including administrative and overhead costs) for that outside consultant work, rather than a flat or percentage fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-26.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Havre building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Havre.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Havre
Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements) in other cities
Look up this fee in a different city →
Now live
Build your Havre project checklist
Describe your project once and get every permit, document, and fee it triggers in Havre — in one checklist. Free, for any city and any number of projects.
Get started →