Accessory Dwelling Unit (ADU / Guest House — Class I Accessory Structure) — Las Vegas, Nevada · Requirements sheet
Verified 2026-07-16 · Source: https://www.lasvegasnevada.gov/Business/Planning-Zoning/Building-Safety
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU / Guest House — Class I Accessory Structure) in Las Vegas, Nevada
In the City of Las Vegas, ADUs/guest houses are regulated as 'Accessory Structure (Class I)' under Title 19.04 of the Las Vegas Municipal Code. A Class I accessory structure provides full living quarters including kitchen facilities ancillary to the principal dwelling. A Special Use Permit (SUP) is required in addition to a building permit. Zoning eligibility is limited to R-A, R-E, R-D, R-1, and R-CL residential districts only (confirmed against Title 19.04 Table 2, re-read live 2026-07-16 — R-CL was omitted from an earlier pass). Must comply with 2024 IRC.
Verified 2026-07-16 · Source
When you need this permit
- Special Use Permit (SUP) required prior to building permit — file with City of Las Vegas Planning Department
- Zoning district must be R-A, R-E, R-D, R-1, or R-CL — Class I accessory structures (with kitchen) are NOT permitted in R-2, R-3, R-4, R-5, R-MH, or R-MHP districts (Title 19.04 Table 2, re-read live 2026-07-16)
- Lot or parcel must exceed 6,500 square feet (required by Title 19.04 Class I Special Use Permit Requirements)
- Owner-occupancy of the principal dwelling is NOT a condition of renting the ADU as of July 1, 2026: NRS 278.257 (effective 2026-07-01) bars Las Vegas (population 60,000+) from prohibiting an owner from using an ADU as rental housing, superseding the prior LVMC Title 19.04 owner-occupancy-if-rented condition (the city may still prohibit transient/short-term lodging)
- Building permit required for ADU construction plus separate permits for electrical, plumbing, and mechanical
- ADU floor area must not exceed 50% of the floor area of the principal dwelling unit (Title 19.08 accessory structure size limit)
- ADU height: not to exceed two stories or 35 ft, whichever is less
- One additional parking space required beyond the number normally required for the main dwelling
- ADU must be aesthetically compatible with the principal dwelling unit
- ADU must be located in rear or side yard; minimum 3 ft from side/rear property lines and 6 ft separation from main dwelling
- Must comply with 2024 IRC with Southern Nevada amendments effective January 5, 2026
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Foundation Inspection
Required before concrete pour
- 2
Framing Inspection
Required when framing complete, before insulation
- 3
Final Inspection
Required upon completion; Certificate of Occupancy or equivalent issued
See the full Las Vegas inspection guide — scheduling & re-inspection fees →
Tips
- In Las Vegas, ADUs with kitchen facilities are called 'Accessory Structure (Class I)' in the zoning code — they require a Special Use Permit (SUP) in addition to a building permit
- Eligible zones for Class I (ADU with kitchen): R-A, R-E, R-D, R-1, and R-CL ONLY — confirm your parcel's zoning before applying; R-2, R-3, R-4, R-5, R-MH zones do NOT allow a full ADU with kitchen
- Lot must exceed 6,500 sq ft — smaller lots do not qualify for a Class I accessory structure (ADU)
- As of July 1, 2026, NRS 278.257 bars Las Vegas from requiring the principal dwelling to be owner-occupied as a condition of renting the ADU; the older Title 19.04 owner-occupancy-if-rented rule is superseded (short-term/transient lodging may still be prohibited) Owner-builder
- ADU building permit fees are assessed at the same residential construction rate as new construction — use the city's Permit Fee Estimator for your ADU square footage
- Plan review standard is 2-3 weeks (structural) per published Building & Safety timelines
- Sewer connection charges ($3,235/ERU) may significantly increase total project cost for detached ADUs
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Las Vegas building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Las Vegas
Accessory Dwelling Unit (ADU / Guest House — Class I Accessory Structure) in other cities
Look up this fee in a different city →