Residential Building Permit (New Construction) in Santa Fe, New Mexico

Verified

Required for new single-family dwellings, attached/detached units, and guesthouses in Santa Fe. Reviewed against the 2021 New Mexico Residential Building Code (2021 IRC as amended by the state) and the City of Santa Fe Residential Green Building Code, which mandates HERS and WERS energy/water performance ratings for all new residential construction.

Verified 2026-07-02 · Source

From$40.00Administrative Fee — see all 14 fees below

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Administrative Fee$40.00City of Santa Fe Planning and Land Use Schedule of Fees (effective 01/01/2021), Building Permit Activities — Primary Building Permit Administrative Fees section, charged 'Each' in addition to the valuation-based permit fee
Building Permit Fee — construction valuation $1 to $500$25.00Fee Schedule effective 01/01/2021
Building Permit Fee — construction valuation $501 to $2,000$25.35 for the first $500 plus $3.05 for each additional $100 or fraction thereof, up to and including $2,000Fee Schedule effective 01/01/2021
Building Permit Fee — construction valuation $2,001 to $25,000$69.25 for the first $2,001 plus $14.00 for each additional $1,000 or fraction thereof, up to and including $25,000Fee Schedule effective 01/01/2021
Building Permit Fee — construction valuation $25,001 to $50,000$391.75 for the first $25,001 plus $10.10 for each additional $1,000 or fraction thereof, up to and including $50,000Fee Schedule effective 01/01/2021
Building Permit Fee — construction valuation $50,001 to $100,000$643.75 for the first $50,001 plus $7.00 for each additional $1,000 or fraction thereof, up to and including $100,000Fee Schedule effective 01/01/2021
Building Permit Fee — construction valuation $100,001 to $275,000$993.75 for the first $100,001 plus $5.93 for each additional $1,000 or fraction thereof, up to and including $275,000Fee Schedule effective 01/01/2021
Building Permit Fee — construction valuation $275,001 to $500,000$1,830.00 for the first $275,001 plus $7.30 for each additional $1,000 or fraction thereof, up to and including $500,000Fee Schedule effective 01/01/2021
Building Permit Fee — construction valuation $500,001 to $1,000,000$3,518.37 for the first $500,000 plus $5.60 for each additional $1,000 or fraction thereof, up to and including $1,000,000Fee Schedule effective 01/01/2021
Building Permit Fee — construction valuation $1,000,001 and up$5,893.37 for the first $1,000,001 plus $4.40 for each additional $1,000 or fraction thereofFee Schedule effective 01/01/2021
Residential Plan Review Fee50% of the Building Permit FeeFee Schedule effective 01/01/2021
Green Building Code — Early Consultation$100.00 per permitFee Schedule effective 01/01/2021, Building Permit Activities section
Green Building Code — Building Permit Review (Residential)$60.00 per hourFee Schedule effective 01/01/2021
Building Without a PermitDouble the original permit feeFee Schedule effective 01/01/2021

Review timeline

~1015 business days

Typical estimate — confirm current times with the Santa Fe building department

Inspection process

  1. 1

    Footing and Foundation

    Per IRC Section 109.1.1, as referenced by NMAC 14.5.3.9.B(1) — before concrete placement

  2. 2

    Concrete Slab or Under-Floor

    Per IRC Section 109, as referenced by NMAC 14.5.3.9.B(2)

  3. 3

    Frame and Masonry

    Per IRC Section 109.1.4, as referenced by NMAC 14.5.3.9.B(3)

  4. 4

    Weather-Resistive Barrier

    After installation of the weather-resistive barrier, before it is covered, per NMAC 14.5.3.9.B(6)

  5. 5

    Energy Efficiency

    Per NMAC 14.5.3.9.B(7); coordinates with Green Building Code compliance documentation

  6. 6

    Lath and Gypsum Board

    Per IRC Section 109.1.5, as referenced by NMAC 14.5.3.9.B(8)

  7. 7

    Final Inspection

    Per IRC Section 109.1.6, as referenced by NMAC 14.5.3.9.B(11); required before Certificate of Occupancy, along with final HERS/WERS reports

Tips

Frequently asked questions

What building code applies to new home construction in Santa Fe?
The 2021 New Mexico Residential Building Code (2021 IRC as amended statewide by New Mexico), plus the City of Santa Fe Residential Green Building Code, which requires HERS and WERS energy/water performance ratings for all new single-family construction, including guesthouses.
Does Santa Fe write its own building code from scratch?
No. New Mexico's Construction Industries Division adopts uniform statewide construction codes under the Construction Industries Licensing Act (NMSA 1978, Chapter 60, Article 13). Santa Fe operates as a delegated Authority Having Jurisdiction (AHJ) that enforces these state codes through its own Building Division, with only narrow local amendments (plumbing, fire code) plus its own Green Building and Earthen Building codes layered on top.

Sources & verification

Verified against official sources. Last reviewed 2026-07-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Santa Fe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Santa Fe

Residential Building Permit (New Construction) in other cities

Compare residential building permit (new construction) fees across New Mexico

Project checklist — coming soon