EV Charger / EVSE Permit — Unincorporated Iron County, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://ironcountyut.gov/files/auditor/financials/fee-schedule-2026.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated Iron County, Utah
Iron County does not publish a distinct EV charger, EVSE, or electric vehicle charging station permit or fee. EV charger/EVSE installation is electrical work and falls under the county's general Electrical Permit (Service Upgrade, New Meter Base, etc.), assessed as a flat Building Permit fee plus the state fee, per the Iron County Fee Schedule (adopted May 26, 2026). The fee schedule does not publish a separate EV-specific fee line item.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel capacity to serve the charger, covered under the general Electrical Permit category
- Compliance with the 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Wiring, panel, and grounding inspection consistent with adopted 2023 NEC; specific county inspection checklist not separately published online.
- 2
Final
Final electrical inspection.
See the full Unincorporated Iron County inspection guide — scheduling & re-inspection fees →
Tips
- Iron County does not have a separate EV-charger permit — EV charger (EVSE) installations are treated as standard electrical work and pulled under the same flat $111.25 + State Fee Electrical (Service Upgrade, New Meter Base, etc.) permit category.
- This is a simpler flat-rate structure than some cities in the county (e.g. Cedar City) that use a per-square-foot residential electrical fee schedule — confirm which schedule applies for a project inside vs. outside city limits.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Iron County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Iron County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Iron County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Iron County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.