Change of Use / Change of Occupancy Permit — Santa Fe, New Mexico · Requirements sheet
Reviewed 2026-07-22 · Source: https://www.srca.nm.gov/parts/title14/14.005.0002.html
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy Permit in Santa Fe, New Mexico
Santa Fe publishes no standalone 'change of use' or 'change of occupancy' checklist among its Construction Permit Submittal Checklists (confirmed by reviewing the full checklist page: only Residential, Commercial, Solar, and Miscellaneous categories exist). Instead, a change in occupancy type, occupant load, or use is processed under NMAC 14.5.2 as an amended building-permit submittal — typically filed using the Commercial Interior/Exterior Remodel/Addition Building Permit Checklist, which requires stating the occupancy classification of building spaces and is reviewed under the state-adopted Existing Building Code — culminating in a Certificate of Occupancy.
Reviewed 2026-07-22 · Source
When you need this permit
- Per NMAC 14.5.2: 'Changes in the work, occupancy type, occupant load or kind of structure authorized by a permit must be reflected in an amended set of submittal documents, which must be resubmitted for approval by the AHJ' (the City's Building Division, acting as the delegated Authority Having Jurisdiction)
- Where the change of occupancy/use involves any construction or alteration, filed via the Commercial Interior/Exterior Remodel/Addition Building Permit Checklist, reviewed under the state-adopted Existing Building Code (International Existing Building Code as amended by New Mexico; the checklist document itself references the 2015 edition, while this file's codesAdopted list documents the 2021 NM Existing Building Code as currently adopted — confirm the current edition in effect with a Building Plan Reviewer at (505) 955-6491)
- Floor plans must state the occupancy classification of each building space and identify the complete exiting system, including occupant load, per the Commercial Interior/Exterior Remodel/Addition checklist
- IEBC-required accessibility (ADA) upgrades apply to the 'primary function area' affected by the change, capped at 20% of the alteration cost under the IEBC disproportionality rule; an ADA Disproportionality Worksheet is available from the City to calculate required improvements
- A Fire Marshal's Office Certificate of Compliance (fire-safety inspection) is required as part of business licensing for qualifying occupancy types (assembly, restaurants, educational facilities, stores, and hotels/motels over 1,500 sq ft, plus home occupancies, food trucks, and temporary structures) before the new use's business registration is finalized
- If only reissuing a Certificate of Occupancy with no accompanying new building permit, a standalone reissue fee applies instead of a full plan review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Building Inspection
Confirms compliance with the amended submittal documents' stated occupancy classification and exiting/occupant-load requirements before Certificate of Occupancy issuance, per the final-inspection provisions referenced at NMAC 14.5.3.9
- 2
Fire Marshal Certificate of Compliance Inspection
SFFD FMO fire-safety inspection verifying 2021 IFC compliance for the new occupancy/use, required before business registration for qualifying occupancy types, per the Certificate of Compliance process
See the full Santa Fe inspection guide — scheduling & re-inspection fees →
Tips
- Santa Fe does not publish a standalone 'change of use' or 'change of occupancy' checklist — a change in occupancy type, occupant load, or use is filed as an amendment to an existing or new building permit application (commonly the Commercial Interior/Exterior Remodel/Addition Building Permit Checklist), per NMAC 14.5.2.
- Budget for a separate Fire Marshal's Office Certificate of Compliance inspection ($25-$300 depending on size/type) if your new use falls into a qualifying occupancy category (assembly, restaurant, school, store, hotel/motel over 1,500 sq ft) — this is a business-licensing prerequisite distinct from the building permit's own final inspection.
- If you only need a duplicate/reissued Certificate of Occupancy and aren't changing anything requiring a new building permit, the standalone reissue fee is $75 rather than a full plan review.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santa Fe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Santa Fe
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across New Mexico →
Look up this fee in a different city →