Residential Building Permit (Single Family Dwelling, New Construction) — Unincorporated Iron County, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://ironcountyut.gov/files/auditor/financials/fee-schedule-2026.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (Single Family Dwelling, New Construction) in Unincorporated Iron County, Utah
Required for new single-family dwelling construction in unincorporated Iron County, regulated by the state-adopted IBC/IRC per Utah Code § 15A-2-103. Building valuation for fee purposes is set at $108.46 per square foot for a Single Family Dwelling ($34.09/sq ft for a semi-finished basement, $23.20/sq ft for an unfinished basement) per the Iron County Fee Schedule adopted May 26, 2026.
Verified 2026-07-03 · Source
When you need this permit
- New single-family dwelling construction
- Structural engineered plans required for all dwellings, per the Building & Zoning FAQ
- Soil/geotechnical testing required for any new dwelling
- Utah Prairie Dog Clearance form required (per the county's Forms index)
- Geotechnical Form — Footing Foundation and Geotechnical Form — Backfill Final Grade, both required as distinct submittals per the county's Forms index
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footing/Foundation
Per Geotechnical Form — Footing Foundation submittal requirement, Iron County Forms index.
- 2
Backfill/Final Grade (Geotechnical)
Second-stage geotechnical sign-off per Geotechnical Form — Backfill Final Grade, distinct from the footing-stage form, per Iron County Forms index.
- 3
Framing
Structural framing inspection consistent with adopted IBC/IRC requirements; specific county inspection checklist not separately published online as of 2026-07-04.
- 4
Final
Final building inspection prior to occupancy.
See the full Unincorporated Iron County inspection guide — scheduling & re-inspection fees →
Tips
- Iron County requires TWO separate geotechnical form submittals — Footing Foundation and Backfill Final Grade — a two-stage process distinct from Cedar City's single combined Geo-Technical Data Sheet.
- Building valuation is set per square foot by occupancy type ($108.46/sq ft for a Single Family Dwelling) per the county's own Fee Schedule, rather than a contractor-supplied estimate — Remodel permits are the exception, valued at 'Contractor's Estimate.'
- No building permit fees are refunded after 180 days, and plan review fees are never refundable, per the Iron County Fee Schedule and Building & Zoning FAQ.
- A Utah Prairie Dog Clearance form is required — the same regional Endangered Species Act consideration documented for neighboring Cedar City.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Iron County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Iron County
Residential Building Permit (Single Family Dwelling, New Construction) in other cities
Compare residential building permit (single family dwelling, new construction) fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Iron County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Iron County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →