Mechanical Permit (Furnace, Gas Line/Meter, etc.) in Unincorporated Iron County, Utah

Required for furnace, gas line, and gas meter installations in unincorporated Iron County. Assessed as a flat Building Permit (B.P.) fee plus the state fee, per the Iron County Fee Schedule.

Verified 2026-07-03 · Source

When you need this permit

  • Furnace installation or replacement
  • Gas line or gas meter installation
  • Gas Sizing Installation form required, per the county's Forms index

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Mechanical (Furnace, Gas Line/Meter etc.)Iron County Fee Schedule, adopted May 26, 2026.
B.P. $111.25 + State Fee
Utah State FeeIron County Fee Schedule, adopted May 26, 2026.
1% of the Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Mechanical Permit (Furnace, Gas Line/Meter, etc.) permit actually take in Unincorporated Iron County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Mechanical

    Ductwork, gas line, and equipment inspection consistent with adopted IMC/IFGC; specific county inspection checklist not separately published online as of 2026-07-04.

  2. 2

    Final

    Final mechanical inspection.

See the full Unincorporated Iron County inspection guide — scheduling & re-inspection fees →

Tips

  • The Gas Sizing Installation form is a distinct required document listed on Iron County's own Forms index — separate from the general Building Permit Application.

Frequently asked questions

Unincorporated Iron County requires a mechanical permit (furnace, gas line/meter, etc.) for: Furnace installation or replacement; Gas line or gas meter installation; Gas Sizing Installation form required, per the county's Forms index. If your project isn't listed, confirm with Iron County Building Department at (435) 865-5350 before starting work.

Per the Iron County Fee Schedule (adopted May 26, 2026), the Mechanical permit fee (furnace, gas line/meter, etc.) is a flat $111.25 plus the 1% Utah State Fee.

Unincorporated Iron County does not publish a plan-review timeline for this permit. Contact Iron County Building Department at (435) 865-5350 for current turnaround.

You'll need: Gas Sizing Installation. See the required-documents checklist on this page for details on each.

Unincorporated Iron County requires 2 inspection(s) for a mechanical permit (furnace, gas line/meter, etc.), in order: Rough Mechanical, Final. Schedule each through Iron County Building Department ((435) 865-5350).

Apply through Iron County Building Department at 82 N 100 E #102, Cedar City, UT 84720. Phone: (435) 865-5350. Office hours: Monday–Friday, 7:30 AM to 4:30 PM, per ironcountyut.gov/building. Building Official: Terry Palmer; Assistant Building Official/Zoning Officer: Nate Dennett.. Official information: https://ironcountyut.gov/building.

Unincorporated Iron County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C & J — Utah Code § 15A-2-103(1)(a); the current edition as of July 1, 2026, with the 2021 edition governing through June 30, 2026. Iron County's own building.gov page and forms index publish no distinct county code-adoption page; under Utah's Title 15A compliance-agency model, unincorporated Iron County is bound by the statewide-adopted editions absent its own published amendment.; 2021 International Residential Code (IRC), including Appendix Q — Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 revision — only the IRC (and NEC) held at their prior editions while the other codes advanced to 2024 — still the current edition.; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); NEC remains 2023 across the 7/1/2026 statutory rollover (not superseded by a 2024/2026 NEC edition in that cycle) — still the current edition.; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026); statute has no residential/commercial split — one edition applies to both.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); current edition as of July 1, 2026 (2021 edition governed through June 30, 2026).; Utah Code § 15A-2-103, in the version headed 'Effective 7/1/2026 / Superseded 1/1/2027', put the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC and ISPSC listed above into effect on July 1, 2026, replacing the 2021 editions; the IRC (2021) and NEC (2023) did not change. The 1/1/2027 version of the statute carries identical editions, so no further flip is expected then. Iron County's own building.gov/building page and its Forms index (ironcountyut.gov/building/forms) do not republish specific code-edition numbers, so the editions here are the statutory default rather than a county-specific citation — Cedar City, by contrast, does publish its own distinct Current Adopted Codes list.. Local amendments apply — see the Unincorporated Iron County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Iron County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Unincorporated Iron County's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Unincorporated Iron County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Unincorporated Iron County lands. Privacy.