EV Charger / EVSE Permit — Havre, Montana · Requirements sheet
Verified 2026-07-20 · Source: https://bsd.dli.mt.gov/building-codes-permits/permit-applications/electrical-permits/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Havre, Montana
Havre has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. Because Havre is NOT electrically-certified, EV charger circuit work is issued directly by the Montana Department of Labor & Industry Building Codes Bureau (Helena), not the city, under the 2020 NEC -- the same state form used for all other electrical work in Havre. The state's Application for Residential Electrical Permit (Rev. 11/25) has no dedicated EV/EVSE line item -- its 'Alternative Energy' option only covers Solar/Wind/Hydro generation, not vehicle-charging loads. A single EV charger circuit added to an existing home instead falls under line H, '1 additional circuit or piece of equipment' ($45), the same category used for a hot tub or A/C circuit.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit issued by the Montana DLI Building Codes Bureau (Helena), not the City of Havre, per Title 50, Chapter 60, Section 604 MCA and ARM 24.301.431
- No EV/EVSE-specific line item exists on the state's Residential or Commercial Electrical Permit application -- do NOT select 'Alternative Energy Source,' which is scoped to Solar/Wind/Hydro generation systems, not EV charging
- A single charger circuit added to an existing single-family home falls under line H, '1 additional circuit or piece of equipment'
- New-construction wiring for a charger circuit is included in the applicable new-dwelling amperage-tier fee
- Larger, multi-unit, or commercial charger installations use the Commercial Electrical Permit's valuation-based tiers
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
Tips
- Havre has no EV-specific permit or fee -- since the city is not electrically certified, any charger install is a STATE electrical permit through the Building Codes Bureau in Helena, not the City.
- A single charger circuit added to an existing home is priced the same as adding a hot tub or A/C circuit ($45 flat) -- do not select 'Alternative Energy Source,' which is for Solar/Wind/Hydro generation only.
- Mail applications and payment to PO Box 200517, Helena, MT 59620-0517, or apply online at aca-prod.accela.com/bcb.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Havre building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Havre
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Montana →
Look up this fee in a different city →
Related guides
Now live
Build your Havre project checklist
Describe your project once and get every permit, document, and fee it triggers in Havre — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →